Loading...
MST2021-00056 (2) CITY OF TIGARD MASTER PERMIT III • ' COMMUNITY DEVELOPMENT Permit#: MST2021-00005 ? Date Issued: 01/27/2021 T I(1 A I?,I-+ 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S109AD14400 5 12) \ Jurisdiction: Tigard Site address: 12943 SW TAKENA CT Subdivision: ARBOR SUMMIT NO.2 Lot: 40 Project: Bowen Lui Project Description: Rooftop solar PV BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 si Value: $3,978.70 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain 0 Storm Sewer: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Other Fixtures: 0 Drywell-Trench Drain: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Fum<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add'I 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System. N Garage Opener: N All Other: Y Other Description: Roof Top Solar PV System 4.41 kW Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: OTN SF VB R-3 0 Owner: Contractor: LIU,BOWEN BRS FIELD OPS LLC Required Items and Reports(Conditions) HU,XIAOXIA 1403 NORTH RESEARCH WAY 12943 SW TAKENA CT OREM,UT 84097 TIGARD,OR 97224 PHONE: PHONE: 855-205-2530 FAX: Total Fees: $367.88 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR`95'22-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987, ora 1.800.332.2344.tL Issued By: ` !$ i ctnoc�0 t"JJ Permittee Signature: ©� �'.t�p l(�1.KurN, Call 503. 39.4175 by 7:00 a.m.for the next available inspection date. \ 1 This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT "III Transmittal Letter T i t,A li r) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Tia Derbidge MAR 2 3 ZOZI COMPANY: BRS Field Ops, LLC CITY OF TIGARD PHONE: 385482-0045 3UILDING DI1'IWN RE: 12943 SW Takena Ct, Tigard, Oregon, 97224 MST2021-00005 (Site Address) (Permit Number) Bowen Liu (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. 0 Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: Updated plans to show the new layout. Updated plans to show a load side breaker for PV interconnection FOJ OF ICE USE ONLY Routed to Per ' ec ician: Date: '2) 2 Initials: Fees Due: Yes V E No Fee Descripti : Amount Due: 1I2 , �t�,. t f ,& � $ �-ts� Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ Done ?________ Applicant Notified: tom_ Date: L/(/ l;*1° Initials: 1:\BuildingWorms\Transmittall-etter-Revis(ioons.doc 05/25/2012 Date: 3/18/2021 RECEIVED Project Name: Bowen Liu MAR 2 3 2021 Address: 12943 SW Takena Ct,Tigard, OR 97224 CITY OF TIGARD 3UILDING DIVISION Updated plans to show the new layout. Updated plans to show a load side breaker for PV interconnection. Please reach out to the team directly if you have any questions. BRS Design design@blueravensolar.com (385)498—4020 The Future of Energy. Today. BLUE RAVEN