Plans IS 2c`0 Zco
.� STONE BRIDGE RECEIVE OBE . 3008
. I3�$(� FEB 0 1 2021
HOMES N W LOT: 12
423o GALEWOOD ST.SUITE too SU1 PO — Ian • TIGARL DATE: 1/19/21
LAKE OSWEGO,OR 97035 IL�S •a ill . DNISIC PROPERTY: FORAN FILLS
(503)387-7577 CITY: TIGARD
STREET CENTERLINE • SCALE: 1„-20r
PLAN No.: 312
ww ELEVATION: STANDARD
PLANTER 1 551 436 `Y
+
SIDEWALK
55b 29.16' - 41` �'►
\fi
�! a£a7ic ete-• Z.
Drive y a ` 3
559 Ioti Z • 4 •` �� . Z
.
EROSION LEGEND B . . e,, � �1 Q,�n < cC
g 1 •�\•ia \��If a FL�TT� .0 /�
0 Direction of drains e G Essxepnc �, 11 1 _
41 V
Building area footprint 5'_0' • 711 I,
PUE
r i Construction Entrance: aggregate 2 / 9 i
® Excavation stock pile CA I
5'6' : C Vi
WSoil coverage practice: straw 3 I; aSanitary sewer location T " 1,E' E' roControl measures: sediment Fence 0 , _. M
l ;1wZs Datly Inspection point /`�' /2�813 SQFT.
) Limits of disturbanceZhBAp
kl / FFE•�7I �1EROSION CONTROL 559 6 •.mNOTE: •
m //ALL WET WEATHER STANDARDS APPLY, INCLUDING: .- COVER ALL STOCKPILES covR'�- ADDITIONAL SEDIMENT CONTROL/ @Keay '�IPREVENTATIVE MEASURES 5'-m' /
- COVER EXPOSED SOILS AFTER i
BACKFILLING (OR 10 DAYS) al�•
TEMP. COVER ALL EXPOSED SOIL I is'REAR syraacK-
�N
• .1 ` T I
/
LEGEND EL I • 0 . 0yy��---
0 �' � / •..,I 'EL. 3'
STREET TREE:
KATSURA spa 11 N s
TRACT ES
LOT COVERAGE: 809e max. BUILDING ZONING; R-1
LOT AREA: 5,391 SQ. FT. MAIN: 1,140 SQ. FT. MAX. HEIGHT: 35'-0'
BUILDING AREA: 2,403 SQ. FT. UPPER: 1,010 SQ. FT. FRONT SETBACK: I5'-0'
PERCENTAGE: 44.5% GARAGE: 453 SQ. FT. GARAGE SETBACK: 20.-0"
COV. PORCH: 90 SQ. FT. REAR SETBACK: 20.-0"
COV. PATIO: 120 SQ. FT. SIDE SETBACK: 5'-0'
STREET SIDE SETBACK: 10'-0'
NOTES:
ALL GRADE AND PROPERTY LINES ARE ESTIMATES OF CURRENT LOCATIONS. LOT •12
ALL DIMENSIONS AND SQUARE FOOTAGE ARE APPROXIMATE FIGURES. $,391 SQ. FT.
ALL RETAINING WALL HEIGHTS AND LOCATIONS ARE ESTIMATES.
THEY MAY VARY AND BE SUBJECT TO CHANGE.