Loading...
Preliminary Storm Drainage Report Preliminary Storm Drainage Report For Erika Court Subdivision Tigard, Oregon March 29, 2016 For Pacific Evergreen Homes Portland, Oregon (WCI Project Number 2511-007) Table of Contents 1.0 PROJECT OVERVIEW 2 2.0 WATER QUALITY ANALYSIS 3 3.0 DETENTION ANALYSIS SUMMARY 4 4.0 CONVEYANCE ANALYSIS SUMMARY 4 5.0 SUMMARY 4 APPENDICES: Appendix A: Site Plan, Extended Dry Basin Details Appendix B: Detention Analysis (HydroCAD) Appendix C: Conveyance Analysis Appendix D: NRCS Soil Reports 2511-007 Storm Report Page 1 of 5 PROJECT OVERVIEW Introduction This project is located at 14259 SW 100th Ave and has a total area of 3.31 acres. The site contains an existing residential home and various out buildings. The remainder of the site consists of a gravel driveway, and a combination of grass and tree areas. The existing residence and out buildings will be retained on the site. This development will provide 9 additional new single family residential homes with a public street. Storm laterals will be provided to each lot and will be directed to a new public storm main located in the proposed public street. The public storm main will discharge into a new water quality and detention facility (Extended Dry Basin) located at the northeast corner of the property. Additionally, storm runoff from the adjacent property will be piped and bypassed with a separate storm conveyance through the property and connected to the existing storm system in SW 100th Avenue. The water quality and detention facility will be designed according to the requirements set forth in Clean Water Services "2007 Design and Construction Standards for Sanitary Sewer and Surface Water Management" Chapter 4, Section 4.06.3. The outfall from the stormwater facility will be into the existing storm system in SW 100th Avenue. The site topography slopes generally from the southwest to the northeast. Analysis Purpose The purpose of this Drainage Report is to analyze and size the following: 1. Water quality treatment facility (Extended Dry Basin) 2. Detention facility (Extended Dry Basin) 3. Pipe Conveyance Discussion It is assumed that there are downstream deficiencies; therefore a detention facility will be constructed at the site. The detention facility will assure that the 2, 10, and 25-year post-development runoff rates will not exceed their respective 2, 10, and 25-year pre-development runoff rates per the Clean Water Services "2007 Design and Construction Standards for Sanitary Sewer and Surface Water Management" Chapter 4, Section 4.03.4. The east portion of the existing pavement for SW 103rd Avenue, south of the proposed public street into the site, will be not included in the stormwater detention and water quality treatment calculations for the site, it will be piped into the existing conveyance system on the west side of SW 103rd Avenue. In addition, the west portion of the existing pavement for SW 100th Avenue, north of the proposed public street into the site, will be not included in the stormwater 2511-007 Storm Report Page 2 of 