Specifications C2021- OOiL4q
VV gOD SW 1 i a
rdlCOMcheck Software Version COMcheckWeb
ii Mechanical Compliance Certificate, C�1\1E0
Project Information CAN o TIGARD
Energy Code: 90.1 (2016) Standard Ru'�D�ND DNIS10�
Project Title: 10129 OEA Remodel BUILDING E
Location: Tigard, Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
Flamed Shahrokhian
6900SW AtlantaStreetMFIA Engineering Consultant
Tigard, Oregon 97223 2007 SE Ash St
Portland, Oregon 97214
(503)234-0548
Mechanical Systems List
QuantitySystem Type & Description
1 HVAC System 2
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity = 326 kBtu/h,
Proposed Efficiency = 3.20 COP, Required Efficiency = 3.20 COP
Cooling Mode: Capacity = 290 kBtu/h,
Proposed Efficiency= 10.60 EER, Required Efficiency: 9.30 EER + 12.5 IEER
Fan System: None
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit,Capacity = 72 kBtu/h, No Economizer, Economizer exception: High Efficiency
Equipment
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 1--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 1 Supply, Constant Volume,2047 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total an
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 3 each -VRF Zone Fan Unit,Capacity=48 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 2--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans: 0.0 total fan
FAN 2 Supply, Constant Volume, 1307 CFM, 0.4 motor nameplate hp, 0.0 fan efficiency grade,
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity = 36 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 3--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans: grade, 0.0 total fan
FAN 3 Supply, Constant Volume, 1130 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency g
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
Report date: 02/11/21
Project Title: 10129 OEA Remodel BUILDING E Page 4 of 26
Data filename:
QuantitySystem Type & Description
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 30 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 4--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 4 Supply, Constant Volume,812 CFM, 0.2 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception:Single fan<= SHP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 8 each-VRF Zone Fan Unit,Capacity= 18 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 5--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 5 Supply,Constant Volume, 600 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency, 0.0 design fan efficiency, fan exception:Single fan <= SHP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System 1
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity=250 kBtu/h,
Proposed Efficiency= 3.20 COP, Required Efficiency = 3.20 COP
Cooling Mode: Capacity= 222 kBtu/h,
Proposed Efficiency= 10.60 EER, Required Efficiency: 10.40 EER + 13.7 IEER
Fan System: None
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 3 each-VRF Zone Fan Unit, Capacity=36 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 6--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 6 Supply, Constant Volume, 1130 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency,0.0 design fan efficiency,fan exception:Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity=48 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 7--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 7 Supply, Constant Volume, 1307 CFM, 0.4 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan<= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 3 each-VRF Zone Fan Unit, Capacity= 72 kBtu/h, No Economizer, Economizer exception: High Efficiency
Equipment
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 8--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 8 Supply,Constant Volume, 2047 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 8 each-VRF Zone Fan Unit,Capacity= 18 kBtu/h
Project Title: 10129 OEA Remodel BUILDING E
Data filename: Report date: 02/11/21
Page 5 of 26
QuantitySystem Type & Description
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 9--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 9 Supply,Constant Volume,600 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency ,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Heating: 1 each-Duct Furnace, Gas,Capacity= 125 kBtu/h
Proposed Efficiency= 80.00%Ec,Required Efficiency: 80.00%Ec
Fan System: FAN SYSTEM 10--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 10 Supply,Constant Volume,2500 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan <=5HP
SYSTEM VERIFICATION REQUIRED.
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans,specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 90.1 (2016)Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
James Tormey-Mechanical Engineer 942.4fuze- /B. . 2/18/2021
Name-Title Signature �� v�f Date
Project Title: 10129 OEA Remodel BUILDING E Report date: 02/11/21
Data filename: Page 6 of 26
COMcheck Software Version COMcheckWeb
IIInspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID,
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
6.4.4.2.1, calculations provide all information DDoes Not
6.7.2 with which compliance can be Location on plans/spec: NA
[PR2]1 determined for the mechanical ❑Not Observable
systems and equipment and ENot Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met.
8.4.1.1, calculations provide all information DDoes Not
8.4.1.2, with which compliance can be
8.7 determined for the electrical systems ENot Observable
[PR6]2 and equipment and document where ❑Not Applicable
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
6.7.2.4 Detailed instructions for HVAC ❑Complies Requirement will be met.
[PRS]1 systems commissioning included on DDoes Not
the plans or specifications for projects Location on plans/spec: SEE SPECS
>=50,000 ft2. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) j 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING E Report date: 02/11/21
Data filename: Page 7 of 26
Section
# Footing / Foundation Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.7 Freeze protection and snow/ice ❑Complies Requirement will be met.
[F09]3 melting system sensors for future DDoes Not
connection to controls. ['Not Observable
❑Not Applicable
Additional Comments/Assumptions:
L 11High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 Low Impact(Tier 3)
Project Title: 10129 0EA Remodel BUILDING E Report date: 02/11/21
Data filename: Page 8 of 26
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
8.4.2 At least 50%of all 125 volt 15-and ❑Complies Requirement will be met.
[EL10]2 20-Amp receptacles are controlled by EDoes Not
an automatic control device. ❑Not Observable
❑Not Applicable
8.4.3 New buildings have electrical energy ❑Complies Exception: Buildings 25,000 ft2.
[EL11]2 use measurement devices installed. ODoes Not
Where tenant spaces exist,each ❑Not Observable
tenant is monitored separately.In ❑Not Applicable
e
buildings with a digital control system pp
the energy use is transmitted to to
control system and displayed
graphically.
10.4.1 Electric motors meet requirements ❑Complies Requirement will be met.
[EL9]2 where applicable. DDoes Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING E Report date: 02/11/21
Data filename: Page 24 of 26
Section
Final inspection Compiles? Comments/Assumptions
& Req.ID
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[FI2]2 controlled by a thermostat control. ODoes Not
O Not Observable
O Not Applicable
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
(F12]2 controlled by a thermostat control. ODoes Not
:Not Observable
ONot Applicable
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[F1212 controlled by a thermostat control. ODoes Not
['Not Observable
Not Applicable
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[F12]2 controlled by a thermostat control. ODoes Not
ONot Observable
ONot Applicable
6.4.3.1.2 Thermostatic controls have a 5'F ❑Complies Requirement will be met.
[F13]3 deadband. ODoes Not
❑Not Observable
O Not Applicable
6.4.3.2 Temperature controls have setpoint ❑Complies Requirement will be met.
[FI2013 overlap restrictions. ODoes Not
❑Not Observable
ONot Applicable
6.4.3.3.1 HVAC systems equipped with at least ❑Complies Requirement will be met.
[F12113 one automatic shutdown control. ODoes Not
:Not Observable
ONot Applicable
6.4.3.3.2 Setback controls allow automatic ❑Complies Requirement will be met.
[F122]3 restart and temporary operation as ODoes Not
required for maintenance.
❑Not Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies Requirement will be met.
[F123]3 ODoes Not
ONot Observable
O Not Applicable
6.4.3.3.4 Zone Isolation devices and controls. ❑Complies Requirement will be met.
[F12313 ODoes Not
❑Not Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies Requirement will be met.
[F123]3 ODoes Not
O Not Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies Requirement will be met.
(F12313 ODoes Not
❑Not Observable
ONot Applicable
6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met.
[F15]3 supplemental electric resistance heat ODoes Not
from coming on when not needed.
ONot Observable
ONot Applicable
1 High Impact(Tier 1)—1-27 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING E Report date: 02/11/21
Data filename: Page 25 of 26
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met.
[F15]3 supplemental electric resistance heat ODoes Not
from coming on when not needed. ONot Observable
ONot Applicable
6.4.3.6 When humidification and DComplies Requirement will be met.
[FI613 dehumidification are provided to a ODoes Not
zone,simultaneous operation is ONot Observable
prohibited. Humidity control prohibits
the use of fossil fuel or electricity to ONot Applicable
produce RH > 30%in the warmest
zone humidified and RH < 60%In the
coldest zone dehumidified.
6.7.2.1 Furnished HVAC as-built drawings ❑Complies Requirement will be met.
(FI7]3 submitted within 90 days of system ❑Does Not
acceptance. ONot Observable
❑Not Applicable
6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met.
[FIB]3 systems within 90 days of system ODoes Not
acceptance. ONot Observable
O Not Applicable
6.7.2.3 An air and/or hydronic system ❑Complies Requirement will be met.
[FI9]' balancing report is provided for HVAC ❑Does Not
systems serving zones >5,000 ft2 of ONot Observable
conditioned area.
