Loading...
Report OFFICE COPY 1‘402020 -dp5n_Ill cP -(-mil 1 l31 Vd ` ,' iv Cascade Radon, Inc. Plan Review Cover Sheet p... C : V D Job# 20-0072S.R1 d5 21120 Work Description: CITY OF _. l AF D Active sub-soil depressurization radon mitigation systems DIELOING ek,i mON for existing apartment building. Job address: Community Building Village at Washington Square Apartments 11157 SW Hall Blvd. Tigard, Oregon 97223 Owners: Name: Community Partners for Affordable Housing Address: 6380 SW Capitol Highway Portland, Oregon 97239 Contact: Cameron Little /Asset Manager Telephone : 503-481-4186 Email: -egon_o rig Design and Contractor: Cascade Radon, Inc. 12839 NE Airport Way Portland, OR 97230 503-421-4813 u1iiceiaicascaderadon.com CCB# 180537 Metro License# 10252 Description: Multifamily Occupancy Building footprint: No changes proposed Open Yard Area: No changes proposed Approximate coverage per system/unit: 750 sq.ft. Estimated Cost of Work: $1,500.00 Active Sub-Soil / Sub-Slab Depressurization (ASD) General Installation Notes: 1. System(s) to be Active Sub-Soil/Sub-Slab Depressurization (ASD). 2. All installations to comply with EPA protocols. 3. Exhaust fan(s) to be located so to be assessable for installation, maintenance, and future replacement, and in a vertical run of vent pipe. 4. More than one system may be needed for the building. 5. Typical fan specs: Continuously running electric, inline duct exhaust fan(s) shall be used. 21W-150W, 60 hz, 115V, 1.5 amps, 60 cycle. 6. Vent piping shall be schedule-40 PVC or ABS, with a minimum 3-inch diameter. 7. Vent termination to be a minimum of 12 inches above the roof line/eave, as well as 2 feet above and/or 10 horizontally from any intake into living space. 8. All vent pipe joints/connections to be sealed and air-tight. 9. Vent pipe shall not have low points, and shall be sloped so as to allow condensate within pipes to flow back to the sub-soil suction point(s). 10. Electrical disconnect for any exhaust fan shall be located within sight of the fan unit. Electrical power supply for any fan unit to be drawn from un-switched building power. 11. Provide proper flashing at all roof penetrations. 12. When reasonably possible, a manometer(air pressure gauge) shall be installed on or near the negative side of the vent system, and shall be a visible and/or audible mechanism that is simple to read and interpret. 13. All penetrations through concrete slab flooring, or concrete perimeter foundations, whall be sealed as is reasonable. 14. All vent pipes penetrating through fire-rated walls and ceilings shall have a properly rated fire collar and/or equivalent. 15. All system components to be adequately secured: vent pipe every 8 feet vertically (min), and every 4 feet horizontally (min). 16. Systems shall be clearly labeled "Radon Reduction System" or the like. System shall also be labeled as to: a. Dated activated. b. Installers name. c. Information on how to contact installer. SCREENED EXHAUST L ROOF FLASHING \ Z ROOF AS PER PLAN §2 Y. w. AU G 2 5 2020 �� CifYOt- T1 ,I.t� ;- BRACE /i`�/ I INLINE DUCT FAN AS PER SPECS f/// / ___ATTIC LT�� FERNCO CONNECTOR 4( 110-VOLT WIRING 1 110V ELECTRICAL DISCONNECT 7-FaLOCATION.TO BE LOCATED IIAIRFLOW--• // WITHIN E FEET OF FAN i- ¢ . A STRAPPING(OS OTHER SUPPORT)TO SUPPORT PIPING WEIGHT SYSTEM FAILURE WARNING AS PER SPECS ABS OR PVC T-FITTING, STRAPPING(OR OTHER 3.-\-61111.1.M1.11111111.10.111.111r CEMENTED TIGHTEN TO SUPPORT)TO SUPPORT PIPING ADJOINING PIPE WEIGHT JOIST PER WALL TYPE EMI i AIRFLOW I llINIONIMMIIIMIIIIMMENINIIIMMII- 1-HOUR FIRE BARRIER SO THAT CONDENSATE DRAINS TO @ ALL RATED SUCTION POINT,PIPING SMALL PENETRATIONS HAVE NO LOW POINT. 3'DIA.SCHEDULE-40 VENT PIPE,TYP. ppp SEAUCAULK PIPE PENETRATION.TYP. FLOOR PER PLAN EXCAVATED SUCTION POINT 2 BACKFILL SUMP PITWTM I/r CLEAN --1-11T 4 GRAVEL OR THE LIKE. ADEQUATELY SECURE VENT PIPEwainimmilis . .. :. ,...:u ' Wr �I II � L-fll III III III 1�1-11 III Ilj 11=111E111-III-11 H 1-111E1111 = 1= Ell _ -I 1 I TI-I��II111=1I 11 I-I 11_111=1 11111E11 1Ell-11II I-II I II I-II I I 1 I 1- .