Loading...
Permit CITY OF TIGARD BUILDING PERMIT 111 1 COMMUNITY DEVELOPMENT Permit#: BUP2021-00083 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/3/2D21 T f t:A,li t-3 9 Parcel: 2S101 BB01500 Jurisdiction: Tigard Site address: 12244 SW GARDEN PL Project: Mannahouse Church Subdivision: CROW PARK 217 Lot: 3 Project Description: Alteration to existing interior partition walls.New platform 8 AV booth Contractor: EMANUEL CONSTRUCTION LLC Owner: BKM PARK BC 252 LLC BY SLK GLOBAL SOLUTIONS AMERICA 2727 LBJ FREEWAY STE 806 DALLAS,TX 75234 PHONE: PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 04/27/2021 $377.90 Demolition Occupancy Grp: A-2 Occupancy Load: 12%State Surcharge-Building 04/27/2021 $45.35 Dwelling Units: 0 Plan Review 04/15/2021 $245.64 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 04/27/2021 $103.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 04/27/2021 $151.16 Value: $201000 Info Process/Archiving-Lg$2.00(over 04/27/2021 $10.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $933.05 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090, You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: vouy vA.vU'DP We..ve Permittee Signature: Owl lic,�.tLo-vt pp Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. I Building Permit Application $- A I 2.1 Commercial RECEIVE I Received FOR OFFICE USE ONLY (� - City of Tigard Date/By: Pq 3 f�� Permit No.: �'20LI-QQU b 't 13125 SW Hall Blvd.,Tigard,OR 97223 APR 1. 2 ?DV Plan Revie`�.1 'if1 Phone: 503-718-2439 Fax: 503-598-1960 Date/By: J -* ' aI Related Permit: TIGARD Inspection Line: 503-639-4175 CITY OF TIGARD Date Ready/By: // ! h r`• ® See Page 2 for e Internet: www.tigard-or.gov • e fied/Method: ( /, l Supplemental Information r7 TYPE OF WORK 111 r11\1G f!Sl h` - "VLi/i. REQUI :c ts'.c 1-AND 2-FAMILY DWELLING ❑Ncw construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all J1 Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ 1-and 2-family dwelling NiCommercial/industrial D Accessory building El Multi-family Number of bedrooms: ❑Master builder ❑ Other: Number of bathrooms: ' 4 r ,3 a JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 1 a a 1. G h iU G2 New dwelling area: square feet City/State/ZIP: 1/jar v `JI c3 C ,as 3 Garage/carport area: square feet Suite/bldg./apt.#: Project name: jes� .-� P4,,,,7� Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: r Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. A4;tra (l to eiX tSt- 1 1:yyLl' --1 ,pa L1'QYA Valuation: $ 0.0007 \JAk1S, Mt,6 ,p-1�oC'M, MO - \T b•-tr s Existing building area: square feet New building area: square feet K PROPERTY OWNER ❑ TENANT Number of stories: ) Name:( u (1()(14 (S cZ OA(.nt h Type of construction: V—15 Address: /1 as LiLA � 8 � a.S k) 6 GeycLy) `ace Occupancy groups: City/State/ZIP: "S'\i GtS0"l � Existing: ./ Aga Phone:( ) Fax:( ) New: V APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: �\ ,,�' t (,[,V� 64 Structural plan review fee(or deposit): 26. Contact name: Fl1 FLS plan review fee(if applicable): Address:-4 e c-A y \\eyoi `E- Total fees due upon application: City/State/ZIP: ) Fax:: nr'd r� QV(_ Ck aQ� Phone: z )a 3 Li as ( ) Amount received: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* ' E-mail: 0,0,...7, 6 0,R a A wn .0 rE'j . `J Commercial and residential prescriptive installation of p,e 'l' CONTRACTOR roof-top mounted Photovoltaic Solar Panel System. Business name: ice ;\J •f nA1,l\.)e\ CO'')S ,,L\'1 on Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: Solar Installation Specially Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.:' SQ U / Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Air )� Ill Date: ��J / * Fee methodology set by Tr-County Building Industry (J� J V-" /Jaffa Service Board. I:\Building\Petmits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard IIICOMMUNITY DEVELOPMENT DEPARTMENT C T 1 G A R D Building Permit Review — Commercial - No Land Use Building Permit #: I UPZOZJ-d()(7 g3 Site Address: 12244 SW Garden PI Suite/Bldg#: Project Name: Mannahouse Church (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: T.I existing tenant Existing Business Activity: Religious Institution Proposed Business Activity: Religious Institution -rify site address/suite# exists and active in permitstem. \ '6h' .ver Terrace Neighborhood: ❑ Yes I_I No ell Zoning: C-G ❑r Permitted Use: U Yes U No U Spec Space QC.nfirm no land use required. 1)1 :usiness License: Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: Approved by Planning: ` ---- — • Date: 4/12/21 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: .// -2oZ/ Site Plans: # 3 Building Plans: #�,7� 3 [ Building Permit#: Enter buildingermit# above. Workflow Routing: ErPlanning . Permit Coordinator Building Workflow Sign-off: Sign pff for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: ,P4--1 ,/2L12I 1:1Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applican Revision Notice 2: Date Sent to Applic, t: Revision Notice 3: Date Sent to App:cant: ❑ SDC Fees Entered: Wash Co Tra, Dev Tax: ❑ Yes ❑ N/A Tigard Tra s SDC: ❑ Yes ❑ N/A Parks S P : ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordi <tor: Date: I:\Building\Forms\BldgPermitRvw_COM_NoLan dU se_1 11819.docx RECEIVE . City of Tigard • COMMUNITY DEVELOPMENT DEPARTMEN 1,1 Accessibility: Barrier Removal Improvement P ,i ° OF 1I:G:vs Commercial & Multi-Family - Additions or Alteration��ILDING DIVI ;�r TIGARD $ 13 2Hall Blvd. 1 5 SW Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov ov g g S REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: Ill $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ gl ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the • following order: (a) Parking $ Q X�-6pGJ (b) An accessible entrance: $ 64aS{,!ny (c) An accessible route to the altered area: $ L�Xlif�J (d) At least one accessible restroom for each sex or a single unisex x ])%.1 restroom: $ (e) Accessible telephones: $ Y61 UQ (f) Accessible drinking fountains:and, $ 417 J (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Boilding\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019