Permit Building Division
C
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ [bt{-,1-1-06100
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ZJII D1.5O
•
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:ABuilding\Permits\BUP-COM PermitApp.doc 03/03/2011
3110/21
City of Tigard
• 111 COMMUNITY DEVELOPMENT DEPARTMENT
e
T I G A R D Building Permit Review — Commercial - No Land U s e
Building Permit #: ?LtP202/ -o007/
Site Address: 10220 SW Greenburg Rd Suite/Bldg#:
Project Name: Lincoln Center
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: Improvements to existing restrooms; all interior work
Existing Business Activity: N/A
Proposed Business Activity: N/A
ElVerify site address/suite# exists and active in permit system.
ElRiver Terrace Neighborhood: ❑ Yes L"1 No
IS ,ring: MUE-1
i'V' ermitted Use: U Yes U No U Spec Space
lia Co firm no land use required.
ie Business License:
Exists: ❑ Yes ❑ No, applicant was provided a business license application
Notes:
Approved by Planning: _ .— Jss Date: 3/17/21
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: Dal C/zaL(
Site Plans: # 3
Building Plans: #n�3
Building Permit#: L✓�Enter building.zermit# above. n�
Workflow Routing: Planning IJ Permit Coordinator LET building
Workflow Sign-off: '�Sign-off for Planning(include notes from planning review)
Route Application Documents: LET building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
X. / Date:
By
Permit Technician: / 3 Z Q
i/711J6 � ��z4
I:\Building\Forms\Bl dgPermitRvw_COM_NoLandU se_11 1819.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved, NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applica. :
Revision Notice 3: Date Sent to App • ant:
❑ SDC Fees Entered: Wash Co Tr, -s Dev Tax: ❑ Yes ❑ N/A
Tigard Tr, s SDC: ❑ Yes ❑ N/A
Parks I C: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coor.inator: Date:
I:\Building\Form s1B IdgPermitRvw_COM_NoLandUse_l 11819.docx