5 detention and water quality treatment calculations for the site, it will be piped into the existing conveyance system on the west side of SW 100th Avenue. It is requested that the runoff from the existing development to the south be piped through the site and bypassed, it will be piped into the existing conveyance system on the west side of SW 100th Avenue. See Site Plan in Appendix A. WATER QUALITY ANALYSIS For water quality, the system shall treat the total precipitation of 0.36 inches falling in 4 hours with a storm return period of 96 hours. For water quality treatment, the treatment will be completed by an Extended Dry Basin. The Extended Dry Basin is designed per criteria included in Clean Water Services "2007 Design and Construction Standards for Sanitary Sewer and Surface Water Management" Chapter 4, Section 4.06.3. Prior to runoff entering the water quality facility (Extended Dry Basin), a water quality manhole will be constructed for pre-treatment per Clean Water Services "2007 Design and Construction Standards for Sanitary Sewer and Surface Water Management" Chapter 4, Section 4.06.1. The total existing and future impervious areas for the site have been used to size the water quality facility as shown below. Water Quality Volume Calculations: Total impervious area: = 53,800 sq. ft. = 1.2 acres Water Quality Volume: WQV (cf) = 0.36 (in) x Impervious area (sf) 12 (in/ft) = 0.36 (in) x 53,800 (sf) 12 (in/ft) = 1,614 cubic feet Water Quality Flow: WQF (cfs) = WQV (cf) = 1,614 (cf) 14,400 seconds 14,400 seconds = 0.11 cubic feet/second Water Quality Surface Calculations: The water quality volume of 1,614 cubic feet is required to be contained in the extended dry basin at an elevation above the dead pool storage. The required detention storage in the extended dry basin will be above the water surface elevation required to store the water quality volume of 1,614 cubic feet. Water Quality Volume Draw Down: The orifice sizing for the Extended Dry Basin, which requires water quality drawdown time of 48 hours, will be calculated at final engineering. 2511-007 Storm Report Page 3 of 5 DETENTION ANALYSIS SUMMARY Detention calculations will be performed using the HydroCAD Version 10.00-16 design and analysis software. Calculations are based on the Santa Barbara Urban Hydrograph runoff method (SBUH) using the Type 1A, 24-hour storm events as required in the Clean Water Services "2007 Design and Construction Standards for Sanitary Sewer and Surface Water Management". In conformance with Clean Water Services "2007 Design and Construction Standards for Sanitary Sewer and Surface Water Management" Chapter 4, Section 4.05.5, impervious areas for each lot of 2,640 square feet will used in the design and analysis of the detention facility for the site. Pre and Post curve numbers used in the detention analysis will be based on the existing and proposed soil conditions at the site based on soil Hydrologic Soil Group C. See Appendix D for existing soil information at the site. Rainfall depths used in the detention analysis for the 2, 10 