Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2020-00199 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 4/19/2021 Parcel: 2S113AC01201 Jurisdiction: Tigard Site address: 7331 SW BRIDGEPORT RD 102 Project: Bunk Beer Hall Subdivision: COUNCIL VIEW ACRES(LOTS 1-20) Lot: 18 Project Description: IT for new restaurant in previous restaurant space, includes demo of interior walls,new walls,casework, kitchen equipment and finishes Contractor: OWEN GABBERT LLC Owner: BV CENTERCAL LLC 3811 N BORTHWICK AVE ATTN: FRED BRUNING PORTLAND, OR 97227 7455 SW BRIDGEPORT RD TIGARD, OR 97224 PHONE: 503-701-1407 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: B Permit Fee-Additions,Alterations, 04/15/2021 $3,093.11 anc Grp: Demolition Occupancy Y A-2 Occupancy Load: 264 12%State Surcharge-Building 04/15/2021 $371.17 Dwelling Units: 0 Plan Review 09/09/2020 $2,010.52 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 04/15/2021 $406.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 04/15/2021 $1,237.24 Value: $429,000 Info Process/Archiving-Lg$2.00(over 04/15/2021 $34.00 11x17) Metro CET 04/15/2021 $514.80 Floor Areas: Tigard CET-Non-Residential-Admin 04/15/2021 $171.60 Total Area: 0 Tigard CET-Non-Residential-AH 04/15/2021 $4,118.40 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $11,956.84 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR, Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 throughh OAR 952-001-0090.-0 You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: ! Permittee Signature: .-Ca II 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial H E E I VE D FOR OFFICE USE ONLY City of Tigard Received v/.72 2O2O Permit No. 0202 /? Da[e/B 4 13125 SW Hall Blvd.,Tigard,OR 97223 S E P 0 5 2020 Plan Review itJ Phone: 503-718-2439 Fax: 503-598-1960III Date/By: J•"dy — ad '-/'1 Related Permit: TI t;A RI) Inspection Line: 503-639-4175 CITY OF i IUf1RD Date Ready/By: J 1a ® See Puge 2 for Internet: www.tigard-or.gov VotifietL'Melhod/�f�/-j/'�j ,��, I Supplemental Information BUILDING DIVISION .4/L TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all El Addition/alteralion'rcplacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ I-and 2-family dwelling 14 Commercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFPRMATION AND LOCATION Total number of floors: Job site address: 7331 SW Bridgeport Rd New dwelling area: square feet City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet Suite/bldg./apt.#: I Uij Project name:Bunk Beer Hall T.I. Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Located in Northwest Corner Of Bridgeport Village, West of the Other structure area: square feet Cinema. Access is off internal Bridgeport Village Street REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Council View Acres Lot#: 18 Permit fees*are based on the value of the work performed. Tax map/parcel#: 2S 113ACO1201 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. TI for new Restaurant in previous restaurant space. Valuation: $ 429,000 includes demo of interior walls, new walls, casework, Existing building area: 4,189 square feet kitchen equipment and finishes New building area: 0 square feet El PROPERTY OWNER 0 TENANT Number of stories: 1 Story Name: BV Centercal LLC ATTN: Karl Hunter Type of construction: IIB Address: 7455 SW Bridgeport Rd Occupancy p y groups: City/State/ZIP:Tigard, OR 97224 Existing: A-2 Phone:( 801)647-1357 Fax:( ) New: A-2 (No Change) ,APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: Works Progress Architecture LLP es6ese'm fee schedule) Structural plan review fee(or deposit): ,z,2)0/C , 5 Contact name: Jessamyn Griffin Address: 811 SE Stark, Suite 210 FLS plan review fee(if applicable): City/State/ZIP: Portland, OR 97214 Total fees due upon application: Phone;( 503)234-2945 Fax::( ) Amount received: E-mail: jessamyn@worksarchitecture.net PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: Owen Gabbert, LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 3818 N Vancouver Ave Solar Installation Specialty Code checklist. City/State/ZIP: Portland, OR 97227 Permit fee(includes plan review $I80.00 and administrative fees): Phone:( 503)908-3233 Fax:(503)427-9551 State surcharge(12%of permit fee): $21.60 CCB Lie.: #199369 A Total fee due upon application: $201.60 Authorized signature: // • Thiswipermit days expires if a permitcepeis noto p et e. 'f^ within ISO days after it has been accepted as complete. Print name: Je samyn Griffin Date:9/01/2020 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permitsd3UP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) RECEIVED SEP 03 2020 ,� IGARD City of Tigard • COMMUNITY DEVELOPMENT DEPART D1ViSiON ° Accessibility: Barrier Removal Improvement Plan Mil Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • w_ww.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 252,500 MULTIPLIER(25%barrier removal requitement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 63,125 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ N/A* (b) An accessible entrance: $ N/A* (c) An accessible route to the altered area: $ N/A* (d) At least one accessible restroom for cach sex or a single unisex restroom: $ N/A* (e) Accessible telephones: s N/A* (f) Accessible drinking fountains:and, $ N/A* (g) When possible,additional accessible elements such as storage and alarms: $ N/A* TOTAL(shall equal line [2] of Valuation Computation): $ N/A* *EXISTING FACILITY IS BARRIER FREE (a)ADA ACCESSIBLE PARKING PROVIDED AS PART OF LARGER BRIDGEPORT VILLAGE (b) EXISTING ENTRANCE IS ACCESSIBLE (c) EXISTING ROUTE TO AREA OF WORK IS ACCESSIBLE (d) EXISTING BATHROOMS EQUIPPED WITH COMPLIANT GRAB BARS, INCLUDING VERTICAL (e)TELEPHONES ARE NON-APPLICABLE (f)ACCESSIBLE DRINKING FOUNTAINS ARE NON-APPLICABLE (g) EXISTING BARTOP INCLUDES ADA ACCESSIBLE CASH WRAP SECTION @ 34"AFF -ALL NEW WORK TO BE FULLY COMPLIANT, REMOVAL NOT REQUIRED I:\Building\Permits\BUPCOM_PcrmitApp.doc Rev.03/05/2019 City of Tigard 11111 C e COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: .Bl/P2o2o-ec/ `l' ' Site Address: 133\ I Brlcl e_volt- Rd Suite/Bldg#: 1DZ Project Name: 4hk- ( RA I I (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: T, 1 . Existing Business Activity: aytwip 1 t Vi n f -i(gyp` Proposed Business Activity: k JJ ›irVerify site address/suite# exists and active in permit system. I River Terrace Neighborhood: ❑ Yes ,e�No Zoning: MUC- }Permitted Use: A.Yes ❑ No ❑ Spec Space eit Confirm no land use required. XT ]-Business License: Exists: 'Yes 0 No,applicant was provided a business license application Notes: Approved by Planning: Aldlt Date: ":713I7 Q Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 41 -0/-2020 Site Plans: # 5 Building Plans: # \3 Building Permit#: R-Enter building permit#above. Workflow Routing: Et-Planning ❑ Permit Coordinator 2-Building Workflow Sign-off: [r]'Sign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: C2fig9—,2O2-O I:\Building\Forms\BldgPermitRvw_CO M_NolandUse_11 1819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: 1N Date: Notes: ' Revisions (after Building Submittal only) Revision Notice 1: Date Sent to App ' t: Revision Notice 2: Date Sent t plicant: Revision Notice 3: Date to Applicant: ❑ SDC Fees Entered: ash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:Building\Forms\BIdgPennitRvw_COM_NoLandUse_111819.docx