Loading...
Permit CITY OF TIGARD SITE WORK PERMIT COMMUNITY DEVELOPMENT Permit#: SIT2020-00009 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/3/2021 Parcel: 2S102CB00100 Jurisdiction: Tigard Site address: 12850 SW GRANT AVE Project: Broadway Rose Theatre Subdivision: NORTH TIGARDVILLE ADDITION Lot: 43 Project Description: Engineered aggregate pier system for East and West additions. Contractor: GEOTECH FOUNDATION COMPANY WEST Owner: TIGARD-TUALATIN SCHOOL 214 SE WALNUT ST DISTRICT 23J HILLSBORO, OR 97123 6960 SW SANDBURG ST TIGARD, OR 97223 PHONE: 503-640-1340 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 04/29/2021 $1,056.37 Plan Review 04/29/2021 $686.64 Type of Use: COM 12%State Surcharge-Building 04/29/2021 $126.76 Class of Work: ADD Info Process/Archiving-Lg$2.00(over 04/29/2021 $4.00 11x17) Project Valuation: $155,000.00 Info Process/Archiving-Sm$0.50(up to 04/29/2021 $10.50 11x17) Site Specifics: Excavation Volume: cu.yd. Fill Volume: 1 cu.yd. Impervious Surface: 0 sq.ft. Engineered Fill: No Soil Report Required: No Paving: No Grading: No Landscaping: No Site Prep: No Storn Drains: Retaining Wall: No Fire Underground: No Accessible Parking: No Fence: No Total $1,884.27I Required Items and Reports(Conditions) 1 Piles/Caissons This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 5033.2323322.1987 or 1.800.332.2344. /� y Issued By: GJ' Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVE FOR OFFICE USE ONLY City of Tigard Date/B // fiij Permit No.: /� lir13125 SW Hall Blvd.,Tigard,OR 97223 MAR 19 2020 Plan Revie e t+a� /J Related Perm t:g{�`✓ v! Phone: 503-718-2439 Fax: 503-598-1960 Date/By: 7 '- rF/'r'� /®J Inspection Line: 503-6394175 Date ReadyBy: / ) Jrt,1 /�_� kris: See Page 2 for TIGARD CITY OF TIGARD Notified/Method.`1l pc7f'2` 87f ,"2,j Supplemental loformadou Internet: www.tigard-or.gov RI ill nIme,DIUis(nr _ If 1 '''�1 TYPE OF WORK DATA:I-AND 2-FAMILY DWELLING ❑New construction ❑ Demolition Pe fees*are based on the value of the work performed. Indica e value(rounded to the nearest dollar)of all •Addition/alteration/replacement ❑Other: DEFERRED SUBMITTAL equipmen aterials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicat on this application. Valuation: $ ❑ t-and 2-family dwelling I.Commercial/industrial Number of bedroo ❑Accessory building ❑Multi-family ❑Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 12850 SW Grant Ave New dwelling area: quare feet City/State/ZIP: Tigard/OR/97223 Garage/carport area: sq feet Suite/bldg./apt.#: Project name: Broadway Rose Theatre Addition Covered porch area: square Cross street/directions to job site: Hwy 99W/SW Pacific Hwy to SW Walnut St to SW Grant Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot 4: 8700 Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: WCTM 2S102CB00100 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ 1. • I j1v0o,6.-- Installation of engineered aggregate pier system(geopier). ��� Existing building area: 10,981 square feet New building area: 4,164 square feet 8 D PROPERTY OWNER •TENANT Number of stones: 1 Name: Broadway Rose Theatre Attn:Sharon Maroney+Dan Murphy Type of construction: VA Address: 12850 SW Grant Ave Occupancy groups: City/State/ZIP: Tigard/OR/97223 Existing: A-1,B,E Phone:( 503)603.9862 Fax:( 503 )670.8512 New: A-1,F-1, B IN APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee sekedelr) Business name: B&G Builders Attn:Greg Capen Structural plan review fee(or deposit): Contact name: Greg Capen FLS plan review fee(if applicable): Address: 4213 NE Alberta Street Total fees due upon application: City/State/ZIP: Portland/OR/97218 Amount received: Phone:( 503)839.4030 Fax::( 1 - PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: greg@bngbuilders.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: Geotech Foundation Co Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 214 SE Walnut Street Solar Installation Specialty Code checklist. Permit fee(includes plan review City/State/ZIP: Hillsboro,OR 97123 and administrative fees): Phone:(503 )640-1340 Fax:( ) State surcharge(12%of permit fee): CCB Lic.: 146399 it i'3' Total fee due upon application: Authorized signature: Greg Capen This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Print name: lire g Ca Pen Date: 3/18/2020 Service Board. I:1Building`Permits\BUP_COM_PettnitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) a • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ;11,1 Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%bather removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard III 4 COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review — Commercial -With Land Use TIGARD ...mom Building Permit #: _ ___. 01, Site Address: i 2(691) ,c\nl Gr tv + AVe, Suite/Bldg#: Project Name: 122YDG WA -f i Rose I V K-�/ (Name of commercial b siness occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: S-tYUtC*k. l ro,,Q - or dcdiovn 1' nv1 M 7"Verify site address/suite# exists and active in permit system. ` O. River Terrace Neighborhood: ❑ Yes 14 No g Land Use Case#: M k D OV 2-42i XPlans Match Approved Land Use: Bis Site Plan MA-Landscape Plan ❑ Other: -I Trban Forestry Plan 0 Elevation Plan /I :uilding Height: Maximum Height ,,_ . Height ►: Conditions Met 4 Prior to Submittal ❑ nor to Permit Issuance X,Business License: Exists: ' Yes 0 No,applicant was provided a business license application y Public Facilities Improvement(PFI)Permit: Required: Yes,applicant was notified 0 No Applied For: X Yes 0 No,stop intake Notes: Do noi- (Sia..1.e l tnth\ CEYY�-t+\C .e\S Approved by Planning: goLs— Date: 4/i j/2.-4(1) Revisions (after Building Submittal Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: J f/ j Site Plans: # Building Plans: # _ Building Permit#: nter building permit ve. �., ^ ..� Workflow Routing: anning ngineering ermit Coordinator Ld � g Workflow Sign-off: '12.-Sriign-off for Planning(include notes from planning review) Route Application Documents: tilling: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: ' [1fY �t �a rri- Gt/c�yLl �4- �LCc).p / ',,•F ' . By Permit Technician: 7,70/ Date: I:\BuildingWorms\BldgPertnitRvw_COM_WithLandllse_111819.docx Engineering Review ISI Slope at building pad: 3'% v PFI Permit#: Zoi — 00 1-15S Conditions "Met"prior to issuance of building permit !" Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) JRI Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 51 Yes E No Assess Water Quantity Fee in-lieu: % Yes f No tot KG�U(Ko. l LIDA Facility on lot: 7 Yes /❑ No ❑ NOT Approved by Engineering: I Date Notes: n Approved by Engineering: c5redy $ Date: 7-12 - Z,p ye> Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: D Approved ❑ Not Approved Revision 3: 0 Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit ��C❑//J Approved, NOT Released: VIAOv>/„ WI Orval-h&c t-iii�pphxfaS Date: 9131'7p Notes: l Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes A N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A 4 OK to Issue Permit i.,l D Pr Approved by Permit Coordinator: A-- Date: 4i wl2,02 I:\Building Toms\B1dgPennitRvw_COM_WithlandUse 1118I9.docx