Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
ril tk\C11 Page No. 2 CASE HISTORY FOR CASE NO.: MST96-0082 v\ 0 SECURITY CAPITAL PACIFIC TRUST 15161 SW ROYALTY PKWY Unit: F 07/11/97 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By ---- --- -------- --- MSTD796 Electrical Final / / / / 06/27/97 INSPECTION TERMINATED, TOO MANY FAIL BRP 06/27/97 J*H UNCORRECTED ITEMS. 1. Panel cover F-18 not cleaned. 2. Sheetrock around sw in janitor closet to be patched, 370-21 NEC. 3. Inspection terminated due to previous corrections not being done. Be sure flex at water heaters cannot be used as a clothes line. MSTD797 Plumb Final / / / / 06/07/97 CALL FOR REINSPECTION: FAIL RAB 06/07/97 J*H 1. F12-Ptrap on lay leaking. F21-dishwasher not anchored, F24-lav strainer plugged. F02-locked, need access for inspection, F05-hot & cold water reversed at bathtub. Mb-hot & cold water reversed at bathtub, F16- hot & cold water reversed at bathtub.F17-hot & cold water reversed at bathtub. F28-hot & cold water reversed at bathtub. F24, F26, F37, F35 - All bathtubs have hot & cold reversed. MSTD797 Plumb Final / / / / 06/19/97 PASS RAB 06/20/97 J*H MSTD798 Mechanical Final / / / / 06/16/97 PASS TLP 07/10/97 RB piV<-14.Th \ OV1-1 /1)T--)/(461/ (1- \ • k)VLI a �r \17 Page No. 1 CASE HISTORY FOR CASE NO.: MST96-0082 SECURITY CAPITAL PACIFIC TRUST 15161 SW ROYALTY PKWY Unit: F 07/11/97 Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd Code Sent Done Done Date By ---- --- -------- --- MSTA026 Plans approved by Plans Exmr / / / / 04/01/96 PASS MS 04/01/96 MRS MSTA780 <<REINSPECTION>> / / / / 06/12/97 reinspection fee accessed 25 dollars to PAID MS 06/27/97 J*H be paid paid on 6/18/97 see other reinspection action MSTB008 Permit created / / / / 05/03/96 05/03/96 BT2 MSTB026 Plans approved by Plans Exmr / / / / 03/20/96 PASS MJR 03/20/96 MJR MSTB026 Plans approved by Plans Exmr 05/03/96 / / 06/04/96 JHF 06/05/96 JHF MSTB030 Reviewed plans routed to DSTS / / / / 03/20/96 letter attached YES MJR 03/20/96 MJR MSTB030 Reviewed plans routed to DSTS 05/03/96 / / 06/04/96 hold for receipt of owners two spl insp APPR JHF 06/05/96 JHF forms MSTB090 (F) Ready to issue / / / / 08/05/96 PASS JMH 08/05/96 J*H MSTB098 (F) Issue combination permit / / / / 08/22/96 PAID JMH 08/22/96 J*H MSTB705 Footing Insp / / / / / / PASS 07/10/97 RB MSTB706 Foundation Insp / / / / / / PASS 07/10/97 RB MSTB708 Erosion Control / / / / / / PASS 07/10/97 RB MSTB709 Wtr Proofing Bsm't Walls / / / / / / PASS 07/10/97 RB MSTB710 Post/Beam Structural / / / / 12/02/96 FAIL TLP 12/26/96 BT2 MSTB711 Post/Beam Mechanical / / / / / / PASS 07/10/97 RB MSTB712 Plm/Underfloor / / / / 10/08/96 APP GS 10/08/96 GES MSTB713 Crawl Drain / / / / / / PASS 07/10/97 RB MSTB714 Ftg Drain Bsm't Walls / / / / 10/08/96 APP GS 10/08/96 GES MSTB715 Slab Insp / / / / / / PASS 07/10/97 RB MSTB724 Electrical Rough-in / / / / 03/11/97 PASS MJR 03/12/97 MJR MSTB725 Mechanical Insp / / / / 03/17/97 PASS TLP 03/17/97 TLP MSTB727 Plumbing Top Out / / / / 03/13/97 PASS TLP 03/17/97 TLP MSTB730 Framing Insp / / / / 03/17/97 PASS TLP 03/17/97 TLP MSTB745 Insulation Insp / / / / / / PASS 07/10/97 RB MSTB750 Shear Wall Insp / / / / 03/11/97 PASS TLP 03/17/97 TLP MSTB755 Firewall Insp / / / / / / PASS 07/10/97 RB MSTB760 Gyp Board Insp / / / / 04/04/97 PASS TLP 04/07/97 TLP MSTB779 Rain Drain Insp / / / / 10/08/96 APP GS 10/08/96 GES MSTB789 Smoke Detector / / / / 06/16/97 PASS TLP 07/10/97 RB MSTB790 Fire Alarm Insp / / / / 06/16/97 PASS TLP 07/10/97 RB MSTB791 <<REINSPECTION>> / / / / 06/18/97 $25.00 paid - receipt 97-296140 PAID 06/18/97 J*H MSTB799 Building Final / / / / 06/16/ OK TO OCCUPY PASS TLP 07/10/97 RB MSTD095 Issue plumbing signature form / / / / 04/23/97 REC'D SIGN PLM FORM PASS JT 04/23/97 RB MSTD097 Issue Electric Signature Form / / / / 04/28/97 REC'D SIGN ELEC FORM PASS JT 04/28/97 RB