Loading...
07/11/1961 - Minutes ,CEIFT3 DISBUA3LMENT5 TIGAD WATER DI3MICT ITARDIOREGO JULY,1961 Beginning 9a1ance July 1st 2026.00 Deposited During the Month +-e; • Checks by Dank 6 - • 5 Outstanding Checks 394..12_ Balance in Bank 4765.67— Water Charges for the Month 5856.15 Cubic Feet of Water 'used : 129900 Renters Balance 510.00 Bull Mountain Fund Balsnce 5537.77 Bonds and Interest Fund 20820.r)7 Teter Installations July 1961 No. Name Yeter aterial Labor Cost ;.mt.Paij • 1063 James Allock 30.90 12.65 12.00 55.55 90.00 1064 Vaul G.iogere 30.90 10.55 21.75 63.20 90.00 1065 Vance R. Lee 30.90 17.45 14.25 62.60 90.00 1066 Antone lioshak 30.90 25.35 17.50 73 .75 90.00 123 .W bb.00 b5.50 55.i3 360.00