and 25 year Type 1A 24-hour storm events are as follows: • 2-Year 2.50 inches • 10-Year 3.45 inches • 25-Year 3.90 inches • 100-Year 4.50 inches The detention facility will be sized to assure that the 2, 10, and 25-year post- development runoff rates will not exceed their respective 2, 10, and 25-year pre- development runoff rates. CONVEYANCE ANALYSIS SUMMARY Stormwater runoff from this site will discharge into an existing storm sewer pipe located in SW 100th Avenue. The storm sewer system for the site will be sized to convey the 100-year storm event. Emergency overflow from the stormwater facility (Extended Dry Basin) will overflow through the ditch inlets in the stormwater facility and discharge into the existing storm drain pipe in SW 100th Avenue. SUMMARY This analysis demonstrates that the stormwater design for the Erika Court Subdivision will comply with the requirements set forth by Clean Water Services and the City of Tigard upon final engineering. 2511-007 Storm Report Page 4 of 5 Appendix A: Site Plan, Extended Dry Basin Details III 0 III DD Z 2- II IIIIII II IIITT I1 11 00(9 111 IIIA III 1II a o Loo 30' 0 15' 30' 60' • SCALE: 1 INCH = 30 FEET F / I Iii I � \' W Ilei i/ I \I z CV r^ w d i` ICV I I C 1 o v // I '1:Va�• I I B G) I I /` \ 1 a <4 7 gacz I- 0 �1/ li, \I o \ LN\\ �..I..� z Z a�r"w I _ii I ` _ W o .'&' )1 I 1 / -1 OH Z �C!] A �� I �s I \\\\\\\\\\\\` Z Cll.') cl - —p I , / \\\\\\\\\\\\\\\\\\\�\\\ W p,.-4[• l �I13 .I -un •- I / 014--- ' H '1 y ��'J1 1 II \ i3 M11 ✓ \6 _ 4 1 1� _ LEGEND / t, I i-i�3 -a+■• I _\ — — BOUNDARY LINE o , II�==' — — EXISITNG RIGHT-OF-WAY - -'-'i \3191 ' I 320l� 1 � � I �� - � EXISTING CENTERLINE • / \ ���Y EXISTING LOT LINE / 327- - I - - _ LJ //"` ', I _IS ' 1/ 321f,,, V► H - - --- " - \x _-x x x - - y„ _ - s� �• o, -i` - - PROPOSED RIGHT-OF-WAY ,�/.��,. �ID Y2I' � \ \ ^v o o � ' ATX,''' _ -1-- I' - - PROPOSED LOT LINE G�llq" -5'. - Tr i-5- \ \ \ \ \ \ I 1 1 _ J II _ — — I •• �� ,•,6' ; PROPOSED EASEMENT CC \ 1 r oN ��01. I 1 b''li' 1 ' - — \—\ I — 1 — I I ( j �' 1 \ �I ` _ �I ) 1 DRAINAGE BASIN BOUNDARY I \ \41 \I F I ,� EXITING TIME-OF-CONCENTRATION lii„'� '`' � , , �' y\ /"5-52i — � � \ �.\ \ \\ \ I I Go r 1 I I \ \ \\ L C� 0 Q .,.,._t co , 6 _ 1 .1h j334 \ \ \ 1 I I I�1� \ III I I I I ,III 7 I _ _ ... _X13 0 1 s 12-67,0S.F:dt \\ 11639 S• F• i I 1 I I 1 ' , 639 S\F. \ 9, 520 S• F. O I , ,1 zZ o — � � 36, \ \ I � 0,D4, ,�. F. I \ 1 I , I I rn - - I > N3 // 1�1 ,33,, \I III I I N I I I I I I S Q Q \ I co 7_133'4 /ii / � — 8\ \ I \ \ \ \ I I I I I I \ I \ \ \ \ 14 - y _ I - 31„ \ I- M llAl �� \ \\ \ \ \ I o N I I I ` \ \ 3 �l O �' - / '/ `339 \ \ \ \\ �, �`' I I \ \ \ \ \� � \ . 3165 I - � ` OO 32'J1333 , 1 /•/ j \\ \ I \ "' I I It I I I \ \ \ I \ \ I 317 ilt- I -Iall / i` � _ X13 + < V) \ \ \ \ \ w I I I I \ \I I \ \ 3TC1 - — (n 3 al \ d \ c - - - \\ \ — _� -- i 1 1 \ \ \\\� ...-• . \ _ 4 --illiiiiii — , cn ►Ie�� , 1OH dt ›- y N' ipp 1--- cl 3 I • l _ ►.` ���off rte' :;113 9; _ H,_ , x-------Ii------4 —=.---- -i‘i- _____, „ ' . ... . -- \ • •" . .1 I \ _ _ r1✓ 11 39,0 - O _ a 4. 