Loading...
Permit Building Division C Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ [bt{-,1-1-06100 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ZJII D1.5O • ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:ABuilding\Permits\BUP-COM PermitApp.doc 03/03/2011 3110/21 City of Tigard • 111 COMMUNITY DEVELOPMENT DEPARTMENT e T I G A R D Building Permit Review — Commercial - No Land U s e Building Permit #: ?LtP202/ -o007/ Site Address: 10220 SW Greenburg Rd Suite/Bldg#: Project Name: Lincoln Center (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Improvements to existing restrooms; all interior work Existing Business Activity: N/A Proposed Business Activity: N/A ElVerify site address/suite# exists and active in permit system. ElRiver Terrace Neighborhood: ❑ Yes L"1 No IS ,ring: MUE-1 i'V' ermitted Use: U Yes U No U Spec Space lia Co firm no land use required. ie Business License: Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: Approved by Planning: _ .— Jss Date: 3/17/21 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Dal C/zaL( Site Plans: # 3 Building Plans: #n�3 Building Permit#: L✓�Enter building.zermit# above. n� Workflow Routing: Planning IJ Permit Coordinator LET building Workflow Sign-off: '�Sign-off for Planning(include notes from planning review) Route Application Documents: LET building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: X. / Date: By Permit Technician: / 3 Z Q i/711J6 � ��z4 I:\Building\Forms\Bl dgPermitRvw_COM_NoLandU se_11 1819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applica. : Revision Notice 3: Date Sent to App • ant: ❑ SDC Fees Entered: Wash Co Tr, -s Dev Tax: ❑ Yes ❑ N/A Tigard Tr, s SDC: ❑ Yes ❑ N/A Parks I C: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coor.inator: Date: I:\Building\Form s1B IdgPermitRvw_COM_NoLandUse_l 11819.docx