ONot Applicable
6.7.2.4 HVAC control systems have been OComplies Requirement will be met.
(FI1011 tested to ensure proper operation, ODoes Not
calibration and adjustment of controls. ONot Observable
❑Not Applicable
10.4.3 Elevators are designed with the ❑Complies Exception: Requirement does not apply.
[F124]2 proper lighting,ventilation power, and ODoes Not
standby mode. ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1JHlgh Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING E Report date: 02/11/21
Data filename: Page 26 of 26
E EN�59999m/{ tl+�
ri
COMcheck Software Version COMcheckWeb BECK
Mechanical Compliance Certificate ';� " 267_
'
irdt
CITE' OF TIGARD
DIVISION
Project Information
Energy Code: 90.1 (2016) Standard
Project Title: 10129 OEA Remodel BUILDING OEA
Location: Tigard, Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
6900 SW Atlanta Street Hamed Shahrokhian
Tigard,Oregon 97223 MFIA Engineering Consultant
2007 SE Ash St
Portland, Oregon 97214
(503) 234-0548
Mechanical Systems List
Quantity System Type & Description
1 HVAC System 1
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity= 352 kBtu/h,
Proposed Efficiency= 3.20 COP, Required Efficiency = 3.20 COP
Cooling Mode: Capacity= 312 kBtu/h,
Proposed Efficiency= 10.00 EER, Required Efficiency: 9.30 EER + 12.5 IEER
Fan System: None
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit, Capacity = 12 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 1--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 1 Supply,Constant Volume, 335 CFM,0.1 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit, Capacity = 15 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 2--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 530 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity= 18 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 3--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 3 Supply, Constant Volume, 600 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 4 of 36
Quantity System Type & Description
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 5 each-VRF Zone Fan Unit,Capacity= 24 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 4—Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 4 Supply, Constant Volume, 580 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 30 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 5--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 5 Supply,Constant Volume, 812 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity= 36 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 6--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 6 Supply,Constant Volume, 1130 CFM,0.3 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 3 each-VRF Zone Fan Unit, Capacity= 72 kBtu/h, No Economizer, Economizer exception: High Efficiency
Equipment
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 7--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 7 Supply, Constant Volume,2047 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System 2
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity= 352 kBtu/h,
Proposed Efficiency= 3.20 COP, Required Efficiency= 3.20 COP
Cooling Mode:Capacity=312 kBtu/h,
Proposed Efficiency= 10.00 EER, Required Efficiency: 9.30 EER + 12.5 IEER
Fan System: None
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit,Capacity= 9 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 8—Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 8 Supply, Constant Volume,318 CFM, 0.1 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity= 12 kBtu/h
No minimum efficiency requirement applies
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 5 of 36
QuantitySystem Type & Description
Fan System: FAN SYSTEM 9--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 9 Supply, Constant Volume,335 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception:Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 15 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 10--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 10 Supply, Constant Volume, 530 CFM,0.2 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan<= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 4 each-VRF Zone Fan Unit, Capacity= 18 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 11--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 11 Supply,Constant Volume, 6000 CFM, 0.2 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= SHP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 6 each-VRF Zone Fan Unit,Capacity= 24 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 12--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 12 Supply,Constant Volume, 580 CFM,0.2 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 3 each-VRF Zone Fan Unit,Capacity= 30 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 13--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 13 Supply, Constant Volume,812 CFM,0.2 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan<= SHP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System 3
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode:Capacity= 352 kBtu/h,
Proposed Efficiency= 3.20 COP, Required Efficiency= 3.20 COP
Cooling Mode: Capacity=312 kBtu/h,
Proposed Efficiency= 10.00 EER, Required Efficiency: 9.30 EER + 12.5 IEER
Fan System: None
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 12 each-VRF Zone Fan Unit, Capacity = 18 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 17--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 17 Supply,Constant Volume,600 CFM,0.2 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan<= SHP
Project Title: 10129 OEA Remodel BUILDING 0EA Report date: 02/11/21
Data filename: Page 6 of 36
QuantitySystem Type & Description
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Heating: 1 each-Duct Furnace, Gas, Capacity= 200 kBtu/h
Proposed Efficiency=80.00%Ec, Required Efficiency: 80.00%Ec
Fan System: FAN SYSTEM 18--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 19 Supply,Constant Volume,4000 CFM, 2.0 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity= 36 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 19--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 19 Supply,Constant Volume, 1130 CFM, 0.3 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception:Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 2 each-VRF Zone Fan Unit, Capacity=48 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 20--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 20 Supply,Constant Volume, 1307 CFM, 0.4 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception:Single fan <= 5HP
SYSTEM VERIFICATION REQUIRED.
1 HVAC System
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 72 kBtu/h, No Economizer, Economizer exception: High Efficiency
Equipment
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 21--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 21 Supply, Constant Volume, 2047 CFM, 1.5 motor nameplate hp, 0.0 fan efficiency grade,0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan <= SHP
SYSTEM VERIFICATION REQUIRED.
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans,specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 90.1 (2016)Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
James Tormey-Mechanical Engineer 2/18/2021
9a-ht4-4-- /B214LQy
Name-Title Signature Date
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 7 of 36
inA COMcheck Software Version COMcheckWeb
1 1 Inspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
4.2.2, Plans,specifications, and/or ❑Complies Requirement will be met.
6.4.4.2.1, calculations provide all information ❑Does Not
6.7.2 with which compliance can be :Not Observable
[PR2]' determined for the mechanical ❑Not Applicable
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
6.7.2.4 Detailed instructions for HVAC ❑Complies Requirement will be met.
[PR511 systems commissioning included on ❑Does Not
the plans or specifications for projects Not Observable
>=50,000 ft2. ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 8 of 36
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.7 Freeze protection and snow/ice ❑Complies Requirement will be met.
[FO913 melting system sensors for future ❑Does Not
connection to controls.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 IMedium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 9 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.4.1.4, HVAC equipment efficiency Efficiency:_ Efficiency:_ ❑Complies See the Mechanical systems list
6.4.1.5 verified. Non-NAECA HVAC ❑Does Not for values.
[ME1]2 equipment labeled as meeting 90.1. ❑Not Observable
ONot Applicable
6.4.3.4.1 Stair and elevator shaft vents ❑Complies Exception: Requirement
[ME3]3 have motorized dampers that ❑Does Not does not apply.
automatically close.
ENot Observable
❑Not Applicable
6.4.3.4.2, Outdoor air and exhaust systems ❑Complies Requirement will be met.
6.4.3.4.3 have motorized dampers that IDoes Not
[ME4]3 automatically shut when not in ONot Observable
use and meet maximum leakage
rates.Check gravity dampers ONot Applicable
where allowed.
6.4.3.4.5 Enclosed parking garage ❑Complies Exception: Requirement
[ME3913 ventilation has automatic EDoes Not does not apply.
contaminant detection and
capacity to stage or modulate ENot Observable
fans to 50%or less of design ENot Applicable
capacity.
6.4.3.4.4 Ventilation fans>0.75 hp have ❑Complies Requirement will be met.
[ME5]3 automatic controls to shut off fan ❑Does Not
when not required.
❑Not Observable
ONot Applicable
6.4.3.8 Demand control ventilation ❑Complies Requirement will be met.
[ME6]1 provided for spaces>500 ft2 and ❑Does Not
>25 people/1000 ft2 occupant ['Not Observable
density and served by systems
with air side economizer,auto ONot Applicable
modulating outside air damper
control, or design airflow>3,000
cfm.
6.5.3.2.1 DX cooling systems>=75 kBtufh OComplies Exception: Requirement
[ME40]2 (>=65 kBtu/h effective 1/2016) ❑Does Not does not apply.
and chilled-water and
evaporative cooling fan motor hp ENot Observable See the Mechanical Systems list
>=Ya designed to vary supply ENot Applicable for values.
fan airflow as a function of load
and comply with operational
requirements.
6.4.4.1.1 Insulation exposed to weather ❑Complies Requirement will be met.
[ME7]3 protected from damage. ❑Does Not
Insulation outside of the ❑Not Observable
conditioned space and associated
with cooling systems is vapor ONot Applicable
retardant.
6.4.4.1.2 HVAC ducts and plenums R-_ R- ❑Complies Requirement will be met.
[ME8]2 insulated per Table 6.8.2.Where ❑Does Not
ducts or plenums are installed in
or under a slab,verification may ENot Observable
need to occur during Foundation ❑Not Applicable
Inspection.
6.4.4.1.3 HVAC piping insulation thickness. _In. _in. ❑Complies Exception: Requirement
(ME912 Where piping is installed in or EDoes Not does not apply.
under a slab,verification may ONot Observable
need to occur during Foundation
Inspection. ❑Not Applicable
6.4.4.1.4 Thermally ineffective panel ❑Complies Exception: Requirement
(ME41]3 surfaces of sensible heating EDoes Not does not apply.
panels have insulation >= R-3.5. ONot Observable
ONot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 10 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.4.4.2.1 Ducts and plenums having OComplies Exception: Requirement
[ME10]2 pressure class ratings are Seal ODoes Not does not apply.
Class A construction.
❑Not Observable
ONot Applicable
6.8.1-15, Electrically operated DX-DOAS OComplies Exception: Requirement
6.8.1-16 units meet requirements per ODoes Not does not apply.
[ME11012 Tables 6.8.1-15 or 6.8.1-16.
❑Not Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in.water OComplies Exception: Requirement
[ME1173 column requires air leakage ODoes Not does not apply.
testing.
ONot Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in.water ❑Complies Exception: Requirement I
[ME11]3 column requires air leakage ODoes Not does not apply.
testing.
ONot Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in.water ❑Complies Exception: Requirement
[ME11j3 column requires air leakage ODoes Not does not apply.
testing.
ONot Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in. water OComplies Exception: Requirement
[ME11)3 column requires air leakage ODoes Not does not apply.
testing.
❑Not Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating>3 in.water OComplies Exception: Requirement
[ME11]3 column requires air leakage ODoes Not does not apply.
testing.
[Not Observable
ONot Applicable
6.4.4.2.2 Ductwork operating>3 in. water OComplies Exception: Requirement
[ME11]3 column requires air leakage ODoes Not does not apply.
testing.
ONot Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in,water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ODoes Not does not apply.
testing. l.
ONot Observable
ONot Applicable
6.4.4.2.2 Ductwork operating>3 in. water OComplies Exception: Requirement
[ME1173 column requires air leakage ODoes Not does not apply.
testing.
