Loading...
Applicant's Completeness Letter WestlakePLANNING I ENGINEERING I SURVEYING consultants inc July 12, 2017 Monica Bilodeau CITY OF TIGARD 13125 SW Hall Blvd. Tigard, OR 97223 RE: Erika Court Subdivision FILE#: SUB2017-00003 Response for additional information - Completeness of Application Dear Monica, This letter is submitted in response to your incompleteness letter dated May 1, 2017 requesting additional information in order to deem the Erika Court Subdivision, File #SUB2017-00003 complete. This letter and enclosed materials are submitted by the applicant to supplement the application plans, narrative responses, and exhibits submitted to date. As per your letter, three (3) hard copies and a CD of all original and revised materials are enclosed. Each of the items in your letter are addressed as follows: Information Necessary to Complete Application: 1. It is imperative that thru vehicular connection is provided between Jason Ln. and 100th Ave. This can be achieved by realigning the east end of Jason Ln. toward the north and reconfiguring of Lot 6 and the Storm Tract. Response: The enclosed Preliminary Engineering plan set has been revised to depict the full street connection of SW Jason Ln. between SW 103rd Ave. and SW 100th Ave. 2. Plan set must show all neighboring parcel grades. Response: The enclosed Preliminary Engineering plan set has been revised to depict the grade of adjacent properties. 3. Plan set must show street profiles. Response: The enclosed Preliminary Engineering plan set has been revised to depict street profiles. 4. Applicant's narrative shall mention paying Sewer Reimbursement District#42 as of February 28th 2017 fee of$95,372.46. Response: Applicant's narrative has been revised to acknowledge payment of fees to the Sewer Reimbursement District#42. 5. Plan set must show all water lines on SW 100th and SW 103rd Response: The enclosed Preliminary Engineering plan set has been revised to depict water lines in SW 100 h Ave. and SW 103rd Ave. 6. Plan set must show fire hydrant on SW Jason Ln Response: The enclosed Preliminary Engineering plan set has been revised to depict the fire hydrant on SW Jason Ln. Pacific Corporate Center 15115 SW Sequoia Parkway, suite 150 Tigard, Oregon 97224 www.westlakeconsultants.com PH-503-684-0652 FX-503-624-0157 Erika Court Subdivision Case File No.:SUB2017-00003 July 12, 2017 Page 2 Approvability issues: 6. 18.810.030 H. Street connections-A full street connection is required in order to make these findings. No evidence has been provided to demonstrate barriers beyond your control that prevent the connection. The street can be redesigned to the north to allow for a minimum of 24 feet of pavement and no sidewalks to allow for a full connection. Response: The enclosed Preliminary Engineering plan set has been revised to depict the full street connection of SW Jason Ln. and SW 100th Ave. 8. 18.810.040 Blocks -the proposed project does not meet block length requirements of 2,000 feet as referenced in Section 18.810.040. As currently proposed staff cannot make the findings to support this project. Response: The existing block length formed by SW McDonalad St., SW 103rd Ave., SW Inez St., and SW 100th Ave. is approximately 4,166 feet. The connection of SW 103rd Ave. and SW 100th Ave. via the proposed street, SW Jason Ln. will reduce block length formed by SW McDonald St., SW 103rd Ave., SW Jason Ln. and SW 100th Ave. to approximately 2,569 feet. Due to the configuration of the existing street network, it is not feasible for the development of the subject property to reduce block length beneath approximately 2,569 feet. Public Facility Plan Completeness Checklist: Grading Plan: - The enclosed Preliminary Engineering plan set has been revised to depict the grade of adjacent properties. Street Plan: - The enclosed Preliminary Engineering plan set has been revised to depict street profiles. - TVF&R turnaround is not necessary as Jason Ln. is a through street. Sanitary Sewer Plan: - Applicant's narrative has been revised to acknowledge payment of fees in the amount of $95,372.46 to the Sewer Reimbursement District#42. Water Plan: - The enclosed Preliminary Engineering plan set has been revised to depict water lines in SW 100th Ave. and SW 103rd Ave. - The enclosed Preliminary Engineering plan set has been revised to depict existing and proposed water lines and sizes. - The enclosed Preliminary Engineering plan set has been revised to depict fire hydrant on SW Jason Ln. With submittal of this letter and enclosed revised materials, it is our understanding that this land use application is complete. We look forward to your confirmation of completeness. Please feel free to contact me if you have any questions. Sincerely, Westlake Consultants, Inc. I Kenneth L. Sandblast, AICP Director of Planning Pacific Corporate Center 15115 SW Sequoia Parkway, suite 150 Tigard, Oregon 97224 www.westlakeconsultants.com PH-503-684-0652 FX-503-624-0157