PFI2021-00053 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12021-00053
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/11/2021
Parcel: SEG3249
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: TWO & CWS Potholes
Project Description: Investigate potholes in TVWD&CWS facilities for ODOT project
Class of Work: FEES
Description Date Amount
Type 1 -Utilities(gas, electric, data) PFI Permit Fee 02/08/2021 $300.00
Total S300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
ERIC GEORGE
PHONE: 9712977540
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12021-00053
Tvae: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02 -WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met)
and 503-431-2345 (Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.) before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m.unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13- DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary,as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Trent Brickey> at
<971-228-9269>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI—Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22- DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23- MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two (2) persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI—Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s)from the owner for each private property disturbed by construction
activity.
PFI Utilities 28 -AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
City of Tigard RECEIVEDFEB 0 3 2021 PFI#:
s ' ENGINEERING DEPARTMENT
• . Public Facilities I i'dYr ', , Qt (PFI) Permit
PROJECT INFORMATION TYPE OF WORK
SW 95th Ave, SW Shady Ln Potholes
Project name: � TYPE 1—Franchise Utility Work
Brief description of project: Investigative Potholes performed byNWN,PGE, or utility
of TVWD & CWS Facilities on behalf of ODOT acv
❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
for the Hwy 217 Project Work performed for the purpose of.
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available): SW 95th Aver SW Shady Ln main line rap
North & South side of Hwy 217 ❑ TYPE 3—Full Scale Development Work
y performed with land use approval which
at includes any of the following.
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Name: TVWD • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 1850 SW 170th Ave water service area
City/state: Beaverton/OR Zip: 97003 ❑ TYPE 4—Small Cell Technology
Phone:
503-848-3000 ❑ TYPE 5—Tigard Triangle
Email: Eric.George@tvwd.org Phone: 971-297-7540 NOTE: Type 1 and 2 applications may be
Contact name: Eric George emailed to rMermitsatigard-or.gov.
Phone: Email:
CONTRACTOR INFORMATION ❑ Same as applicant
Name: VacX CCB Number: 75124
Mailingaddress: PO Box 70345 City/State: Springfield/OR Zip: 97475
Phone: 541-505-5074 Email: jj@vacx.com
ENGINEER INFORMATION
Name: Dan Ebbighausen, PE
Mailingaddress: 101 SW Main St. suite 1000 City/State: Portland/OR Zip: 97204
Phone: 503-475-3647 Email: dan.ebbighausen@murraysmith.us
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ 51000 (est. ) (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes XNo Case number:
City of Tigard • 13125 SW Hall Blvd • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 Page 1 of 4
APPLICANTS
NOTE: Person specified as `Applicant" shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
en,,;c O"" e, Eric George 2/2/2021
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: Permit fee:/[3L8.Gb Received by: Date: /
Approved by: Y Date: Z/Yl2OZ/ Notified by: Date:ifrtl
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 2 of 4
Q sw " s "
Edge of Pavement
IDitch ----
Streetlight , —.—•—•—•—•—•— —r—.—
* 1 Rdft .
' a
� I '
-rapos d"Saurt-mr--
� I
Yy I Existing House
I I I Existing 1
.• it ' Driveway
J I u'�
a� ,+ V.
o
i � c Existing Shop j
Powerpole I I I 1
o • o
I la 95' 1
t7 7ropeVLne—-—-—-—-—-
I I Fire
ant(FH
� � I
Scale: '1"=30'
� I I
TYPE I
� I I
' I I
� � I
1 TYPE 2:
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. ' Tigard Oregon 97223 ' uwvwutigard-or.gov • 503-718-2421 • Page 4 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 101/o of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR ONLY • ' STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE I-3: DETAILED SUBMITTAL
REQUIREMENTS
CHECKLIST
Does applicant have aright-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit ❑ Site Address
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineers Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4
Exhibit A
CWS Potholes
sec. 15 & 22, T. 1 5, R.1 W, W.M.