-,:.i•:., {. ._.. --: `. I1111111 I�I11-III II=11,7 II I IIII'll I1II III 1i hI 1 I�`I 11-11 II ACTIVE SOIL DEPRESSURIZATION (ASD) SCHEMATIC / NTS Product Information Firestop Collar - (CP 643N) a\ 1 Product description A ready-to-use firestop collar,made of a galvanized steel housing and intumescent inserts for firestopping combustible pipes Product features Ready-to-use collar - /7 ��ii : <. �r, No construction required , Fast installation time Adjustable mounting tabs .am°°° _,.., Low profile for tight installations --'.m. Areas of application %% Firestopping combustible pipes up to 6"diameter in penetrations Technical Data CP 643N through fire walls and floors materials: Pipe Collar Collar No.of Suitable for the following pipeoutside outside Height hooks and PVC,CPVC,ABS,PVDF,PP and FRPP Description dia(in.) dia.(in.) (In.) fasteners For use with CP 643-50/1.5"N 1.4-2.0 2.8 0.9 2 Concrete,masonry,wood floor and gypsum wall assemblies CP 643-63/2"N 2.0-2.5 3.4 1.3 2 Wall and floor assemblies rated up to 4 hours CP 643-90/3^N 2.6-3.6 4.9 1.7 3 Types of installation CP 643110/4"N 3.6-4.5 6.0 1.9 3 CP 643-160/6"N 6.6 9.8 1.9 4 Wall:two collars,one on each side Temperature resistance -40°F to 140°F(-40°C to 60°C) Floor.one collar on underside(bottom) Intumescent activation Approx.392°F(200°C) Example Expansion ratio(unrestricted) Up to 1:10 Waste water pipes Tested In accordance with Fresh water pipes •UL 1479 •ASTM E 814 •ASTM G21 `sm., FIRESTOP DEVICE LJ 1 FOR USE IN THROUGH-PENETRATION L• FIRESTOP SYSTEMS imcr egtwxua I �i� SEE UL FIRE RESISTANCE DIRECTORY APPROVED Ncn hmysmnmmynide onm. 5N76 FEC'k aa•tlemar of He luhnmS Capmrsbv Installation instructions for CP 643N Notice Application of firestop system 5. Fastening the CP 643N Firestop Collar. Only when • Before handling,read Material Safety Data Sheet and 2. Seal the opening if required.Gaps may be closed fastened properly can CP 643N offer protection product label for safe usage and health information. with FS-ONE.The approved methods vary and are against fire. • Instructions below are general guidelines—always given in the specific UL system. a. Mark the fastening points. refer to the applicable drawing in the UL Fire 3. Close the CP 643N Firestop Collar.Place the b. Drill holes with a Hitti rotary hammer drill(i.e. Resistance Directory or Hilti Firestop Systems Guide CP 643N Firestop Collar around the plastic pipe TE 4-A18)or,depending on base material,fasten for complete installation information and lock the closure by applying firm pressure until using Hitti powder-actuated tool. Opening it latches. c. To secure the CP 643N Firestop Collar,use Hitti 1. Clean the plastic pipes.Expansion of the 4. Attach fastening hooks.The fastening hooks can anchors/fasteners. intumescent material during a fire acts to close the be attached to various points on the metal housing. This allows the fasteningpointsd. For maintenance reasons,a penetration can be plastic pipe.Very dirty pipes(le:with remains of to be made to suit permanently marked with an identification plate and mortar)may lead to a delay in this closing action, the space available in each case.The hooks must fastened in a visible position next to the seal. Soiled plastic pipes should,therefore,be cleaned in be positioned as symmetrically as possible.The the area where the CP 643N Firestop Collar is to be required number of fastening hooks is indicated on Not for use installed, the packaging. • With metal pipes • In highly corrosive surroundings • r( y With unapproved anchors fasteners - .:. ,I'•��, rO tilr`1 4� Storage ,0 • Store only in the original packaging in a location Ar :AP. , 1� protected from moisture t.Clean plastic pipe. 2.Close remaining gap to 3.Clone holies 4.Attach fastening hooks. 5.Fasten collar and provide smoke and gas identification plate resistant seal. Ir required). - Hilti Firestop Saving lives through innovation and education Hilti. Outperform. Outlast. Hilti,Inc.(U.S.)1-800-879-8000•www.ts.hlfti.com•en espanol 1-800-879-5000•Hitti Firestop Systems Guide 1• Installation and Operation Manual Manuel d'installation et d'operation Rn2EC / Rn4EC Infine EC Radon Fan • Ventlateur pour radon en ligne EC PARTS IN THE RCA 111n2ECI PARIS IN THE ROA Illn4ECI •r" I L1.1 2 II:cLal PIECES DANS LA ROITE IRo2ECI PIECES PANS LA BONI lAa4ECI ..7 o " —1..at CC)USHVI CVNTIRED Ro4EC izt.73 STER— THIS PP7i2C:— ". El INCREASi YOUR PRODZ:f IlliF;ANTYE Ar :TXTRA . • Dfl.fanteCh.El.: O. Al • fantech Ilaited State!:-• Canada • a 5,,,5ter,?.-r