Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
8 tic/3c0,;/ -0aa.5:6"- Dianna Ornelas / .�3 9� I gu t �0u �~ j fez From: Eric Evans <eric@emeriodesign.com> Sent: Friday, February 26, 2021 8:12 AM To: Pam Boyd;#Building Permit Technicians; Dianna Ornelas Subject: RE: Bull Mountain Summit demo Warning!This message was sent from outside your organization and we are unable to Allow sender I Block sender verify the sender. Dianna, I'm stepping in for Pam. It looks like the values we gave you for the demo was incorrect. $12,000 each is what we budgeted. Call or email if I misunderstood your questions. C E!4ERIO Eric D. Evans, PE I Engineering Manager 6445 SW Fallbrook Place, Suite 100, Beaverton, OR 97008 ,A ENGINEERING•SURVEYING•DESIGN Cell: 503.853.1910 Office: 503.746.8812 I www.emeriodesign.com From: Pam Boyd <pam@emeriodesign.com> Sent: Friday, February 26, 2021 7:14 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Dianna Ornelas<Dianna@tigard-or.gov>; Eric Evans<eric@emeriodesign.com> Subject: Re: Bull Mountain Summit demo Thank you Dianna. We will get back to you as soon as we can. Pam From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent:Thursday, February 25, 2021 4:21 PM To: Pam Boyd <pam@emeriodesign.com> Subject: RE: Bull Mountain Summit demo [External Sender] Hi Pam, Planning has approved completeness review and I am creating these demo permits to be routed offsite for plan review, however I need clarification on the project valuation that was entered on the applications. • 15345 SW Bull Mountain Rd: 3,370 sf dwelling on septic system at$149,000 project valuation • 15395 SW Bull Mountain Rd: 1,924 sf dwelling on septic system at$126,810 project valuation 1 Please confirm the information above so that we can continue our review. Thank you. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: Pam Boyd <pam@emeriodesign.com> Sent: Friday,January 15, 2021 7:31 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: Bull Mountain Summit demo Dianna, Thank you for the email. All of the information is great help. Have a goo day. E1'IERIO Pam Boyd I Project Coordinator 6445 SW Fallbrook Place, Suite 100, Beaverton, OR 97008 W1 ENGiNEERIMG•SURVEYING•DESIGN 503.746.8812 I www.emeriodesign.com Be sure to check out our new website! From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Sent:Thursday,January 14, 2021 3:27 PM To: Pam Boyd <pam@emeriodesign.com> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: Bull Mountain Summit demo [External Sender] Hello Pam, Thank you for contacting us regarding the demolition work for this project. I understand that there are (2) residential dwellings to be demolished for this subdivision at 15345 and 15395 SW Bull Mountain Rd. For each lot, we will need the following: • Completed permit application form (see attached). • (2) copies of a site plan, drawn to scale, no larger than 11x17 that includes the footprint and sf each structure to be demolished, utility locations, erosion control measures, tree protection measures, if applicable, etc. See Page 2 of application for site plan requirements. • In the description section of the permit application, please indicate if the dwelling is on septic or public sewer system. 2 These demolition permits must be finaled prior to issuance of new construction permits in order to receive SDC credits for transportation, parks, sanitary sewer(if applicable) and water meters. The demo credits will be applied to the first two new construction submittals. Please be sure to write in the description of these applications that 'demo credits apply'. Please allow 4-8 weeks to process the demolition permits and the permit technicians will contact you as soon as the permits are ready and with instructions to pay fees online. Thank you and please let me know if you have any questions. