Permit CITY OF TIGARD BUILDING PERMIT
111 1 COMMUNITY DEVELOPMENT Permit#: BUP2021-00083
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/3/2D21
T f t:A,li t-3 9 Parcel: 2S101 BB01500
Jurisdiction: Tigard
Site address: 12244 SW GARDEN PL
Project: Mannahouse Church Subdivision: CROW PARK 217 Lot: 3
Project Description: Alteration to existing interior partition walls.New platform 8 AV booth
Contractor: EMANUEL CONSTRUCTION LLC Owner: BKM PARK BC 252 LLC
BY SLK GLOBAL SOLUTIONS AMERICA
2727 LBJ FREEWAY STE 806
DALLAS,TX 75234
PHONE: PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 04/27/2021 $377.90
Demolition
Occupancy Grp: A-2 Occupancy Load: 12%State Surcharge-Building 04/27/2021 $45.35
Dwelling Units: 0 Plan Review 04/15/2021 $245.64
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 04/27/2021 $103.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 04/27/2021 $151.16
Value: $201000 Info Process/Archiving-Lg$2.00(over 04/27/2021 $10.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $933.05
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090, You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: vouy vA.vU'DP We..ve Permittee Signature: Owl lic,�.tLo-vt
pp
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
I
Building Permit Application $- A I 2.1
Commercial RECEIVE I Received FOR OFFICE USE ONLY (�
- City of Tigard Date/By: Pq 3 f�� Permit No.: �'20LI-QQU b
't 13125 SW Hall Blvd.,Tigard,OR 97223 APR 1. 2 ?DV Plan Revie`�.1 'if1 Phone: 503-718-2439 Fax: 503-598-1960 Date/By: J -* ' aI Related Permit:
TIGARD Inspection Line: 503-639-4175 CITY OF TIGARD Date Ready/By: // ! h r`• ® See Page 2 for
e Internet: www.tigard-or.gov • e fied/Method: ( /, l Supplemental Information
r7
TYPE OF WORK 111 r11\1G f!Sl h` - "VLi/i.
REQUI :c ts'.c 1-AND 2-FAMILY DWELLING
❑Ncw construction ❑ Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
J1 Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
❑ 1-and 2-family dwelling NiCommercial/industrial
D Accessory building El Multi-family Number of bedrooms:
❑Master builder ❑ Other: Number of bathrooms:
' 4
r ,3 a JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 1 a a 1. G h iU G2 New dwelling area: square feet
City/State/ZIP: 1/jar v `JI c3 C ,as 3 Garage/carport area: square feet
Suite/bldg./apt.#: Project name: jes� .-� P4,,,,7� Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: r Lot#: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
A4;tra (l to eiX tSt- 1 1:yyLl' --1 ,pa L1'QYA Valuation: $ 0.0007
\JAk1S, Mt,6 ,p-1�oC'M, MO - \T b•-tr s Existing building area: square feet
New building area: square feet
K PROPERTY OWNER ❑ TENANT Number of stories: )
Name:( u (1()(14 (S cZ OA(.nt h Type of construction: V—15
Address: /1 as LiLA � 8 � a.S k) 6 GeycLy) `ace Occupancy groups:
City/State/ZIP: "S'\i GtS0"l � Existing: ./ Aga
Phone:( ) Fax:( ) New:
V APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name: �\ ,,�'
t (,[,V� 64
Structural plan review fee(or deposit): 26.
Contact name:
Fl1 FLS plan review fee(if applicable):
Address:-4 e c-A y \\eyoi `E- Total fees due upon application:
City/State/ZIP: ) Fax::
nr'd r� QV(_ Ck aQ�
Phone: z )a 3 Li as ( ) Amount received:
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* '
E-mail: 0,0,...7, 6 0,R a A wn .0 rE'j .
`J Commercial and residential prescriptive installation of
p,e 'l' CONTRACTOR roof-top mounted Photovoltaic Solar Panel System.
Business name: ice ;\J •f nA1,l\.)e\ CO'')S ,,L\'1 on Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: Solar Installation Specially Code checklist.
City/State/ZIP: Permit fee(includes plan review $180.00
and administrative fees):
Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lie.:' SQ U / Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Air )� Ill Date: ��J / * Fee methodology set by Tr-County Building Industry
(J� J V-" /Jaffa Service Board.
I:\Building\Petmits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard
IIICOMMUNITY DEVELOPMENT DEPARTMENT
C
T 1 G A R D Building Permit Review — Commercial - No Land Use
Building Permit #: I UPZOZJ-d()(7 g3
Site Address: 12244 SW Garden PI Suite/Bldg#:
Project Name: Mannahouse Church
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: T.I existing tenant
Existing Business Activity: Religious Institution
Proposed Business Activity: Religious Institution
-rify site address/suite# exists and active in permitstem.
\ '6h' .ver Terrace Neighborhood: ❑ Yes I_I No
ell Zoning: C-G
❑r Permitted Use: U Yes U No U Spec Space
QC.nfirm no land use required.
1)1 :usiness License:
Exists: ❑ Yes ❑ No, applicant was provided a business license application
Notes:
Approved by Planning: ` ---- — • Date: 4/12/21
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: .// -2oZ/
Site Plans: # 3
Building Plans: #�,7� 3
[
Building Permit#: Enter buildingermit# above.
Workflow Routing: ErPlanning . Permit Coordinator Building
Workflow Sign-off: Sign pff for Planning(include notes from planning review)
Route Application Documents: Building: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: ,P4--1 ,/2L12I
1:1Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved, NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applican
Revision Notice 2: Date Sent to Applic, t:
Revision Notice 3: Date Sent to App:cant:
❑ SDC Fees Entered: Wash Co Tra, Dev Tax: ❑ Yes ❑ N/A
Tigard Tra s SDC: ❑ Yes ❑ N/A
Parks S P : ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coordi <tor: Date:
I:\Building\Forms\BldgPermitRvw_COM_NoLan dU se_1 11819.docx
RECEIVE .
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMEN
1,1 Accessibility: Barrier Removal Improvement P ,i
° OF 1I:G:vs
Commercial & Multi-Family - Additions or Alteration��ILDING DIVI ;�r
TIGARD $
13 2Hall Blvd.
1 5 SW Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
ov
g g S
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: Ill $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ gl
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
• following order:
(a) Parking $ Q X�-6pGJ
(b) An accessible entrance: $ 64aS{,!ny
(c) An accessible route to the altered area: $ L�Xlif�J
(d) At least one accessible restroom for each sex or a single unisex
x ])%.1
restroom: $
(e) Accessible telephones: $ Y61 UQ
(f) Accessible drinking fountains:and, $ 417 J
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Boilding\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019