ONot Observable
ONot Applicable
6.4.4.2.2 Ductwork operating>3 in.water OComplies Exception: Requirement
[ME11)3 column requires air leakage ODoes Not does not apply.
testing.
['Not Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in.water OComplies Exception: Requirement
[ME11]3 column requires air leakage ODoes Not does not apply.
testing.
ONot Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating >3 in.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ODoes Not does not apply.
testing. pp y
:Not Observable
ONot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 11 of 36
,
Section Mechanical Rou h-In Plans Verified Field Verified
# Inspection g Value Value Complies? Comments/Assumptions
& Req.ID
6.4.4.2.2 Ductwork operating>3 in.water OComplies Exception: Requirement
[ME11]3 column requires air leakage EDoes Not does not apply.
testing. ❑Not Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating>3 in.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not does not apply.
testing. [Not Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating>3 in.water DComplies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not does not apply.
testing. DNot Observable
DNot Applicable
6.4.4.2.2 Ductwork operating>3 in.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not does not apply.
testing. ❑Not Observable
DNot Applicable
6.4.4.2.2 Ductwork operating >3 in.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not does not apply.
testing. DNot Observable
DNot Applicable _
6.4.4.2.2 Ductwork operating>3 in.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ODoes Not does not apply.
testing. :Not Observable
DNot Applicable
6.4.4.2.2 Ductwork operating>3 in. water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not does not apply.
testing. ❑Not Observable
DNot Applicable
6.4.4.2.2 Ductwork operating >3 In.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not does not apply.
testing. ❑Not Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating>3 in.water ❑Complies Exception: Requirement
[ME11]3 column requires air leakage ❑Does Not . does not apply.
testing. ❑Not Observable
ONot Applicable
6.4.4.2.2 Ductwork operating >3 in. water ❑Complies Exception: Requirement
(ME11]3 column requires air leakage ❑Does Not does not apply.
testing. DNot Observable
DNot Applicable
6.5.2.1 Zone controls can limit reheating, ❑Complies Requirement will be met.
(ME17]1 recooling, simultaneous heating ❑Does Not
and cooling and sequence ['Not Observable
heating and cooling to each zone.
❑Not Applicable
6.5.2.1 Zone controls can limit reheating, ❑Complies Requirement will be met.
[ME17]1 recooling,simultaneous heating ❑Does Not
and cooling and sequence ❑Not Observable
heating and cooling to each zone. DNot Applicable _
6.5.2.1 Zone controls can limit reheating, ❑Complies Requirement will be met.
[ME17]1 recooling,simultaneous heating ❑Does Not
and cooling and sequence DNot Observable
heating and cooling to each zone.
:Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 12 of 36
Section Mechanical Rough-In Plans Verified Field Verified
& Req.ID
Inspection Value Value Complies? Comments/Assumptions
6.5.2.1 Zone controls can limit reheating, ❑Complies Requirement will be met.
[ME17]1 recooling,simultaneous heating ❑Does Not
and cooling and sequence ONot Observable
heating and cooling to each zone.
❑Not Applicable
6.5.2.1 Zone controls can limit reheating, ❑Complies Requirement will be met.
[ME17]1 recooling,simultaneous heating ❑Does Not
and cooling and sequence ['Not Observable
heating and cooling to each zone. ❑Not Applicable
6.5.2.3 Dehumidification controls ❑Complies Requirement will be met.
[ME19)3 provided to prevent reheating, ❑Does Not
recooling, mixing of hot and cold
airstreams or concurrent heating ❑Not Observable
and cooling of the same ❑Not Applicable
airstream.
6.5.2.4.1 Humidifiers with airstream ❑Complies Exception: Requirement
[ME6B]3 mounted preheating jackets have ❑Does Not does not apply.
preheat auto-shutoff value set to Not Observable
activate when humidification is ❑
not required. ❑Not Applicable
6.5.2.4.2 Humidification system dispersion ❑Complies Exception: Requirement
(ME69]3 tube hot surfaces in the ODoes Not does not apply.
airstreams of ducts or air-
handling units insulated>= R- ❑Not Observable
0.5. ❑Not Applicable
6.5.2.5 Preheat coils controlled to stop ❑Complies Requirement will be met.
[ME7O]3 heat output whenever ❑Does Not
mechanical cooling, including ❑Not Observable
economizer operation, is active.
❑Not Applicable
6.5.2.6 Units that provide ventilation air ❑Complies Requirement will be met.
(ME106]3 to multiple zones and operate in ❑Does Not
conjunction with zone heating
and cooling systems are ❑Not Observable
prevented from using heating or ENot Applicable
heat recovery to warm supply air
above 60°F when representative
building loads or outdoor air
temperature indicate that most
zones demand cooling.
6.5.3.1.1 HVAC fan systems at design ❑Complies Requirement will be met.
[ME52)3 conditions do not exceed ❑Does Not
allowable fan system motor Not Observable
nameplate hp or fan system bhp. ❑
❑Not Applicable
6.5.3.1.1 HVAC fan systems at design DComplies Requirement will be met.
[ME52]3 conditions do not exceed ❑Does Not
allowable fan system motor
nameplate hp or fan system bhp. ❑Not Observable
❑Not Applicable
6.5.3.1.1 HVAC fan systems at design OComplies Requirement will be met.
[ME52]3 conditions do not exceed ❑Does Not
allowable fan system motor
nameplate hp or fan system bhp. ['Not Observable
❑Not Applicable
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ['Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 13 of 36
Section Mechanical Rou h-In Plans Verified Field Verified
# Inspection g Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
[ME72)2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ❑Not Observable
70%.These motors are also DNot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
[ME72)2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ❑Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and DComplies Exception: Motors in the
[ME7212 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of DNot Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies Exception: Motors in the
[ME72)2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
['Not Observable
minimum motor efficiency of
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
[ME7212 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a ❑Not Observable terminal.
minimum motor efficiency of ❑Not Applicable
70%.These motors are also
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies Exception: Motors in the
[ME72)2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of [Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
(ME72)2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ❑Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
[ME72]2 < 1 hp are electronically- EDoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ❑Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
IME7212 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ❑Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control. _
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 14 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.6 Motors for fans>= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ONot Observable
70%.These motors are also ONot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of DNot Observable
70%.These motors are also ONot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ENot Observable
70%.These motors are also ONot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a Not Observable terminal.
minimum motor efficiency of ❑
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ❑Does Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ONot Observable
70%.These motors are also ONot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of ONot Observable
70%.These motors are also ONot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans>= 1/12 hp and ❑Complies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of [Not Observable
70%.These motors are also ONot Applicable
speed adjustable for either
balancing or remote control.
6.5.3.6 Motors for fans >= 1/12 hp and OComplies Exception: Motors in the
[ME72]2 < 1 hp are electronically- ODoes Not airstream within fan-coils and
commutated motors or have a terminal.
minimum motor efficiency of [Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
i
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 15 of 36
Section Mechanical Rou h-In Plans Verified Field Verified
Inspection
g Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ['Not Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108)2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ['Not Observable
terminal fan except when space ❑Not Applicable
heating is required or if required
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108)2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the [Not Observable
terminal fan except when space
heating is required or if required ENot Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control, either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 16 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ❑Not Observable
terminal fan except when space
heating is required or if required ONot Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the
terminal fan except when space ENot Observable
heating Is required or if required ONot Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108i2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ENot Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact (Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 17 of 36
Section Mechanical Rou h-In Plans Verified Field Verified
Inspection
g Value Value Complies? Comments/Assumptions
Req.ID
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME10812 terminals have automatic DDoes Not does not apply.
controls to a)turn off the ❑Not Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108)' terminals have automatic DDoes Not does not apply.
controls to a)turn off the [Not Observable
terminal fan except when space
heating is required or If required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108)2 terminals have automatic DDoes Not does not apply.
controls to a)turn off the ❑Not Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 IDEA Remodel BUILDING()EA Report date: 02/11/21
Data filename: Page 18 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ODoes Not does not apply.
controls to a)turn off the :Not Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ❑Not Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil Is
activated; and c) during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the Not Observable
terminal fan except when space ❑
heating is required or If required ONot Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 19 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME10812 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ❑Not Observable
terminal fan except when space
heating is required or If required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME10812 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ONot Observable
terminal fan except when space
heating is required or if required ONot Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108]2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the ONot Observable
terminal fan except when space ONot Applicable
heating is required or if required
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 20 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
EME10812 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the
terminal fan except when space ❑Not Observable
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108)2 terminals have automatic ODoes Not does not apply.
controls to a)turn off the ['Not Observable
terminal fan except when space
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.4 Parallel-flow fan-powered VAV air ❑Complies Exception: Requirement
[ME108)2 terminals have automatic ❑Does Not does not apply.
controls to a)turn off the
terminal fan except when space ❑Not Observable
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated; and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 21 of 36
Section Mechanical Rou h-In Plans Verified Field Verified
inspection
g Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME10912 rate is the larger of minimum ODoes Not
outdoor air rate or minimum ONot Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c) system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME10912 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1, Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
1 High Impact(Tier 1) 12 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 22 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum Not Observable
exhaust air rate required by ❑
Standard 62.1,Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
(ME10912 rate Is the larger of minimum ❑Does Not
outdoor air rate or minimum
exhaust air rate required by ❑Not Observable
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment., or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum
exhaust air rate required by ❑Not Observable
Standard 62.1, Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c) system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 23 of 36
•
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME10912 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following:a)design minimum
system outdoor air provided<
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
(ME10912 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ['Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate,b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME10912 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ['Not Observable
exhaust air rate required by 'Not Applicable
Standard 62.1, Standard 170,or
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following:a)design minimum
system outdoor air provided<
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 24 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
(ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum Not Observable
exhaust air rate required by ❑
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment., or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air - ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following:a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
(ME109]2 rate is the larger of minimum ODoes Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ONot Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 25 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate,b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air DComplies Requirement will be met.