j Forrian Nwes S
\ She& te
ef 0020 CD1D
✓All—
24O
33 4 e I$ ria�-r
Sa v IS f
/ 1 X11
r
_ - —
e-
12 -3-a-3, I
12'-MB'-B ' I7'-119' 31' 2 �Il'ne I7--1!' REAV W-IGARD (No.1'41__ SJ2_VlBY7-1-tE1
6'
I
21 75
11'-19, 2 1 1 2 _ -
21 y!'6 12 48 Il /r18
_-
35
_ 16 ✓r
!r-w'
I
1 ROT. .i- u, Y-R.+- ?'ll•7r' /
D2'IIDe AA .tgc 34-[a•c
IN ! .a atilt Rallroad7siMet Westside Excpiress Service
Fro•r cxsT�RJB/a , / ,. Soul
.. / ._..___. ._..., O
36 g
D - i e - 'lit{`_---' .._kp / � •._ - N
ON _ __ r ro �- CWS MH WO
_ — RAR' / ip N JUNCTIONID
_crcENo—_- - yY� -------J CWS MH 88673
(hems/n legend may no/appear on plans) 1'/
Remow Tarrhnk: p,' i JUNCTIONID 11780 In
i1°""r""nhO/e
if i BRIDGE ABUTMENT
Cons,manhok o POTHOLE EACH AREA
Remaw iWe.
, 1.
Cl,w,.ler 0 , r� /; r (�E,Q PRO f OREGON DEPARTMENT
marcra/b„d/rn, GIN OF TRANSPORTATION
Coeur.pi0e •�• / t/s�..ye� I 4V b" ,
%u9 ane abarreon p/pe: >•+ra6 , l3?F' t � Q' 6
gwd/u/w•n ewd,/ape: . r k, OR217:OR10-OR99W
,/ BEAVERTON-TIGARD HIGHWAY
/. Cmrm dralmvf s,Nehre nm a/ewlions mm Wa , j + 'p, ww.WGTONCOuun
Amish grade solace ekwfbn pdor m msa/larlon. , p
r 0.2
1.See tralfrc sheret fof,l9na/arM d/vm/narlon ueF/tie, / / r Ode o^It"R�esW .ne.aru,00,w
nor,hown. ' / *1y E R. P osl,e aunraaw.e •:xw.M.e.uw+r
RENEWS:12-31-2021 DRAINAGE&IMLRIES `CO2C
H-K18841ds_01Agn::CO2C 6126120201:26:45 eM hwir66y rvyay< Read.:O' Scale:1-=100'
Sec. 22, T. 1 S, R.1 W, W.M.
Fol
Mrrmmllatlon Nores See
Meer COlD
J Y—.
SS-02 _ _____
-
CWS SS EA. _
���WedaM 0
CSP Edgeld
N 1`
30852 Evil.arrnl emrt_. fir- o2:.
C.Line • � ��
BEAVER ON_71
:
CO"Line 3 4 6 6 CARD -
1 � 2 o.
- ------
N r--
7.7
- _ 16 v 10 F
12 13 t5
_ 1
II 0
—_ 7CWS 36'-131'
- 5outliemPadflc 0.aIlroLd'frlMel Westside Express Sevice
JUNCTIONID 11778 Is.
Cw
JUNCTIONID11779 POTHOLE o 9
CW3 SS
R.R.R/W Cl 601,CSP
N a Edgeld 30791
w o
to
LEGEND
(hems in hgeeM may nae appear on plans)
Remove manhole-
Adjwt olohok:
Const..,hot, OO PR Of OREGON DEPARTMENT
Remove iMef ■ •°
AdjusnMer SK. VS GIN OF TRANSPORTATION F;
Const.infer • 7)O ie-
lMRtwfoo dilrh' ® ha A
const.v/pe
N.gandahaodooplve.' avaa
DR237:
fte .Neneod.km 4 BEAV -7lGmDiwAm
AY
�Tt WASHNGTONry
/. Confirm dminage strrmture rim e{evavoo,with roadway i p Ze 0
finish grade surface ekvatbn Poor ro insm/iaripn \ Oar o+Vr*,w„Y a,aoE ��P,W eYtMNe
L See mrrc sheen for s/goal and U/um{nat/Pn ulllMes %
not Sh... RENEWS:12-31-2021 SMEfI NJ.
