Loading...
Correspondence 13)7202I- 000q-i V00 SIN AtiolinitA S�- Branden Taggart From: #Building Permit Technicians Sent: Thursday, April 22, 2021 3:51 PM To: Helen Drokin Cc: Holly Van De Wege;Tina Escalera; Jeff Lewis;Anastasia Pakhnyuk; Dianna Ornelas; Tom Hochstatter Subject: RE: 6900 SW ATLANTA ST- Oregon Education Association Attachments: TransmittalLetter-Revisions_073120.pdf Hi Helen, I wish I was in Florida. I'm working in the offices here in Tigard. It sounds like you had a great vacation. Regarding your submittal, I would like to reiterate that the plans say, in big bold lettering, "Mechanical System Upgrade." I sent Jeff Lewis (2) emails on March 11 requesting him to contact me for clarification due to the scope of work containing both Mechanical and Building permit work. I never received a direct response back. For the reasons I stated in my previous email below, this is more than just a matter of entering the permit in our system. There was additional mechanical work included in the plans that was not permitted under Mechanical permit MEC2021-00149. This work was not all Building permit work. Since you would like for us to use the plans we received as Building permit plans, please make sure that JH Kelly submits the attached Transmittal Letter and (2) sets of cut sheets with attachment details for the outside air gas heaters under Mechanical permit MEC2021-00149. I have spoken with our Commercial Plans Examiner,Tom Hochstatter,and he is able to expedite his review of the suspended ceiling. We can possibly have this permit ready to issue by the end of the day on Monday. Please note that we will make a notation on the plans that the outside heaters were removed from the Building permit scope of work. We will contact you as soon as this permit is ready to issue. At that time the permit fees can be paid online. I will send you the online payment instructions when this permit is ready to issue. Have a good day. Thank you, Brandon Taggart n City of Tigard Senior Permit Technician Community Development 13125 SW Hail'Blvd Tigard,OR 97223 (503}718-2449 brandent@tigard-or.gov From:#Building Permit Technicians Sent: Wednesday, April 21, 2021 5:34 PM To: Helen Drokin <helen@wcfore.com> Cc: Anastasia Pakhnyuk<anastasia@wcfore.com>; Tom Hochstatter<TomH@tigard-or.gov>; Holly Van De Wege <hollyv@tigard-or.gov>;Jeff Lewis<jeff@wcfore.com>; Tina Escalera <tinae@tigard-or.gov> Subject: RE: 6900 SW ATLANTA ST-Oregon Education Association Hi Helen, 1 According to the plans to the existing Mechanical permit MEC2021-00149 the scope of work is primarily water piping, refrigerant piping, and condensate drain system work. In contrast,the most recent "Mechanical System Upgrade" submittal includes new pads for exterior units, new outside air gas heaters (not shown on the initial submittal), along with suspended ceiling alterations. And,the Mechanical contractors for MEC2021-00149 isJH Kelly,whereas the contractor for the most recent submittal is Cooper Construction. Furthermore,we received a Residential Building Permit Application for your original submittal,which is why we asked you to send in new applications. From our perspective,these are different submittals with separate mechanical work by two different contractors. If you would like for us to use all (3) plan sets for the Building permit,we can do this. However,the outside air gas heaters are not included in the scope of work for MEC2021-00149; therefore, you will need to submit a completed Transmittal Letter--attached above --along with (2) sets cut sheets and attachment details as previously requested. Moreover,JH Kelly would need to install the gas heaters as the rest of the scope of work would fall under the Building permit. Please let us know how you would like to proceed. Thank you, Branden Taggart opt it City of Tigard I s ... Senior Permit Technician Community Development TIGARD 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandent@tigard-or.gav From: Helen Drokin <helen@wcfore.com> Sent:Thursday, April 22, 2021 12:16 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: 6900 SW ATLANTA ST-Oregon Education Association Warnings This message was sent from outside your organization and we are unable to verify the sender. Branden, I understand that you are in Florida. I was just there in March — in and around Clearwater Beach! What a beautiful area. The sun, sand, waves —amazing! That is why I couldn't personally submit on 3/5 and this application was first derailed with the residential building permit application. The confusion only grew from there. Entering this commercial building permit application into the permitting system is taking longer than everyone anticipated. I asked to speak to your supervisor, but I understand that she is out on sick leave. As you can imagine, the contractor's emotions are quite elevated at this point, due to the delay of entering this building permit application into your system. Additionally, considering the mechanical permit was issued on 3/11 and we're still waiting on the building permit to be simply entered into the queue, it is causing untold ripple effects both to our mutual professional reputations, as well as in regards to the scope of work that needs to be done. Other reviewers have indicated they'd be more than willing to expediently review their portion, but they cannot since it hasn't been entered into the permitting system! 