[ME10912 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum ['Not Observable
exhaust air rate required by ❑Not Applicable
Standard 62.1, Standard 170, or
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate,b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME10912 rate Is the larger of minimum ❑Does Not
outdoor air rate or minimum ❑Not Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 26 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
[ME109)2 rate is the larger of minimum ODoes Not
outdoor air rate or minimum ONot Observable
exhaust air rate required by
Standard 62.1,Standard 170,or ONot Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air
q ❑Complies Requirement will be met.
(ME109)2 rate Is the larger of minimum Does Not
outdoor air rate or minimum
exhaust air rate required by ❑Not Observable
Standard 62.1,Standard 170,or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.7 Required minimum outdoor air ❑Complies Requirement will be met.
(ME109)2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum
exhaust air rate required by ONot Observable
Standard 62.1,Standard 170,or !' ONot Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork, and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
6.5.6.1.
6.5.3.2.2 VAV fans have static pressure ❑Complies Requirement will be met.
[ME2312 sensors positioned so setpoint ❑Does Not
<=1.2 in.w.c.design pressure. [Not Observable Location on plans/spec:
NA
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 27 of 36
Section Mechanical Rough-In Plans Verified Field Verified I# 1 Complies?
I Comments/Assumptions
& Req.ID Inspection Value Value
6.5.3.2.2 VAV fans have static pressure ❑Complies Requirement will be met.
[ME23]2 sensors positioned so setpoint ❑Does Not
<=1.2 in.w.c.design pressure. Location on plans/spec:
❑Not Observable NA
❑Not Applicable
6.5.3.2.3 Reset static pressure setpoint for ❑Complies Requirement will be met.
[ME24]2 DDC controlled VAV boxes ❑Does Not
reporting to central controller
based on the zones requiring the ❑Not Observable
most pressure.Controls provide: ❑Not Applicable
zone damper monitoring or
indicator of static pressure need;
autodetection, alarm, and
operator override of zones
excessively triggering reset to
6.5.3.2.3 Reset static pressure setpoint for
❑Complies Requirement will be met.
[ME24]2 DDC controlled VAV boxes ❑Does Not
reporting to central controller Location on plans/spec:
based on the zones requiring the Not Observable NA
most pressure.Controls provide: ENot Applicable
zone damper monitoring or
indicator of static pressure need;
autodetection,alarm,and
operator override of zones
excessively triggering reset logic.
6.5.3.2.4 Return and relief fans used to ❑Complies Requirement will be met.
[ME102)2 meet Section 6.5.1.1.5 have Does Not
relief air rate controlled to
maintain building pressure ['Not Observable
through differential supply-return ❑Not Applicable
airflow tracking. Systems with
supply fans allowed to control the
relief system based on oudoor air
damper position.Fans have
variable speed control or other
devices for managing total
return/relief fan system demand
per section threshold.
6.5.3.2.4 Return and relief fans used to DComplies Requirement will be met.
[ME102)2 meet Section 6.5.1.1.5 have ❑Does Not
relief air rate controlled to ElNot Observable
maintain building pressure
through differential supply-return ❑Not Applicable
airflow tracking.Systems with
supply fans allowed to control the
relief system based on oudoor air
damper position. Fans have
variable speed control or other
devices for managing total
return/relief fan system demand
per section threshold.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ❑Does Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
(ME4213 DDC of individual zone boxes ❑Does Not does not apply.
have static pressure setpoint
reset controls. Not Observable See the Mechanical Systems list
❑Not Applicable for values.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 28 of 36
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME4213 DDC of individual zone boxes Does Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes DDoes Not does not apply.
have static pressure setpoint ONot Observable
reset controls. fSee the or values.echanical Systems list
ONot Applicable
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with OComplies Exception: Requirement
[ME42]3 DDC of individual zone boxes ❑Does Not does not apply.
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply,
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with DComplies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
ONot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ONot Observable See the Mechanical Systems list
ONot Applicable for values.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 29 of 36
Section Mechanical Rough-In Plans Verified Field Verified# Inspection Value Value Complies.,
Comments/Assumptions
& Req.ID
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
❑Not Applicable for values.
I 6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement I
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ['Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.3.3 Multiple zone VAV systems with Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint ❑Not Observable
reset controls. , See the Mechanical Systems list
❑Not Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME4213 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
DNot Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME4213 DDC of individual zone boxes ❑Does Not does not apply.
have static pressure setpoint
reset controls. ❑Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.3.3 Multiple zone VAV systems with ❑Complies Exception: Requirement
[ME42]3 DDC of individual zone boxes ODoes Not does not apply.
have static pressure setpoint
reset controls. ['Not Observable See the Mechanical Systems list
❑Not Applicable for values.
6.5.3.5 Multiple zone HVAC systems ❑Complies Requirement will be met.
[ME43]3 have supply air temperature ODoes Not
reset controls. See the Mechanical Systems list
❑Not Observable for values.
❑Not Applicable
6.5.3.5 Multiple zone HVAC systems ❑Complies Requirement will be met.
[ME43]3 have supply air temperature ODoes Not
reset controls. See the Mechanical Systems list
:Not Observable for values.
❑Not Applicable
6.5.3.5 Multiple zone HVAC systems ❑Complies Requirement will be met.
[ME4313 have supply air temperature EDoes Not
reset controls. See the Mechanical Systems list
❑Not Observable for values.
❑Not Applicable
6.5.3.5 Multiple zone HVAC systems ❑Complies Requirement will be met.
[ME43]3 have supply air temperature ❑Does Not
reset controls. [Not ObservableSee the Mechanical Systems list
for values.
ElNot Applicable
6.5.3.5 Multiple zone HVAC systems ❑Complies Requirement will be met.
[ME4313 have supply air temperature ODoes Not
reset controls. See the Mechanical Systems list
❑Not Observable for values.
❑Not Applicable
6.5.4.2 HVAC pumping systems with >= ❑Complies Requirement will be met.
[ME2513 3 control values designed for ODoes Not
variable fluid flow(see section
❑Not Observable
details).
❑Not Applicable
6.5.6.1 Exhaust air energy recovery on ❑Complies Exception: Requirement
[ME56]1 systems meeting Tables 6.5.6.1- EDoes Not does not apply.
1, and 6.5.6.1-2. ❑Not Observable
❑Not Applicable
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) J
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 30 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow, ['Not Observable
required ventilation rate,exhaust
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow, :Not Observable
required ventilation rate,exhaust
flow minu the available transffer DNot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the Does Not
greater of criteria of supply flow, ❑Not Observable
required ventilation rate,exhaust
flow minu the available transffer DNot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME10072 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow, ['Not Observable
required ventilation rate,exhaust
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ['Complies Requirement will be met.
[ME100)2 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow,
required ventilation rate, exhaust ['Not Observable
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the DDoes Not
greater of criteria of supply flow, ❑Not Observable
required ventilation rate,exhaust
flow minu the available transffer DNot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space OComplies Requirement will be met.
[ME100]2 with mechanical exhaust<= the ODoes Not
greater of criteria of supply flow, ❑Not Observable
required ventilation rate,exhaust
flow minu the available transffer ONot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow, ❑Not Observable
required ventilation rate, exhaust
flow minu the available transffer DNot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100)2 with mechanical exhaust<=the Does Not
greater of criteria of supply flow,
required ventilation rate, exhaust DNot Observable
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<= the ODoes Not
greater of criteria of supply flow, ENot Observable
required ventilation rate,exhaust
flow minu the available transffer :Not Applicable
air(see section details).
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 31 of 36
Section Mechanical Rough-In Plans Verified Field Verified ,
# Inspection Value Value Complies. Comments/Assumptions
& Req.ID
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100)2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow,
required ventilation rate,exhaust ❑Not Observable
flow minu the available transffer ONot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow,
required ventilation rate,exhaust ONot Observable
flow minu the available transffer ONot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow,
required ventilation rate, exhaust :Not Observable
flow minu the available transffer ONot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow,
required ventilation rate,exhaust :Not Observable
flow minu the available transffer ONot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow, ❑Not Observable
required ventilation rate,exhaust
flow minu the available transffer DNot Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100)2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow,
required ventilation rate,exhaust ONot Observable
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100]2 with mechanical exhaust<=the ODoes Not
greater of criteria of supply flow,
required ventilation rate, exhaust ❑Not Observable
flow minu the available transffer :Not Applicable
air(see section details).
6.5.7.1 Conditioned supply air to space ❑Complies Requirement will be met.
[ME100)2 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow,
required ventilation rate,exhaust :Not Observable
flow minu the available transffer ONot Applicable
air(see section details).
6.5.7.2.1 Kitchen hoods>5,000 cfm have ❑Complies Exception: Requirement
[ME32]2 make up air>=50%of exhaust ❑Does Not does not apply.
air volume. ENot Observable
ONot Applicable
6.5.7.2.4 Approved field test used to ❑Complies Exception: Requirement
[ME49]3 evaluate design air flow rates ❑Does Not does not apply.
and demonstrate proper capture ENot Observable
and containment of kitchen
exhaust systems. ENot Applicable
6.5.8.1 Unenclosed spaces that are ❑Complies Exception: Requirement
[ME34]2 heated use only radiant heat. ODoes Not does not apply.
