Loading...
01/21/1960 - Minutes SPRCIAL MEETING TIGARD WATER DISTRICT TIGARD OREGON � - January 21, 1960 Present, A.J.Xhavez president, A,G.Ames, Curtis Tigard, C.F. Nicoll, E.C. Phillips Commissioners, J.P.Lohrenz Supt, E.W. Carter Eng. and six bidders. The president called the meeting to order at 8.30 P.M. Oclock, The meeting was held in the offices of the District at 8841 SW. Commercial Street, Tigard, Oregon The purpose of the special meeting was to open bids and accept one for the construction of the new tank at Well # 3. The Engineer Elden W. Carter opened and read the bids as sub- mitted as follows:- 1 Riverside Construction Co. P.O.Box 3853, Portland 8, Oregon Their bid was $35,242.50. 2 Charles S. Camplan 2035 S.W. 58th. Ave. Portland, Oregon Their bid was $32,772.50 3 L.B. Read 2607 S.W. Sunset Blvd. Portland 10, Oregon Their bid was $32,445.50 4 Bickford Construction Co. 823 S.E. 28th. Portland 14, Oregon. Their bid was $31,352.00. 5 Schrader Construction Co. 3621. S.E. 52nd. Ave. Portland, Oregon Their bid was $31,980.00 6 Zuber Bro. 3600 S.E. 28th Ave. Portland Oregon Their bid was 03,495.00 Curtis Tigard moved and A.G.Ames seconded that the bid of Dickfor Construction Co. bid # 4 be accepted, after the bid has been approved by the Engineer E.W. Carter. The motion carried. PresidentAmaik_ Adi ! , Sec A.G. Ames moved and E.C. Phillips seconded that the meeting adjourn. The motion carried. President q4 d Secretary�����