2 Branden Taggart From: #Building Permit Technicians Sent: Wednesday, April 21, 2021 5:34 PM To: 'Helen Drokin' Cc: Anastasia Pakhnyuk;Tom Hochstatter; Holly Van De Wege; 'Jeff Lewis';Tina Escalera Subject: RE: 6900 SW ATLANTA ST - Oregon Education Association Attachments: TransmittalLetter-Revisions_073120.pdf Hi Helen, According to the plans to the existing Mechanical permit MEC2021-00149,the scope of work is primarily water piping, refrigerant piping, and condensate drain system work. In contrast,the most recent"Mechanical System Upgrade" submittal includes new pads for exterior units, new outside air gas heaters(not shown on the initial submittal), along with suspended ceiling alterations. And,the Mechanical contractors for MEC2021-00149 is JH Kelly,whereas the contractor for the most recent submittal is Cooper Construction. Furthermore, we received a Residential Building Permit Application for your original submittal,which is why we asked you to send in new applications. From our perspective,these are different submittals with separate mechanical work by two different contractors. If you would like for us to use all (3) plan sets for the Building permit,we can do this. However, the outside air gas heaters are not included in the scope of work for MEC2021-00149; therefore,you will need to submit a completed Transmittal Letter--attached above--along with (2) sets cut sheets and attachment details as previously requested. Moreover,JH Kelly would need to install the gas heaters as the rest of the scope of work would fall under the Building permit. Please let us know how you would like to proceed. Thank you, Branden Taggart a City of Tigard a=f Senior Permit Technician r 1,650r, Community Development 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 bra rident@tigard-or.gov From: Helen Drokin <helen@wcfore.com> Sent:Thursday,April 15, 2021 1:30 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Jeff Lewis<jeff@wcfore.com> Cc: Anastasia Pakhnyuk<anastasia@wcfore.com>;Tom Hochstatter<TomH@tigard-or.gov>; Holly Van De Wege <hollyv@tigard-or.gov> Subject: RE: 6900 SW ATLANTA ST-Oregon Education Association Warning!This message was sent from outside your organization and we are unable to verify the sender. Branden. Thank you for your response on our Building Permit submission. We have already submitted 3 sets to you; please process them for the Building Permit. The building valuation remains $100,000. J. The mechanical permit has already been applied for/approved/and issued - MEC2021-00149 to Portland Mechanical/JH Kelly. They provided the required cut sheets, etc. for the equipment. The permit we submitted to you (originally on a Building Permit Residentia/Application, then per your instructions via a Mechanical Permit Application, then corrected to a Building Permit Commercial Application) is the one that needs to be processed. Essentially, the contractor is cutting 2 holes in the roof for the air intake/exhaust, pulling and replacing T-Bar sections of the ceiling and then adding a concrete pad with a fence around it. I hope that clarifies any confusion regarding our Building Permit submission. Please let us know if there are any other questions you may have. Thank you! Kindest regards, Helevl, Prol2�rti Helen Drokin, Administrator West Coast Forensics, Engineering and Design, LLC 3835 S Kelly Avenue Portland, OR 97239 503.516.3985 Cell helenc wcfore.com From: #Building Permit Technicians [mailto:TigardBuildingPermitsCaltigard-or.gov] Sent: Thursday, April 15, 2021 11:28 AM To: Jeff Lewis Cc: Helen Drokin; Anastasia Pakhnyuk; Tom Hochstatter; Holly Van De Wege Subject: RE: 6900 SW ATLANTA ST- Oregon Education Association Hi Jeff, After reviewing your submittal, we will need the following to complete plan review for the Mechanical and Building permits: Mechanical permit: • Cut sheets for the fan coil units and outside air gas heaters. The weight of each unit will need to be included for the existing units as well as the new units. • Attachment details showing the number and type of fasteners for the outside air gas heaters. • Please revise the valuation so that the suspended ceiling scope of work is not included. Building permit: • We have a total of(3) sets of mechanical plans currently. (2) sets of plans are required for Mechanical permits, and we will use the (1)extra set of plans for the Building permit. Our Commercial Plans Examiner requested (2) additional sets of the mechanical plans to review the suspended ceiling scope of work. The mechanical pages will be stamped reference only. • Please revise the valuation so that the mechanical scope of work is not included. Please let me know if you have questions. Thank you, 2 Brendan Taggart 1114 it City of Tigard Senior Permit Technician Community Development /WARD 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent@tigard-or.gov From:Jeff Lewis<jeff@wcfore.com> Sent:Thursday,April 1, 2021 8:55 AM To: #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Cc: Helen Drokin<helen@wcfore.com> Subject: RE: 6900 SW ATLANTA ST There are no calculations.All equipment being installed weighs less than the equipment it is replacing.All ceiling finishes are going back like for like with no changes. Suspended ceiling attachment is being upgraded to current code