ONot Observable
ONot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 32 of 36
Section Mechanical Rough-In Plans Verified Field Verified
Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.4.3.9 Heating for vestibules and air ❑Complies Requirement will be met.
[ME63]2 curtains with integral heating ❑Does Not
include automatic controls that
shut off the heating system when ONot Observable
outdoor air temperatures>45F. ONot Applicable
Vestibule heating and cooling
systems controlled by a
thermostat in the vestibule with
heating setpoint<=60F and
cooling setpoint>=80F.
6.5.10 Doors separating conditioned ❑Complies Requirement will be met.
[ME73]3 space from the outdoors have ❑Does Not
controls that disable/reset
heating and cooling system when ONot Observable
open. ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 33 of 36
Section
# Rough-In Electrical Inspection 1 Complies? Comments/Assumptions
& Req.ID
10.4.1 Electric motors meet requirements ❑Complies Requirement will be met.
[EL9]2 where applicable. Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
[1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 34 of 36
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[F12]2 controlled by a thermostat control. DDoes Not
O Not Observable
ONot Applicable
6.4.3.1.1 Heating and cooling to each zone Is ❑Complies Requirement will be met.
(F12]2 controlled by a thermostat control. ODoes Not
[Not Observable
ONot Applicable
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[Fl2]2 controlled by a thermostat control. ODoes Not
❑Not Observable
ONot Applicable
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[F12]2 controlled by a thermostat control. ODoes Not
ONot Observable
ONot Applicable
6.4.3.1.1 Heating and cooling to each zone is ❑Complies Requirement will be met.
[FI2]2 controlled by a thermostat control. ODoes Not
O Not Observable
O Not Applicable
6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies Requirement will be met.
[FI373 deadband. ODoes Not
DNot Observable
❑Not Applicable
6.4.3.2 Temperature controls have setpoint ❑Complies Requirement will be met.
[F120)3 overlap restrictions. ODoes Not
:Not Observable
ONot Applicable
6.4.3.3.1 HVAC systems equipped with at least ❑Complies Requirement will be met.
[F121]3 one automatic shutdown control. ODoes Not
DNot Observable
DNot Applicable
6.4.3.3.2 Setback controls allow automatic ❑Complies Requirement will be met.
[FI22]3 restart and temporary operation as ODoes Not
required for maintenance. plot Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies Requirement will be met.
[F123]3 ODoes Not
ONot Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies Requirement will be met.
[F123)3 ODoes Not
[Not Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies 'Requirement will be met.
[F123)3 ODoes Not
ONot Observable
ONot Applicable
6.4.3.3.4 Zone isolation devices and controls. ❑Complies Requirement will be met.
[F123]3 ODoes Not
❑Not Observable
ONot Applicable
1 High Impact(Tier 1) 12 j Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 IDEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 35 of 36
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.3.4 Zone isolation devices and controls. OComplies Requirement will be met.
[FI23]3 DDoes Not
DNot Observable
DNot Applicable
6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met.
[F15]3 supplemental electric resistance heat ODoes Not
from coming on when not needed. DNot Observable
❑Not Applicable
6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met.
[FI5]3 supplemental electric resistance heat ODoes Not
from coming on when not needed. ❑Not Observable
DNot Applicable _
6.4.3.5 Heat pump controls prevent ❑Complies Requirement will be met.
[F15]3 supplemental electric resistance heat ODoes Not
from coming on when not needed. DNot Observable
DNot Applicable
6.4.3.6 When humidification and ❑Complies Requirement will be met.
[F16]3 dehumidification are provided to a ❑Does Not
zone,simultaneous operation is ['Not Observable Location on plans/spec: NA
prohibited. Humidity control prohibits ❑Not Applicable
rva
the use of fossil fuel or electricity to
produce RH > 30%in the warmest
zone humidified and RH <60%in the
coldest zone dehumidified.
6.7.2.1 Furnished HVAC as-built drawings '❑Complies Requirement will be met.
[Fl7)3 submitted within 90 days of system ODoes Not
acceptance. ❑Not Observable
❑Not Applicable
6.7.2.2 Furnished O&M manuals for HVAC ❑Complies Requirement will be met.
[FI8]3 systems within 90 days of system ODoes Not
acceptance. DNot Observable
❑Not Applicable
6.7.2.3 An air and/or hydronic system ❑Complies Requirement will be met.
[F19]1 balancing report is provided for HVAC ODoes Not
systems serving zones >5,000 ft2 of ❑Not Observable
conditioned area. DNot Applicable
6.7.2.4 HVAC control systems have been ❑Complies Requirement will be met.
[F110]' tested to ensure proper operation, ODoes Not
calibration and adjustment of controls. ❑Not Observable
DNot Applicable
10.4.3 Elevators are designed with the ❑Complies Exception: Requirement does not apply.
[F124]2 proper lighting,ventilation power, and Doges Not
standby mode. ❑Not Observable
DNot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 10129 OEA Remodel BUILDING OEA Report date: 02/11/21
Data filename: Page 36 of 36
OFFICE CCPV
rrYYv(y1k*��i 'hl�`[1
D►NE to �v
P
C\� p 0F� OQSa AccuSpec V4.32d
SUBMITTAL SCHEDULE & DATA
Indirect Gas-Fired Indoor or Outdoor Duct Furnaces
lob Name: OEA Date:
Location: Engineer:
Submitted by: Eric Danielson Architect:
Contractor:
Unit Tag
DH-OEA DH-E
DFP200TMRNN40A1 DFP125TMRNN40A1
Model Number
Quantity of Units' 1 1
Btu/Hr Input (each) 200,000 125,000
Btu/Hr Output (each) 162,000 101,250
CFM 4,000 2,500
Altitude 0-2000 0-2000
Temperature Rise (°F) (each) 37.5 37.5
Airside Pressure Drop ("W.C.) 0.18 0.12
(each)
Natural with Retry Natural with Retry
Gas Type Ignition Ignition
Electronic Electronic
Gas Control Type Modulation Modulation
Supply Voltage2 115/60/1 115/60/1
Control Voltage 24 V - 40 VA 24 V - 40 VA
Heat Exch/Burner/Drip Pan 409 Stainless Steel 409 Stainless Steel
Mat. 1.75
Unit Amps 2.75
Operating Weights Each (Ibs)
Base Model
Total with Options/Accys3 190 128
Notes:
1. For units configured as "Electronic Modulation—Multiple Furnaces", Quantity of Units represents the
quantity of multiple furnace sets.
2. All units are single phase voltage. For units used on 3-phase supply voltage systems, the units will be
wired line-to-line on one phase only.
3. See attached pages for Options and Accessories included.
490DINE
AccuSpec V4.32d
SUBMITTAL SCHEDULE & DATA
Indirect Gas-Fired Duct Furnace/Make-Up Air Units
Model Description Qty Tag
DFP200TMRNN40A1 Indoor Duct Furnace 1 DH-OEA
DFP200TMRNN40A1 1 DH-OEA
#32680 Air Flow Proving Switch 1 DH-OEA
38858 Field Installed - Maxitrol -55-90°F 1 DH-OEA
32732 Set Point Adjuster- Maxitrol - 55-90°F 1 DH-OEA
DFP125TMRNN40A1 Indoor Duct Furnace 1 DH-E
DFP125TMRNN40A1 1 DH-E
#32680 Air Flow Proving Switch 1 DH-E
38858 Field Installed - Maxitrol -55-90°F 1 DH-E
32732 Set Point Adjuster- Maxitrol -55-90°F 1 DH-E
'MOD/NE
AccuSpec V4.32d
DFP MODEL NOMENCLATURE
Tag: DII-OEA
1 2 3 4,5,6 7 8 9 10 11 12 13 14 15
D F P 200 TMRNN 40 A 1
1 - Product Type (PT)
D - Indoor Duct Furnace
2 - Unit Configuration (UC)
F - Furnace
3 -Venting (V)
P - Power
4,5,6 - Furnace Input Rating (MBH)
200 - 200,000 Btu/Hr Input
7 - Heat Exchanger/Burner/Drip Pan Material (HE)
T- 409 Stainless Steel
8 - Development Sequence Designation (DS)
M - 2-stage or Modulating
9 -Access Side (AS) (as viewed with air blowing toward you)
R - Right Hand
10 - Air Temperature Rise (ATR)
Non-Specific - 20-60F (baffle field removed)
11- Gas Type (GT)
N - Natural with continuous retry ignition controller
12 - Gas Valve (GV)
4 - Electronic Modulation
13-Additional Safety Switches (SS)
0 - No Additional Switches (Premium)
14 - Supply Voltage (SV)
A - 115/60/1 (Unit Voltage is 115V/60Hz/lph)
15 -Transformer (TR)
1 - 40VA
?oDINE
AccuSpec V4.32d
GENERAL PERFORMANCE DATA
c E1� uM
L,g�o
Intertek
General Performance Data (Per Furnace)
Tag: DH-OEA
Model DFP200
At 0' Elevation
Btu/Hr. Input 200,000
Btu/Hr Output 162,000
Minimum Air Temp Rise (°F) 20.0
Maximum Air Temp Rise (°F) 100.0
Minimum CFM 1500
Maximum CFM 7500
As Configured at 0-2000 Ft. Elevation
Btu/Hr. Input 200,000
Btu/Hr Output 162,000
Configured Air Temp Rise (°F) 37.5
Configured Airflow 4,000
gODINE
AccuSpec V4.32d
DIMENSIONS — UNIT
Model DFP200 Dimensions
H -
A
18'39
F(MOUNTING HOLES)
(MHOL IES)O
G �I
I i
-1 �
J(ROUND) Ill W i L i
uliji
07-
E ' �� Ill Ill Ill Ill
(DUCTSIZE) 1.41 I 11, 3' .I PREMIUM
CONTROL i w
GY� BOX O N B
M —�191 H�i=„t,
F.��1�11 •
O
1. n
8. 10.50 •Its'
I K
22.907 D(DUCT SIZE)
C
Tag: DH-OEA
Dimensions (inches)
A 24.29
g 37.05
C 24.09
p 24.09
E 23.07
F 22.98
G 21.6
32.78
20.68
6
K 23.26
M 1.94
N 33.65
0 (max. approx.) 6.8
p 17.4
Gas Connection Pipe Size 1/2"
Base Model Weight (Ibs) (each) 167
Premium
Note: This is a general submittal drawing showing right hand access. Left hand access units will be rotated.