401161111 1 „� 411 _Ii \d d • d • • —�� .•d ''� .• of . "� • _ � w i _ — - - - 4.in ILI - -7> 111 13 II r �. ►N M �� III 1 '11 \\ \ — r r� \ �/��W& I‘11110115111-OM _ ri 1Y 1 1 4 oil ___-__ ___,___ 0\ \ Co \ 0; f;:)) \I'r) 1'r) —— 11-01104 1i WWI -- -, c 3 ,...- --"-- __ I i 1H I a . • . d\ • •1 N • • • •, I 324 / J- —I ���g - o eN I � 3g5 �3 111. j d . . . ' • a ��� ® • � \ - - III �( _ _ � _ _�, _ . � _ 1 � � y; � y .\ . \ � I :.• \ \ � / ; / '� 6 N �II I I 46 I/, ���� \ mil s \ -- \ \ \ \\ \ 25 / I ` o III I . _ iF)! — — — — — — 1 1 d..\.• i \ I '4'.. �`' - I \ \ \�.IX326 // // — _ - -+1 � S��- _ ►111 I 48 , Iii \ I\ I \ \ \ ` \ 1 \I\ \ \ \ \ \ ,\ � \ ? 2,\ _ _ _ _ ,` -'1 ' F_ I . bias 1I > \ \ \ J — _ _ ,....„ . ,„ „,.., III r b f�_ off \ / , \ \ \ . \ \ \ \ \ \ 1 I \ \ \ 23\ IHIj7 i ,J f,/ I ,33333,___ __; x ____.,„ , c, cv �.L� II \ I I\ \ \ \ \ \ \ \\ \I \ - - _,j`.- 5• 1 III / \ \ 1 I \ 11 I \ \ \ \� I\ \ \ I \ � ,3 I j - - - - - _I , //- `i.„ / / X33 \�I 'h /^ J \ I I \ I 0 \49 2 F� �\ 6�0 6 SAF. \ 8, S12 S• 9�3 01 .E- — I / ` // // — 336 ATHESE DRAWINGSARETHEPROPERTY OF Q 5 I I I I \ , `�• \ \ \ `33 I / / I/ / — IV, WESTLAKE CONSULTANTS INC. (WCI) AND m 1 I • II / I, I I I \ I \ \ \ \ \ \ \ \ I\ I I `33 I I I _ _ - - - — �c- — / / / / ' -- ' \3 ARE NOT TO BE REPRODUCED IN ANY I II =/ I I \ \ I \ ` \ I / \ �j�_ 3, PERMISSIONMANNER COEPTNWITH THE WRITTEN • \ 1 _1 CI I ME /I J \ I I \ \ \ \ \ \ ��� \\ \._ _ 1 - ��� ' - /// - -r�i II / / ISI �.. I �I/ ��M l l l l 1 \ \ \ I( 1---- \ \ \ \ \ I \\ \ �� �V, \ - - - -\ 1 / / / L // II I°° / \ I I ` qI 4 4 _ --7 � J -- \ I \ \ \ I k� / / II I 5 -- '_ - -- \ \ � \ \ \ \I I I `39 \ , I 1 1 \ \ I % 'r j/ III` 1-. I oz 1 -(-\� -- \ \ \\ \ \ I.4\ \ \ \� x , Xo _\ _\ �- — \ I $ // \ \\ ^� /i/ II om 5 b _ \ .� / w 11- I �5 ye I \ \ \ \ \ \ \ \ \�- f _ / _ - - - // 1K \\ _ _ — x x .. �oiii �j56 ��� � \z „ \\ \\\ \\ \ \ \ \\\ \ \\ \\ \� \ \ \ - - .I P. O. nI I \ N ciJ • j ��f% I A\ x 'V .d o j y, IC ,t L, I\ �Ir'u4 7 I X X X `i 6 Z Q 11 o / j ! \ I = O a �I mo\ V1 I� •i1 I \ / ••• w Q o �6 I z O 1 I N 'la eO o SHEET G--) o W / --,, ,,..,,. A- oio,i--, V14.• / APPX. A z o, JOB NO. 2511 — 007 / PL TOP OF WALL ,i'' '\ As x MIN 1' FREEBOARD — 2' f 3 / 1 0 v �� 25—YR TOP OF POND ! 0 10—YR Z „ m i% Q 2—YR 3 �'�� Q WQ �,� RETAINING WALL ' '"';1'111,, �,;y'''�' HEIGHT VARIES JUTE MATTING 1 IF,,la''!'I I�,,,la, �, ,,, ,,�," 1,,,�,},�,,,,�,,,in,I - KEYED IN AT TOP �'•\ L— W 12" MINIMALLY COMPACTED COMPACTED SUBGRADE PERMANENT POOL DEPTH=0.4' Z TOPSOIL MIXTURE MAX. SLOPE 3: 1 POND BOTTOM g 5 TYP. BOTH SIDES a TYPICAL EXTENDED DRY BASIN CROSS SECTION A-A NOT TO SCALE L, 0 w 1 DATE R DRAWN 2O 7-O3-AO Y 1 ��\ �, TL KE JAB CONSULTANTS INC.i I CHECKED BY DCN ENGINEERING • SURVEYING • PLANNING REVISION z 15115PACIFIC CORPORATE S.W. EQUO A PARKWAY, SUITE 150 (503) 684-0652 .o JOB NO . TIGARD, OREGON 97224 FAX (503) 624-0157 2511-007 PL PL TOP OF WALL TOP OF WALL I I 1'a HI/ MIN 1' FREEBOARD — 2' f ) 7 25—YR 3 0 10—YR / „ V 2—YR RETAINING WALL ,ff f ���1 y WQ ������'� \ RETAINING WALL HEIGHT VARIES �'�'r%111�1 ce- 3.