Loading...
03/29/1960 - Minutes SPECIAL MEETING TIGARD WATER DISTRICT TIGARD OREGON MARCH 29, 1960 Present, A.J. Chavez, President, C.Tigard, C.F.Nicoli, C.E.Phillips A.G.Ames, J.P.Lohrenz, E.W.Carter, Eng. , and bidders. There were 21 persons present. The purpose of the special meeting was to open bids for the new tank at Well #1, and matters pertaining there to. The meeting was called to order by the President. The president turned the meeting over to the Engineer E.W. Carter to open and read the bids. The bids submitted were as follows. Bickford Construction Inc. 51,370.50 Geo. W. Phoenix 57,349.00 Ken Ward Steel Buildings 58,085.20 EVerett L. Wiggins 59,233.75 G.H.Settergreen 55,894.00 I.B.Reed 55,625.50 John Kovlynovich 67,796.50 L.F.Henshaw 54,472.50 Paul S. Taggart 52,247.25 Schrader Cons. Co. 58,826.00 Huber Bro 54,380.00 C.M.Camplam Co. 53,737,75 C.E.Phillips moved, C. Tigard seconded that the bid of Bickford Construction Inc. of 823 S.E.th Ave. , Portland 14, Oregon be accepted, if approved by the engineer E.W. Carter. The motion- carried. C.F. Nicoli moved C.E. Phillips seconded, that the estimate #1 for March 1, 1960 in the amount of $1015.20 on the new tank at Well #3 , of Bickford Construction Inc. be paid. The motion carried. C.F.Nicoli moved, C.E.Phillips seconded that the meeting adjourn. The motion carried. President �' ---Sec. -