SPECIFICATIONS
Tag: DH-OEA
Model Number: DFP200TMRNN40A1
General
Standards
The duct furnace(s) shall include ETL design certification for use in both the US and Canada to the
ANSI Z83.8 - latest revision, standard for "Gas Unit Heater and Gas-Fired Duct Furnaces" for safe
operation, construction, and performance.
Mechanical Configuration
All unit(s) shall have right side access, when looking into the discharge, and include:
Furnace section(s) controls.
Indoor Power Vented
The venting shall be power vented with an integral, factory installed power exhauster with a side
access round vent connection to allow for tighter installation to duct system components. The
furnace controls shall include a differential air pressure switch to ensure proper venting and power
exhauster operation. The unit shall be tested to insure proper ignition when the unit is subjected to
40 mile per hour wind velocities.
Unit Casing
The duct furnace(s) unit casing shall be constructed of not less than 20 gauge aluminized steel.
The heat exchanger(s) seams and duct connections shall be certified to withstand 3.0" W.C.
external static pressure without burner flame disturbance.
The burner(s) shall be made of the same material as the heat exchanger with a thickness of not
less than 28 gauge. Burner(s) shall have non-clogging, slotted ports with a stainless steel separator
strip designed for good lighting characteristics without noise of extinction for both natural and
propane gas. The burner(s) shall be located for service removal without disconnecting the main
gas supply piping.
The bottom of the unit shall be angled for draining any condensation to the center of the unit. The
condensation shall be removed through the connection of a drain to the knockout opening in the
bottom pan. The drain pan shall be constructed of 20 gauge 409 stainless steel.
The gas manifold piping shall allow for gas piping connection on the side of the unit for slab
mounted units and through the unit bottom for suspended units. The manifold shall include a
ground joint union for ease of servicing of the orifices without removing the burner assembly or
main gas valve string.
The orifices shall be provided on both natural and propane gas with adjustable air shutters for
controlling the primary air mixture.
The ignition controller(s) shall be 100% shut-off with continuous retry for natural gas.
The gas pressure shall be between 6-7" W.0 for natural gas.
The solid state ignition system shall intermittently light the pilot each time the system is energized.
Once the pilot is proven, the main gas valve shall open and allow gas flow to the main burner.
The unit gas controls shall be provided with the following:
Electronic modulation gas controls with an electronic modulating/regulating gas control,
combination gas valve, an ignition control, modulating amplifier, and a modulating duct thermostat
with remote temperature set point adjuster. The thermostat can modulate the system gas flow
between 40% through 100% full fire. The firing rate shall be controlled by a duct sensor with
remote temperature adjuster.
A 1/8" manifold pressure tap shall be located after all valves to test the manifold pressure directly
before the main burner orifices.
The unit shall be provided with a single gas control transformer to step down the supply voltage to
24V.
For 460V and 575V units, a step down transformer from line voltage to 115V shall be provided for
operation of the power exhauster motor.
Separate line voltage and low voltage terminal strips shall be provided to prevent the unit from
being miswired.
Automatic reset high limit switch.
Provide the following factory installed options:
Air flow proving which shall be an adjustable differential pressure switch to insure air flow across
the heat exchanger before allowing the gas controls to be energized.
The unit shall be orificed for up to 2000 feet elevation above sea level.
Electrical Section
All electrical components shall carry UL, ETL, or CSA listing.
A single step down transformer shall be provided for all unit controls.
Mounting
The duct furnace shall be provided with four mounting holes to insure level hanging of suspended
units. The unit shall also be designed to allow for slab mounting on a non-combustible surface.
Thermostat(s)
A field installed electronic modulating duct thermostat for use with a set point adjuster with a range
of55°-90°F.
14;1910D/NE
AccuSpec V4.32d
DFP MODEL NOMENCLATURE
Tag: DH-E
1 2 3 4,5,6 7 8 9 10 11 12 13 14 15
D F P 125 TMRNN 4 0 A 1
1 - Product Type (PT)
D - Indoor Duct Furnace
2 - Unit Configuration (UC)
F - Furnace
3 - Venting (V)
P - Power
4,5,6 - Furnace Input Rating (MBH)
125 - 125,000 Btu/Hr Input
7 - Heat Exchanger/Burner/Drip Pan Material (HE)
T - 409 Stainless Steel
8 - Development Sequence Designation (DS)
M - 2-stage or Modulating
9 -Access Side (AS) (as viewed with air blowing toward you)
R - Right Hand
10 -Air Temperature Rise (ATR)
Non-Specific - 20-60F (baffle field removed)
11- Gas Type (GT)
N - Natural with continuous retry ignition controller
12 - Gas Valve (GV)
4 - Electronic Modulation
13-Additional Safety Switches (SS)
0 - No Additional Switches (Premium)
14 - Supply Voltage (SV)
A - 115/60/1 (Unit Voltage is 115V/60Hz/lph)
15 -Transformer(TR)
1 - 40VA
?DINE
AccuSpec V4.32d
GENERAL PERFORMANCE DATA
caus
Intertek
General Performance Data (Per Furnace)
Tag: DH-E
Model DFP125
At 0' Elevation
Btu/Hr. Input 125,000
Btu/Hr Output 101,250
Minimum Air Temp Rise (°F) 20.0
Maximum Air Temp Rise (°F) 99.9
Minimum CFM 938
Maximum CFM 4688
As Configured at 0-2000 Ft. Elevation
Btu/Hr. Input 125,000
Btu/Hr Output 101,250
Configured Air Temp Rise (°F) 37.5
Configured Airflow 2,500
jODI►NE
AccuSpec V4.32d
DIMENSIONS - UNIT
Model DFP125 Dimensions
H
A
18.39
(MOUNTING F(MOUNTING HOLES)
HOLES) G
J(ROUND) I II■II■I,I■II■II■FI■III
•
4110._111
'-' �: L �' I =_= 1Iu•i•II■II■II■II
E(DUCT SIZE) 1.41 I 115 CONTROL
,I�. BOX
I
M : MIIIIHRIWI���i
0
erd=11I. It j Illl�llllfllll=I llllllliduullllll
8.965 10.50 Gull to
........ ..........
I I K
22.907 D(DUCT SIZE)
C
Tag: DH-E
Dimensions (inches)
A 17.9
8 33.05
22.43
D 17.7
E 19.07
F 16.59
G 15.14
H 26.26
l 17.83
4
K 17.04
M 2.01
N 29.65
0 (max. approx.) 5.6
P 14.03
Gas Connection Pipe Size 1/2"
Base Model Weight (Ibs) (each) 107
Premium
Note: This is a general submittal drawing showing right hand access. Left hand access units will be rotated.
SPECIFICATIONS
Tag: DH-E
Model Number: DFP125TMRNN40A1
General
Standards
The duct furnace(s) shall include ETL design certification for use in both the US and Canada to the
ANSI Z83.8 - latest revision, standard for "Gas Unit Heater and Gas-Fired Duct Furnaces" for safe
operation, construction, and performance.
Mechanical Configuration
All unit(s) shall have right side access, when looking into the discharge, and include:
Furnace section(s) controls.
Indoor Power Vented
The venting shall be power vented with an integral, factory installed power exhauster with a side
access round vent connection to allow for tighter installation to duct system components. The
furnace controls shall include a differential air pressure switch to ensure proper venting and power
exhauster operation. The unit shall be tested to insure proper ignition when the unit is subjected to
40 mile per hour wind velocities.
Unit Casing
The duct furnace(s) unit casing shall be constructed of not less than 20 gauge aluminized steel.
The heat exchanger(s) seams and duct connections shall be certified to withstand 3.0" W.C.
external static pressure without burner flame disturbance.
The burner(s) shall be made of the same material as the heat exchanger with a thickness of not
less than 28 gauge. Burner(s) shall have non-clogging, slotted ports with a stainless steel separator
strip designed for good lighting characteristics without noise of extinction for both natural and
propane gas. The burner(s) shall be located for service removal without disconnecting the main
gas supply piping.
The bottom of the unit shall be angled for draining any condensation to the center of the unit. The
condensation shall be removed through the connection of a drain to the knockout opening in the
bottom pan. The drain pan shall be constructed of 20 gauge 409 stainless steel.
The gas manifold piping shall allow for gas piping connection on the side of the unit for slab
mounted units and through the unit bottom for suspended units. The manifold shall include a
ground joint union for ease of servicing of the orifices without removing the burner assembly or
main gas valve string.
The orifices shall be provided on both natural and propane gas with adjustable air shutters for
controlling the primary air mixture.
The ignition controller(s) shall be 100% shut-off with continuous retry for natural gas.