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: Pam Boyd <pam(a@emeriodesign.com> Sent:Thursday,January 14, 2021 1:23 PM To:#Building Permit Technicians<TigardBuildingPermits@tgard-or.gov> Subject: RE: Bull Mountain Summit demo Thank you for your time and help. E ERIO Pam Boyd I Project Coordinator 6445 SW Fallbrook Place, Suite 100, Beaverton, OR 97008 him thg4 ,rcrp,«c>SaJIKVIIYING•DtSIGN 503.746.8812 I www.emeriodesign.com Be sure to check out our new website! From:#Building Permit Technicians<TigardBuildingPermits@tgard-or.gov> Sent:Thursday,January 14, 2021 10:14 AM To: Pam Boyd<pam@emeriodesign.com> Subject: RE: Bull Mountain Summit demo [External Sender] Hi Pam, Yes, applications and site plans can be dropped off in the lobby of the Permit Center, Monday-Thursday, 8 am to 5 pm. We are closed on Fridays. All payment can be done online via a link we will provide in later email communications.There is a 3%service fee for online payments. We can also accept checks sent to us via mail. Please do not leave any checks in the submittal box in the lobby, as they will not be secure. I'm happy to answer any more questions about the process. I know things are a little different right now with all the COIVD changes! 3 Thanks, Holly Van De Wege Program Development Specialist City of Tigard I COMMUNITY DEVELOPMENT 13125 SW Hall Boulevard Tigard,Oregon 97223 www.tigard-or.gov From: Pam Boyd <pam@emeriodesign.com> Sent:Thursday,January 14, 2021 9:53 AM To:#Building Permit Technicians<TigardBuildingPermits@tgard-or.gov> Subject: Bull Mountain Summit demo Good Morning, We are getting ready to submit a demo permit application for our Bull Mountain Summit project. I am wondering in these covid times we drop off the application and site plan at the lobby for processing and then you would send us a link to pay the fee? At your convenience can you let me know. Thank you. Have a great day C EMERIO Pam Boyd I Project Coordinator 6445 SW Fallbrook Place, Suite 100, Beaverton, OR 97008 1 [NGtNEtRING•SURVEYING•Dim N 503.746.8812 I www.emeriodesign.com 1 Be sure to check out our new website! ��� DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 111 9,1 73 4 4 Branden Taggart From: #Building Permit Technicians Sent: Monday, March 8, 2021 10:58 AM To: 'Graham Colton' Subject: RE: Bull Mountain Summit demo - BUP2021-00055 & BUP2021-00056 - Permits Ready Attachments: Receipts.pdf Hi Graham, We received (2) checks for the following permits, and I have attached the receipts above for you. Once we have the contractor's CCB license information we will be able to issue both permits. Thank you, Branden Taggart Ph City of Tigard 11, '0,, Senior Permit Technician Community Development TIOMW 13125 SW Hall Blvd Tigard, OR 97223 (503)718-2449 brandent©tigard-or,gov From: #Building Permit Technicians Sent: Wednesday, March 3, 2021 2:39 PM To: Graham Colton <gcolton9@gmail.com> Subject: RE: Bull Mountain Summit demo- BUP2021-00055 & BUP2021-00056 - Permits Ready Hello Graham, It is easy to pay by check online, which is the preferred method of payment. If the check is mailed, please send to City of Tigard—Building Division, 13125 SW Hall Blvd,Tigard,OR 97223 so that it goes directly to our department. Thank you. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: Graham Colton <gcolton9@gmail.com> Sent: Wednesday, March 3, 2021 10:13 AM 1 To: #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Re: Bull Mountain Summit demo- BUP2021-00055& BUP2021-00056 - Permits Ready Caution!This message was sent from outside your organization. Eric, Do you want me to send a check to you for the two demo permits and you send on to the City or what? Graham On Tue, Mar 2, 2021 at 3:51 PM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>wrote: Hello Eric, The demo permits for this project are ready to issue and the balance due is shown below(see attached invoices): • BUP2021-00055—15345 SW Bull Mountain Rd -$337.42 • BUP2021-00056—15395 SW Bull Mountain Rd - $337.42 The fees can be paid online at https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for each permit record number under the Building tab. There is a service fee of 3%for payments by card, and there is no service fee for payments made by e-check. On the payment screen, select the payment method from the dropdown list of the 'payment' field. Please email the permit technicians at TigardBuildingPermits@tigard-or.gov once the fees are paid so that we can issue the permit and make it available for pick up. Please note that we must have the licensed contractor information prior to permit issuance. Please email this information to TigardBuildingPermits@tigard-or.gov at your earliest convenience. After the permit is issued, and once erosion control measures are in place, inspections can be scheduled online at http://inspections.tigard-or.gov/WebOnlinelnspections by searching for the permit record