• � HEIGHT VARIES , f \N O U JUTE MATTING KEYED IN AT TOP COMPACTED PERMANENT POOL DEPTH=0.4' SUBGRADE POND BOTTOM MAX. SLOPE 3: 1 12” MINIMALLY COMPACTED g TYP. BOTH SIDES TOPSOIL MIXTURE W a TYPICAL EXTENDED DRY BASIN CROSS SECTION B-B NOT TO SCALE L, 0 w L, DATE R DRAWN 8017-03—AO000 ��\ �, TL KE JAB iii CONSULTANTS INC. CHECKED BY DCN ENGINEERING • SURVEYING • PLANNING REVISION Z0 15115PACIFIC CORPORATE S.W. EQUO A PARKWAY, SUITE 150 (503) 684-0652 .o JOB NO . TIGARD, OREGON 97224 FAX (503) 624-0157 2511-007 III- EMI 1 WALL SECTION AND INTERIOR DIMENSIONS IN ACCORDANCE WITH MAXIMUM WATER SURFACE ELEVATION YR) • STD. DWG 390 ° 3" MINIMUM WHEN USED WITH '•d 1• . ///\ EXTENED DRY POND .4 . FRAME: GRATE PER v ••e ,/�� PERPROMENEVIDE NT POOL(APPROXDEPTH5") 0 STD. DWG 400 ' d: v v —SWALE BOTTOM ' POND BOTTOM Q- ••1 ddb i\\ \ STORM SEWER OUT v' 6; PLATE AND o ::�����iX%\\\ \ GUIDE (SEE iN. ? ANCHOR TO WALL WITH DRAWING NO. 730 �e, 4• + ,o' STAINLESS STEEL RISER e , — A CLAMP OR 2" MIN. STAINLESS v — STEEL BAND AND STAINLESS •• , Q St STEEL ANCHORS. MINIMUM OF e• ••"a 2 PLACES. ' t- 18" .v IIIMpL ao ' o,4 G, Q. v V. • Wit ; . #. t P. ,i 4 0 4,-4 • 0.1 'Q•: SECTION A-A CLAMP DETAIL r SELF TAPPING CONCRETE ANCHORS, PHILLIPS 5-12 OR APPROVED EQUAL. r X 1-4" STAINLESS STEEL BOLT. NOTES: 1. CONNECTING PIPE AND TEE SHALL BE 4", 6", OR 8" AWWA C-900 OR ASTM 3034 PVC,AND ONE SIZE LARGER THAN THE ORIFICE OPENING. 2. MAXIMUM ORIFICE OPENING SHALL BE 6" DIAMETER. 3. STRUCTURES SHALL CONFORM TO STANDARD DRAWING NO. 390 DITCH INLET. 4. FRAME AND GRATE SHALL CONFORM TO STANDARD DRAWING NO. 400, DITCH INLET FRAME AND GRATE. 5. PLATE AND GUIDE SHALL BE SECURED FLUSH AGAINST WALL OF STRUCTURE AS APPROVED. 6. MAINTAINANCE ACCESS REQUIRED TO WITHIN 10' OF CENTER OF BOTH STRUCTURES. 7. FOR APPROVAL OF ALTERNATE STRUCTURES SEE SECTION 1.17. OUTFLOW CONTROL STRUCTURE C1eanWate\ Services DRAWING NO. 720 REVISED 11-06 Our commitment is clear. 3/s" STAINLESS STEEL CHAIN OR CABLE ATTACHED TO ORIFICE PLATE AND STRUCTURE AS APPROVED. CHAIN OR CABLE .11 SLOT SHALL BE !1 SHALL BE SMALL ENOUGH TO ALLOW ORIFICE I PLATE TO BE REMOVED FROM GUIDE. ORIFICE "X5" CENTERED 1i1rr PLATE AND GUIDE TO BE MANUFACTURED FROM Y2" HDPE OR Y4" STAINLESS STEEL. et ei o �� h1 /' .,a (11 , 2" 0 ORIFICE SIZE 0 ORIFICE ELEVATION ALIGN INVERT OF ORIFICE TO SPACER REQUIRED FOR INVERT OF PIPE. MULTIPLE ORIFICES 3 I I 1 tI PLATE THICKNESS +1/4" 1 1/2" MIN. —NI— TOP OF ODE — 2"MIN. ±3" BELOW GRATE 3 o (-- O � � O -.- o � f f 10" MINIMUM • 6" (TYP.) z cel o 0 o 2"MIN. 2"MIN. ' f 0 O 0 '‘N ORIFICE PLATE GUIDE SHALL FIT STOP GATE AND INCLUDE BOTTOM CHANNEL ORIFICE PLATE GUIDE. NOTE: Y2" SELF TAPPING CONCRETE aa FOR MULTIPLE ORIFICE APPLICATION ANCHORS, PHILLIPS 5-12 OR d o A 3" MIN. SPACER IS REQUIRED AS APPROVED EQUAL. SHOWN. SPACER TO MATCH PLATE GUIDE Y2" X 1—Y2" STAINLESS STEEL a BOLT. DIMENSIONS, WIDTH, MATERIAL WITH A WATER TIGHT SEAL. O�IEICE PLATE A\ D GUIDE CleanWate Services DRAWING NO. 730 REVISED 12-06 Our commitment is clear. Appendix B: Detention Analysis (To Be Completed at Final Engineering] Appendix C: Conveyance Analysis (To Be Completed at Final Engineering] Appendix D: NRCS Soils Report 1� Hydrologic Soil Group—Washington County,Oregon 516560 516980 517000 517020 517040 517060 517080 5171C0 517120 517140 517160 517180 517200 45°25'3"N _ 45°25 3"N 7 � 1 • . s ." 