The gas pressure shall be between 6-7" W.0 for natural gas.
The solid state ignition system shall intermittently light the pilot each time the system is energized.
Once the pilot is proven, the main gas valve shall open and allow gas flow to the main burner.
The unit gas controls shall be provided with the following:
Electronic modulation gas controls with an electronic modulating/regulating gas control,
combination gas valve, an ignition control, modulating amplifier, and a modulating duct thermostat
with remote temperature set point adjuster. The thermostat can modulate the system gas flow
between 40% through 100% full fire. The firing rate shall be controlled by a duct sensor with
remote temperature adjuster.
A 1/8" manifold pressure tap shall be located after all valves to test the manifold pressure directly
before the main burner orifices.
The unit shall be provided with a single gas control transformer to step down the supply voltage to
24V.
For 460V and 575V units, a step down transformer from line voltage to 115V shall be provided for
operation of the power exhauster motor.
Separate line voltage and low voltage terminal strips shall be provided to prevent the unit from
being miswired.
Automatic reset high limit switch.
Provide the following factory installed options:
Air flow proving which shall be an adjustable differential pressure switch to insure air flow across
the heat exchanger before allowing the gas controls to be energized.
The unit shall be orificed for up to 2000 feet elevation above sea level.
Electrical Section
All electrical components shall carry UL, ETL, or CSA listing.
A single step down transformer shall be provided for all unit controls.
Mounting
The duct furnace shall be provided with four mounting holes to insure level hanging of suspended
units. The unit shall also be designed to allow for slab mounting on a non-combustible surface.
Thermostat(s)
A field installed electronic modulating duct thermostat for use with a set point adjuster with a range
of 55°-90°F.
41r4'NORTEK Preliminar eC) .
AIR SOLUTIONS ! Design Summary
Project Name: Oregon Education Association ��\Pi,PP Quote #:
Unit Tag: AHU- DOAS 2500 CFM c\L� O\�f\S\Q`N
Testing S�\
Air Performance NONE Witness Test NONE
Sound NONE Inspection NONE i
Cabinet Leak Test NONE
Weights
Shipping Weight 430 lb Operating Weight 322 lb
FANWALL Replacement: 2,500 ACFM
• FANWALL: Supply, 1 Wide x 1 High Array, HPF-A100 Size 16, 105%Wheel, 1 HP 4-Pole Baldor Motors
(460/3/60), Standard Electrical System, (1) 2 HP ABB ACH580 VFD (VFD is subject to change at time of supply)
(1)Type: VFD Only,Voltage: 460/3/60, Size: 14.700 in (H)x 4.900 in (W)x 8.800 in (D), Remote Mounted
(1)Type: MSP Panel,Voltage: 460/3/60, Size: 16.000 in (H) x 20.000 in (W)x 8.000 in (D), Remote Mounted
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7.12.2
a 4
Preliminary
21.5
h— I I
81 38
Cab IDArray Cell
4 ,- 5+E
' _ _I
I
21.5 EP3
EP2
T-1:—
I I II II
I I II II
66 h--
Cab ID
38 38
Array Cell I I I I (^
en "1-o
II
NAW
o Cell---"'III
30.25
Overall
e
E
ot
All dimensions shown in inches, Operating weights shown in
pounds. �OOINn�3 [�,r Oregon Education Association
FANWALL Replacement 2500 ACFM
Blankoffs by Others. AIR SOLUTIONS anh lap
RNU— BOAS 2500 CM unN*roe Ong ay
G-0UNTAIR Rep Fir,,, Indoor 1
Weight Box ay
19855 SW 124th Ave. (503)639-0113 322 1
Tualatin,OR 97062 www.nortekoiocom Rep concoct model No
The document totare„e,t lcw ilee a,a praat7 a weka a S..‘US.1Tyson A1eGrow WI-2K
malt cot h re or J�,my tenon Ana mix ore.pmiNn To Nee d Vow factory 51E quote No Job No Dote m/tl/y Rev
pamk et ohm pmey us.a Coma..pale(cotton w Netektuem/Conk 7.12.2 —002 2/6/2021
/if'NORTEK Preliminary
AIR SOLI.JTIONS Electrical Layout
HUNTAIR
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU-DOAS 2500 CFM
(Electrical Layout
VFD Only �j'' MSP Panel FANWALL 1 (Supply)
Electrical Service "' EP3
�,��, } Type 1 9 Type 1 oo Supply Fan
Power:460/3/60 l Remote Mounted Remote Mounted (1)Fans
(Wiring by others) (Wiring by others)
Note:The FLA and MCA values shown are estimated,see the electrical schematics for the actual values.
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7.12.2
/%.41v NORTEK.. Preliminary
AIR SDI UTIOIVS
HUNTAA FAN WALL 1 (Supply) : FWT1 : Box A
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU- DOAS 2500 CFM
Configuration/Quantity
Function Supply Fan Cell Size Height Width Depth Overall Depth
Quantity 1 38.00 in 38.00 in 25.00 in 30.25 in
Array • 1 Rows x 1 Cols Elev./Temp. 39 ft/70.0°F
Construction Gen III Motor&Wheel Weight 108 lb Redundant 0
Inlet Cone Location Upstream Removable Fan Cell Weight 253 lb Empty 0
Stand Height N/A Ship Loose Fan (Wheel, Motor and Mounting Base) 0
Options
Coplanar Insulation Standard Melamine Cell Finish None
Extended Coplanar NO Insulation Retainer NO
Back Draft Dampers HBD0212 Inlet Attenuation None
Inlet Cone Type A100 Curved Cone Blankoff Material 16Ga Galv
Discharge Guard NO Blankoff Finish None
Cell Material Aluminum/Steel
Fan Wheel
Wheel Type HPF-A100 Width 105 %
Diameter 16 Max RPM 3930
Balancing Planes 1 Wheel Finish None
Motor
Manufacturer Baldor Model 05G660W052G2
HP Each/Total 1/ 1 Efficiency 86.5
Poles/RPM 4-Pole/ 1750 Service Factor 1.15
Frame/Casing 143T/TEAO Shaft Grounding Yes
Volts/ Phase/Hz 460/3/60 FLA Each/Total 1.4/ 1.4 Amps
Winding N/A Motor HP Safety Factor 3.0%
Variable Frequency Drive
Furnished by Factory Maximum Hertz 52.97
Quantity 1 Input Line Reactor NO
Manufacturer ABB ACH580 VFD Communication None
Model No ACH580-01-03A5-4 Switching Frequency Default
Horsepower 2 Voltage 460/3/60
Input/Output Amps 3.5/ 3.5 Amps
Control System
Redundant VFD NO Flow Monitoring None
Bypass Circuit None Fans to Monitor None
Drive Standard Display N/A
Optimization Control NO Communication N/A
Control Method By Others
Notes/ Features
1.To view patents and other pending U.S. or Canadian applications visit www.nortekair.com/patents.
2. Cone constant = 1671, cone flow differential pressure = 2.24 in.H2O at 2500 CFM per fan.
3. The estimated VFD input watts are based on the motor and VFD efficiency at the selected load and RPM.
4. Fans balanced to a maximum allowable level of 0.022 inches per second peak.
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503) 639-1269 7 12 2
/49 NORTEK Preliminary
AIR SOLUTIONS FANWALL 1 (Supply) : FWT1 : Box A
!IL NTAIR
Project Name: Oregon Education Association Quote#:
Unit Tag: AHU- DOAS 2500 CFM
1.9—
1.8 Ir-
1.6—
R —0.6
= 1.4—
_ Condition 1
i = 1.2— \
d 1.0- N.,,-0.4
V m
co 0.8—
d
7fi 0.6
—0.2
0.4—
0.2—
o.a_ —a
Wi 0 500 1,000 1,500 2,000 2,500 3,000
Airflow CFM
touno
aiii
""°"'°°` AMCA Licensed for Sound and Air Performance Without Appurtenances(AcrPssories).
Performance certified is for installation type A:Free Inid/Free Outlet
Power[bhp]excludes drives
Operating Conditions
Usage SP(in.H20) Cell Qty Fanwheel BHP Vel FEG
Operating Condition (%) CFM Input Adj On Off Fail RPM Hz Each Total (t/min) Watts %Off Peak
Condition 1 100 2,500 1.25 1.30 1 0 0 1,453 49.8 0.73 0.73 311 706 FEG80 0%
Bare Fan Sound Power with Coplanar Silencer(dB re: 10E-12 watts)
Operating Condition 63 125 250 500 1K 2K 4K 8K LwA Lw
Inlet 65 67 77 69 66 65 60 58 73 79
Condition 1 Outlet 68 69 77 66 64 62 55 47 71 79
Notes/ Features
1. Fan data accuracy as per AMCA 311 (63Hz +6 dB, remaining bands +3 dB with an additional 3 dB available in any one band).
Model predictive accuracy is ±6 dB. Fan and modeling accuracy is based on ideal flow patterns and design conditions. Projected
fan and system sound levels are provided for comparison purposes only, actual levels may vary.
2. Sound power projections are not valid with VFD motor control carrier frequencies of less than 8KHz.
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7.12.2
../4011r NORTEK Preliminary
.4[R FU1_I IT IL JNs
AMCA Statement
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU- DOAS 2500 CFM
Nortek Air Solutions LLC certifies that the HPF-A100 fan wheel
shown herein is licensed to bear the AMCA Seal. IMCCI
The ratings shown are based on tests and procedures performed in accordance imp ORIDWIDE
with AMCA Publication 211 and AMCA Publication 311 and comply CERTIfiED
with the requirements of the AMCA Certified Ratings Program. RATIA6f
The AMCA licensed air and/or sound performance data has been modified for
installation,appurtenances or accessories, etc. not included in the SOUAD
certified data. The modified performance is not AMCA licensed but is MID
provided to aid in selection and applications of the product.