number. Please see below for instructions regarding demolition permits. o Inspection Process: NO demolition work can commence until a demolition permit has been issued and an erosion control inspection has passed inspection. • Schedule inspections in order listed—each inspection must PASS before scheduling the next inspection: • 750 Initial erosion control • 798 Final erosion control • 299 Final building inspection 2 ■ If dwelling is on septic system, a pump/fill receipt is required prior to final demolition inspection. • Demolition permit must pass all inspections and permit must be closed prior to issuance of new construction permit in order to receive credits towards system development charges (SDCs)for transportation, parks and sanitary sewer(if on public sewer system). Thank you. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hal► Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: Dianna Ornelas Sent: Friday, February 26, 2021 1:40 PM To: Eric Evans<eric@emeriodesign.com> Cc: Pam Boyd <pam@emeriodesign.com> Subject: RE: Bull Mountain Summit demo Hi Eric, Thank you for confirming the correct valuation. The submitted amount seemed excessive from our experience. We will let you know as soon as the permits are ready to issue. Have a great weekend! Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 3 Dianna Ornelas From: UB Online Sent: Thursday, February 25, 2021 10:04 AM To: #Building Permit Technicians Subject: FW: Bull Mountain Rd Properties Follow Up Flag: Follow up Flag Status: Completed Categories: Dianna The properties on Bull Mountain do not have sewer services. Kind Regards, Jill (she/her/hers) „1 A W Jill N0F'MO Gas of AN)tk r City of Tigard-Utility Billing Senior Accounting Asst T°$(.Ai;9:) (888)826-7211 Payments (503)718-2460 UB Main jiflb@trgard-origov (503)718-2494 13125 SW Hall Blvd. Tigard, OR 97223 From:Tanya Baccay<BaccayT@CleanWaterServices.org> Sent:Thursday, February 25, 2021 9:29 AM To: UB Online<UBOnlinepay@tigard-or.gov> Subject: Bull Mountain Rd Properties Hello Jill, Both addresses below do not have sanitary sewer permits on file with CWS. CWS has been billing both accounts for surface water management only. 15345 SW Bull Mountain Rd 15395 SW Bull Mountain Rd Please let me know if there is anything else I can assist with. Thank you, Tanya Baccayl Customer Service Clean Water Services I Business Services 2550 SW Hillsboro Hwyj Hillsboro OR 97123 i 0 503.681.4400 I f 503.681.4436 engage news I facebook I twitter DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." • 2 Pam Boyd From: #Building Permit Technicians <TigardBuildingPermits@tigard-or.gov> Sent: Thursday, January 14, 2021 3:27 PM To: Pam Boyd Cc: #Building Permit Technicians Subject: RE: Bull Mountain Summit demo Attachments: BU P_RES_PermitApp.pdf [External Sender] Hello Pam, Thank you for contacting us regarding the demolition work for this project. I understand that there are(2) residential dwellings to be demolished for this subdivision at 15345 and 15395 SW Bull Mountain Rd. For each lot,we will need the following: • Completed permit application form (see attached). • (2) copies of a site plan, drawn to scale, no larger than 11x17 that includes the footprint and sf each structure to be demolished, utility locations,erosion control measures,tree protection measures, if applicable, etc. See Page 2 of application for site plan requirements. • In the description section of the permit application, please indicate if the dwelling is on septic or public sewer system. These demolition permits must be finaled prior to issuance of new construction permits in order to receive SDC credits for transportation, parks, sanitary sewer(if applicable) and water meters. The demo credits will be applied to the first two new construction submittals. Please be sure to write in the description of these applications that'demo credits apply'. Please allow 4-8 weeks to process the demolition permits and the permit technicians will contact you as soon as the permits are ready and with instructions to pay fees online. Thank you and please let me know if you have any questions. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: Pam Boyd <pam@emeriodesign.com> Sent:Thursday,January 14, 2021 1:23 PM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: Bull Mountain Summit demo Thank you for your time and help. 1