Loading...
Permit FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ . Transmittal Letter Tic;A It n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Branden Taggart DATgEt DEPT: BUILDING DIVISION2021 ��tt tt FROM: Steve Tucker MAR 1 7 COMPANY: Cascade Radon, Inc. CITY Of TIGARD BUILDING DIVISION PHONE: 503-686-9051 By: QT EMAIL: steve@cascaderadon.com t!15? RE: 114&7 SW Hall Blvd., Tigard, OR 97223 MEC2020-00580 (Site Address) (Permit Number) Village at Washington Square, Building B (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: say x � bas 'aiT'X#:1 ,+�^�^ nt -:" li * +kk 4 `a. 2 Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. 2 Other(explain):Revision to show change to exterior radon systems REMARKS' This is in regards to changing the originally permitted radon systems from being Interior routed to being routed up the exterior of the building. 'Mt fTt;7,iP;k s,... SAV:ritiari J t d Elo:�;k at`1`,O OPMEVSV:0:N:tV F."-.- - Yt-,**s *Nza Routed to Permi Technician: Date: 3— Initials: Fees Due: ❑ Yes t"--- Fee Description: Amo t Due: Special Instructions: Reprint Permit(per PE): ❑ Yes No ❑ Done Applicant Notified: Date: �////) J Initials: I:\BuildingU'orms\TransmittalLetter-Revisions_073 120.doc REVISION FFICE COPY APPROVED IFFICE COPY rne G aoa,O - o O $n /8,5 ? 562 RECEIVED MAR 17 7O71 Active Sub-Soil / Sub-Slab Depressurization (ASD) CITY OF TIGARL BUILDING DIVISION General Installation Notes: Al 1. System(s)to be Active Sub-Soil/Sub-Slab Depressurization(ASD). 2. All installations to comply with EPA protocols. 3. Exhaust fan(s)to be located so to be assessable for installation, maintenance,and future replacement, and in a vertical run of vent pipe. 4. More than one system may be needed for the building. 5. Typical fan specs: Continuously running electric, inline duct exhaust fan(s)shall be used. 21W-150W, 60 hz, 115V, 1.5 amps, 60 cycle. 6. Vent piping shall be schedule-40 PVC or ABS,with a minimum 3-inch diameter. 7. Vent termination to be a minimum of 12 inches above the roof line/eave, as well as 2 feet above and/or 10 horizontally from any intake into living space. 8. All vent pipe joints/connections to be sealed and air-tight. 9. Vent pipe shall not have low points, and shall be sloped so as to allow condensate within pipes to flow back to the sub-soil suction point(s). 10. Electrical disconnect for any exhaust fan shall be located within sight of the fan unit. Electrical power supply for any fan unit to be drawn from un-switched building power. 11. Provide proper flashing at all roof penetrations. 12. When reasonably possible, a manometer(air pressure gauge)shall be Installed on or near the negative side of the vent system, and shall be a visible and/or audible mechanism that is simple to read and interpret. 13. All penetrations through concrete slab flooring,or concrete perimeter foundations, whall be sealed as is reasonable. 14. All vent pipes penetrating through fire-rated walls and ceilings shall have a properly rated fire collar and/or equivalent. 15. All system components to be adequately secured: vent pipe every 8 feet vertically(min), and every 4 feet horizontally (min). 16. Systems shall be clearly labeled "Radon Reduction System" or the like. System shall also be labeled as to: a. Dated activated. b. Installers name. c. Information on how to contact installer. . ROOF \�, SCREENED � TERMINUS FLASH IF ROOF �-,,,r- +_; PENETRATION ,., .. li 1) 11 OPTION:AROUND EVE SCHEDULE 40 PIPE. 3"-4"DIA.TYP. INSIDE i; OUTSIDE ;-_,- PIPE STRAP @ 8'-0" • O.C.MAX. - FLEXIBLE COUPLING CONC. EXTERIOR RATEDFAN. SLAB 110 V W/DISCONNECT SCREENED SEAL PENETRATION INTAKE GOAD.FOOTING �/ GRADE _ = IT f=1 I1=1 I I-III-I I �� 111= 11= =11 =1 = 11E 1=111-III7 11= 11=1 1=11 =1 _ I=II-III 1�1-1�1_ SUB-SOIL DEPRESSURIZATION RADON MITIGATION SYSTEM THROUGH-FOOTING SUCTIUON POINT ('SAILOR PIPE") - NTS PL - um" I 0 O I I I I 0 0 20'0" BUILDING A I I . ► I � I I I PARKING I I HALL BLVD BUILD IG C 1 70'6" I 0 0 I I COMM BLDG I 0 I BUILDING B I 0 * I ~ LPL RADON MITIGATION NORTH LEGEND: SITE PLAN 11157 SW HALL BLVD. ♦ 0 INTERIOR ROUTED SC LL: 4-- WO" TIGARD, OR 97223 I RADON VENT SYSTEMS 0 EXTERIOR MOUNTED RADON SYSTEMS Installation and Operation Manual Manuel d'installation et d'operation Rn2EC / Rn4EC kij Inline EC Radon Fan • Ventilateur pour radon en ligne EC pain nu 111 NIA II22It1 A2MIt M TIN Mq MAW Has Roden Frn Fin I pc time PMnr,Fen FH. 1 pc Op,ra wn and note lotion Monate I pc MVO"Cacnngs,2 pcs Oplaauon am]ttstatttsn IMr°d 1 p,: Wu sans LA win teams Pukes OM u MNR eassici VerdAISICur par ra,ri i en tivie R, I it theettoeteitr pour radon on Ivo Rt 1 Pc Manuel diresa.epm.m. I p. Co,ottpes Mel"' 2 tica Memel dreitalk .I pc • %MC BMW REGISTER° THIS PRODUCT TO 0 ° ❑ INCREASE YOUR PRODUCT M } •, WARRANTY BY AN EXTRA YEAR . £ reaistration.fantech.aoo ❑ i"ra- °n USA orw TK►lital/c.t..K$..pon: fantech ' at.S✓tp tech, • = ,et srr iex a is clientele • •: MOW SPAR,Trt eCO 747.1762 Ca_AI Ted WC 56.5 39dtl a systemair con,,r,y /' —'N. -=== -- ----tea I_ • �� " I I 9 8 GBUILDING B WEST ELEVATIONS ®BUILDIING B SOUTH ELEVATION 4 .DI 9 _ .p_ UPPIP 1 ra oz me uA_