Performance certified is for installation type A: Free Inlet/Free Outlet AIR
Power [bhp] excludes drives PERfORIM0e0E
FWTRating DLL: Ver-1.2 / November 2017 RIR Ey
RIOYERIERT kk.
RRD CORTROL -00
REBOCIRTIOR
IRTERRRTIORIII.
AMCA Page 1 of 1 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7 12 2
/40"NORTEK Preliminary
AIR SULUTIUNB
�,..wTAia Design Summary
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU-DOAS 4000 CFM
Testing
Air Performance _ NONE Witness Test NONE
Sound NONE Inspection NONE
Cabinet Leak Test NONE
Weights
Shipping Weight 1 468 lb I Operating Weight l 359 lb
FANWALL Replacement:4,000 ACFM
• FANWALL: Supply, 1 Wide x 1 High Array, HPF-A100 Size 20, 60%Wheel, 2 HP 4-Pole Baldor Motors
(460/3/60), Standard Electrical System, (1) 2 HP ABB ACH580 VFD (VFD is subject to change at time of supply)
(1)Type: VFD Only,Voltage: 460/3/60, Size: 14.700 in (H) x 4.900 in (W)x 8.800 In (D), Remote Mounted
(1)Type: MSP Panel,Voltage: 460/3/60, Size: 16.000 in (H)x 20.000 in (W)x 8.000 in (D), Remote Mounted
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503) 639-1269 7.12.2
Preliminary
•
25.5
I I
— I
r -1
93 42 42 1
Cab IDArray Cell I a J
(� _
— I
I I
25.5 EP7
EP6
24 I I II II
I I II II
--
66 _ —
Cab ID ` r _
I /� �\
Array Cell I J I I I L/— —
—„ J J I II - -L _�/ II
1 1 II
24 0
1...
_ Cell
29.25
Overall
1
E
11
NI dimensions shown in inches, Operating weights shown in r���r1I rrvt�77 Oregon Education Association
FANWALL Replacement 4000 ACFM ounds. /7 7 tJV�Q �W�
Blankoffs by Others. AIR SOLUTIONS unit Tag unit Type Dag ay
h-0LII+O reA10R AHU—DOAS 4000 CM Indoor 1
Fep Firm Weight Boo(ly
19855 SW 124th Ave. 359 1
(503)63970113 Rep comact Moan No
Tualatin,OR 97062 www.norlekoir.<om Tyson McGraw FN7-46
as onnoI'e tmwmtio{ qtr rd arc ropol,e1 Maki Rr SOn4o.aC ara NeiSDn ver Factory SAE (Note No Job No Date m/d/y Rev
M h rmro0nd a Wed me,Io,Aka e7twt prr rAlen pmrmm 1p iitr
e ed MFs prsq uS w<m>en pmml epyea4arn.B rlmnwwryamne 7.12.2 —001 2/8/2021
•
f4f NORTEK- Preliminary
AIR SOLUTIONS Nl 1NTAIR Electrical Layout
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU-DOAS 4000 CFM
(Electrical Layout)
34.1 VFD Only MSP Panel
Elerrical Service} (EP6) (EP7) FANWALL 1 (Supply)�POWel:460/3/60 ��a Type 1 r3 —r Type 1 F1—� , Supply Fan
l Remote Mounted Remote Mounted [1)Fans
wiring by others) (Wiring by others)
Note:The FLA and MCA values shown are estimated,see the electrical schematics for the actual values.
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7.12.2
/''NORTEK, Preliminary
AIR SOI JTIONB FANWALL 1 (Supply) : FWT1 : Box A
HUNTAIR
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU-DOAS 4000 CFM
Configuration/Quantity
Function Supply Fan Cell Size Height Width Depth Overall Depth
Quantity 1 42.00 in 42.00 in 24.00 in 29.25 in
Array 1 Rows x 1 Cols Elev./Temp. 39 ft/ 70.0°F
Construction Gen III Motor&Wheel Weight 123 lb Redundant 0
Inlet Cone Location Upstream Removable Fan Cell Weight 285 lb Empty 0
Stand Height N/A Ship Loose Fan (Wheel, Motor and Mounting Base) 0
Options
Coplanar Insulation Standard Melamine Cell Finish None
Extended Coplanar NO Insulation Retainer NO
Back Draft Dampers HBD0214 Inlet Attenuation None
Inlet Cone Type A100 Curved Cone Blankoff Material 16Ga Galv
Discharge Guard NO Blankoff Finish None
Cell Material Aluminum/Steel
Fan Wheel
Wheel Type HPF-A100 Width 60 0/0
Diameter 20 Max RPM 3521
Balancing Planes 1 Wheel Finish None
Motor
Manufacturer Baldor Model 05G660W649G3
HP Each/Total 2/2 Efficiency 86.5
Poles/RPM 4-Pole/ 1725 Service Factor 1.15
Frame/Casing 145T/TEAO Shaft Grounding Yes
Volts/ Phase/Hz 460/3/60 FLA Each/Total 2.7/2.7 Amps
Winding N/A Motor HP Safety Factor 3.0%
Variable Frequency Drive
Furnished by Factory Maximum Hertz 68.32
Quantity 1 Input Line Reactor NO
Manufacturer ABB ACH580 VFD Communication None
Model No ACH580-01-03A5-4 Switching Frequency Default
Horsepower 2 Voltage 460/3/60
Input/Output Amps 3.5/ 3.5 Amps
Control System
Redundant VFD NO Flow Monitoring None
Bypass Circuit None Fans to Monitor None
Drive Standard Display N/A
Optimization Control NO Communication N/A
Control Method By Others
Notes/ Features
1.To view patents and other pending U.S. or Canadian applications visit www.nortekair.com/patents.
2. Cone constant = 2524, cone flow differential pressure = 2.51 in.H20 at 4000 CFM per fan.
3. The estimated VFD input watts are based on the motor and VFD efficiency at the selected load and RPM.
4. Fans balanced to a maximum allowable level of 0.022 inches per second peak.
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7.12.2
/mow NORTEK Preliminary
AIR SOLUTIONS HIINTAIF FANWALL 1 (Supply) : FWT1 : Box A
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU-DOAS 4000 CFM
3.9 r—
3.5—
R
3.0— \S.
—1.5
;,
2.6—
U \`
a 2.2— \\
in 1.7— -r
a>
1.3— ondition 1
0.9— —0.5
0.4—
Eir 0.0 D
0 1,060 2.000 3.000 4,000
founo Airflow CFM
A
AMCA Licensed for Sound and Air Performance Wthout Appurtenances(Accessories).
Performance certified is for installation type A:Free Inlet'Free Outlet
Power[bhp]excludes drives
Operating Conditions
Usage SP(in.H20) Cell Qty Fanwheel BHP Vel FEG
Operating Condition Watts l%) CFM Input Adj On Off Fail RPM Hz Each Total llt/min) %/0 Off Peak
Condition 1 100 4,000 1.25 1.37 1 0 0 1,800 62.6 1.53 1.53 399 1,392 FEG80 8%
Bare Fan Sound Power with Coplanar Silencer(dB re: 10E-12 watts)
Operating Condition 63 125 250 500 1K 2K 4K 8K LwA Lw
Condition 1 Inlet 73 73 84 78 76 77 75 69 84 87
Outlet 74 71 79 73 75 73 70 57 79 83
Notes/ Features
1. Fan data accuracy as per AMCA 311 (63Hz +6 dB, remaining bands +3 dB with an additional 3 dB available In any one band).
Model predictive accuracy is ±6 dB. Fan and modeling accuracy is based on ideal flow patterns and design conditions. Projected
fan and system sound levels are provided for comparison purposes only,actual levels may vary.
2. Sound power projections are not valid with VFD motor control carrier frequencies of less than 8KHz.
Date(M/d/yyyy): 2/8/2021 19855 SW 124TH AVENUE • TUALATIN,OR 97062 Design Assistant
(503)639-0113 • FAX(503)639-1269 7.12.2
/4."NORTEK Preliminary
AIR SCLLJTILNE; AMCA Statement
1/1!V?41C;
Project Name: Oregon Education Association Quote #:
Unit Tag: AHU-DOAS 4000 CFM
Nortek Air Solutions LLC certifies that the HPF-A100 fan wheel amen
shown herein is licensed to bear the AMCA Seal.
The ratings shown are based on tests and procedures performed in accordance WORLDWIDE
with AMCA Publication 211 and AMCA Publication 311 and comply CERTIFIED
with the requirements of the AMCA Certified Ratings Program. RRTIfGS
The AMCA licensed air and/or sound performance data has been modified for
installation,appurtenances or accessories, etc. not included in the SOURD
certified data. The modified performance is not AMCA licensed but is
provided to aid in selection and applications of the product.
Performance certified is for installation type A: Free Inlet/Free Outlet AIR
Power [bhp] excludes drives PERFORRIR110E
FWTRating DLL: Ver-1.2 / November 2017 RIR �k
AIOVEmcnT *o
RAD CORTROI o'go
RlfOCIRTIOR �•e
IIITERRRTIOfRI.IRC.
AMCA Page 1 of 1 19855 SW 124TH AVENUE • TUALATIN, OR 97062 Design Assistant