9913 I 0 • i 411 . a M O 3 co ilium - �4 d mul 11 ;s. — Act - 4 ''' . 111111111111 0 111 r no G _ -r20oe be valid at'.hic' -I Is' 45°24'57"N — - - +. 45°24'57"N 516960 516980 517000 517020 517040 517060 517080 517100 517120 517140 517160 517180 517200 3 3 Map Scale:1:1,130 if printed on A landscape(11"x 8.5")sheet N N Meters 0 15 30 60 90 .. Feet 0 50 100 200 300 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UrM Zone 10N WGS84 USIM Natural Resources Web Soil Survey 3/29/2017 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Washington County,Oregon MAP LEGEND MAP INFORMATION Area of Interest(AOI) ® C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) CID 1:20,000. Soils D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons I A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil I A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed 0 B scale. Transportation B/D EFF Rails Please rely on the bar scale on each map sheet for map CInterstate Highways measurements. I C/DUS Routes Source of Map: Natural Resources Conservation Service whoD Web Soil Survey URL: Major Roads Coordinate System: Web Mercator(EPSG:3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • , A _ distance and area.A projection that preserves area,such as the Aerial Photography Albers equal-area conic projection,should be used if more • r A/D accurate calculations of distance or area are required. B This product is generated from the USDA-NRCS certified data as 1..-w+ B/D of the version date(s)listed below. C Soil Survey Area: Washington County,Oregon Survey Area Data: Version 14,Sep 16,2016 rV C/D Soil map units are labeled(as space allows)for map scales r�r D 1:50,000 or larger. • • Not rated or not available Date(s)aerial images were photographed: Aug 3,2014—Aug Soil Rating Points 23,2014 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background p A/D imagery displayed on these maps.As a result,some minor O B shifting of map unit boundaries may be evident. O B/D USM Natural Resources Web Soil Survey 3/29/2017 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Washington County,Oregon Hydrologic Soil Group Hydrologic Soil Group—Summary by Map Unit—Washington County,Oregon(OR067) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 11B Cornelius and Kinton silt C 2.1 37.2% barns,2 to 7 percent slopes 11C Cornelius and Kinton silt C 3.5 62.8% loarns,7 to 12 percent slopes Totals for Area of Interest 5.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D)and three dual classes (ND, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 3/29/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Washington County,Oregon Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 3/29/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4