requirements. Regards, Jeffery C. Lewis, PE,SE Structural Engineer and Principal West Coast Forensics, Engineering and Design, LLC email to:jeff@wcfore.com cell: 503-756-1689 www.wcfore.com From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent: Wednesday, March 31, 2021 5:17 PM To:Jeff Lewis<ieff@wcfore.com> Cc: Helen Drokin<helen@wcfore.com> Subject: 6900 SW ATLANTA ST Hello Jeff, Thank you for your application submittal. The application submitted has NOT met the requirements needed to move to the next step of intake review, for the following reasons: • Missing (2) additional sets of plans. • Please provide (2) sets of structural calculations if applicable. If you have any questions,please email the Building Division at TigardBuildingPermitsna,,tigard-or.gov or call at 503- 718-2439. Thank you, 3 Tina Escalera Permit Tech Assistant City of Tigard I Community Development 13125 SW Hall Blvd.Tigard, OR 97223 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 4 Branden Taggart From: #Building Permit Technicians Sent: Thursday, April 15, 2021 11:28 AM To: Jeff Lewis Cc: Helen Drokin; anastasia@wcfore.com;Tom Hochstatter, Holly Van De Wege Subject: RE: 6900 SW ATLANTA ST - Oregon Education Association Hi Jeff, After reviewing your submittal, we will need the following to complete plan review for the Mechanical and Building permits: Mechanical permit: • Cut sheets for the fan coil units and outside air gas heaters. The weight of each unit will need to be included for the existing units as well as the new units. • Attachment details showing the number and type of fasteners for the outside air gas heaters. • Please revise the valuation so that the suspended ceiling scope of work is not included. Building permit: • We have a total of(3) sets of mechanical plans currently. (2)sets of plans are required for Mechanical permits, and we will use the (1) extra set of plans for the Building permit. Our Commercial Plans Examiner requested (2) additional sets of the mechanical plans to review the suspended ceiling scope of work. The mechanical pages will be stamped reference only. • Please revise the valuation so that the mechanical scope of work is not included. Please let me know if you have questions. Thank you, Branden Taggart IIIa City of Tigard b.M1. Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent@tigard-or.gov From:Jeff Lewis<jeff@wcfore.com> Sent:Thursday, April 1, 2021 8:55 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Cc: Helen Drokin<helen@wcfore.com> Subject: RE: 6900 SW ATLANTA ST Warning! This message was sent from outside your organization and we are unable to verify the sender. 1 ..Thefie are no calculations.All equipment being installed weighs less than the equipment it is replacing. All ceiling finishes are going back like for like with no changes. Suspended ceiling attachment is being upgraded to current code requirements. Regards, Jeffery C. Lewis, PE, SE Structural Engineer and Principal West Coast Forensics, Engineering and Design, LLC email to: leff@wcfore.com cell: 503-756-1689 www.wcfore.com From:#Building Permit Technicians<TigardBuildingPermitsPtigard-or.gov> Sent:Wednesday, March 31, 2021 5:17 PM To:Jeff Lewis<jeff@wcfore.com> Cc: Helen Drokin<helen@wcfore.com> Subject: 6900 SW ATLANTA ST Hello Jeff, Thank you for your application submittal. The application submitted has NOT met the requirements needed to move to the next step of intake review, for the following reasons: • Missing (2) additional sets of plans. • Please provide (2) sets of structural calculations if applicable. If you have any questions,please email the Building Division at TigardBuiidingPermitsatigard-or.gov or call at 503- 718-2439. Thank you, Tina Escalera Permit Tech Assistant City of Tigard 1 Community Development 13125 SW Hall Blvd. Tigard, OR 97223 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 2 Branden Taggart From: Jeff Lewis <jeff@wcfore.com> Sent: Thursday, April 1, 2021 8:55 AM To: #Building Permit Technicians Cc: Helen Drokin Subject: RE: 6900 SW ATLANTA ST Categories: Tina Warning!This message was sent from outside your organization and we are unable to verify the sender. There are no calculations.All equipment being installed weighs less than the equipment it is replacing. All ceiling finishes are going back like for like with no changes. Suspended ceiling attachment is being upgraded to current code requirements. Regards, Jeffery C. Lewis, PE,SE Structural Engineer and Principal West Coast Forensics, Engineering and Design, LLC email to:jeff@wcfore.com cell: 503-756-1689 www.wcfore.com From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent:Wednesday, March 31, 2021 5:17 PM To:Jeff Lewis<jeff@wcfore.com> Cc: Helen Drokin<helen@wcfore.com> Subject: 6900 SW ATLANTA ST Hello Jeff, Thank you for your application submittal. The application submitted has NOT met the requirements needed to move to the next step of intake review, for the following reasons: • Missing (2) additional sets of plans. • Please provide (2) sets of structural calculations if applicable. If you have any questions, please email the Building Division at TigardBuildingPermits@tigard-or.gov or call at 503- 718-2439. Thank you, 1 Tina Escalera •Permit Tech Assistant City of Tigard I Community Development 13125 SW Hall Blvd.Tigard, OR 97223 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 2