DRAINAGE L UtIL1T1Es coac
N_Kl9941-dr-0l.dgn::CO3C 6126/20201:26:S7PM hwy S, n.1.r U.ar enT� Rotxlon:0' Scaler 1--100'
•�\ \ 1 : SEC. 35, T. 1 5, R.1W, W.M. ?7
t
20
it
r
S/opet aad utN ties�l i ''.•�••l ,�?`'J�_sWll�.
CWS MH \ '` ,>,'
P ;
[J
UNC 9451
Ca
aJ. .•,, ` „B,.Line
- N4 CO .Eam or nape
B Line _ CREENBU n', w_w
RC RD.
5. - NN.N0 — -
� Hl
. x
.0 N
a
9S 1'
CWS 30"
POTHOLE Ine EdgelD 30359
tP N
VERTON- ARD 111V1'.IOR
�' t BEA58 gg
53 S ICP a d'-7T ... -
_ 12•_ 71' ___ _ �.. y--•N_ 1T lo' v !a'-]T
/T-799'
-
i
"GCS"Line
X17 10 \ .•' i 1 . _ _ •
r o• 1
S4 e•
21
G �••
D4"LINE'.. it n..._.. v
I , LPI
Z1 w
n 'ow IT
Y
/WS MH @ Ln
r
JUNCTIONID 10288
„ 1
• \d ,- ,' � ,voce
C'•S �; _ 1. CarJrrm do/nage structure nm elemlons wish roadway
F�
ft h grade s..Y ce elevation prior ro/mrallation.
This Engineer responslDle for This Engineer responslbie for
I Soelhhoend project design Nanhboudid project design 7. See traffic sheets for s/9ru/and d/umDrallon utlli!/es
+rrlh t41 ' which is denoted Dy'S'setles Sa which kdenotetl hy'N"series N4 nnrsbawn
cMy, Cn r'' construdbn notes marketl thus: wnstructbn notes marked thus:
r—'. t,, 888 SW 5th Avenue, u e 117a�/,
LEGEND \ v\S��NO INE GIN P 0Port1and,OR 3.25..90LO20/f/U IUI "
"GB"Line �4 //pa2�aa8
tlhms fn/egen0 moy not aopav on pans! � � �' � � F' � J^•• `
Rpnia.Y ngnlple: 1 4 / 93
Calsimannder o '' -I I � A�Q.��# g C�, OR217:OR10-01199WSEC.
Remae irNeh p( __ _ >. I , 4a BEAVERTON-TIGARD HIGHWAY
Ad est lnkh
Const.inrete • ��e `� I� 'P / el
MNSHINCTbn counm
InlillroKm ditch' Z .9 / �(: o,mr x>.,m ne.wp R—o.utw:o.Cmsd.pfpe -�. A. gR.WEB n.n., t"rtlel/v"se n.w..:Hors no,e xe
Plug and otondonµpa: .e..♦I
Pored ceewt and slopb 4 T� I DRAINAGE AND UTILRIES tnm no.
RENEW5:12-31-2019 RENEW5:06-30-2022 C12C
H_K18841 dr_09Agn::C1 2C 71912020 10:33:13 AM ak.webster "re ivuvatswon r r Rotation:321.946' Scale:I'=100'
Exhibit B
TVWD Potholes
\ sec. 35, T. 1 5, R.1 W, W.M. ??V—?Zz
\a
Feral.Ease. V j' s'�o., ' •"..qs r /
Sb es and IfiWases
r;
Zv
, 1 � -' A rli :,'��� � i•�� as .�'�
�,.
ros "B"Line "��. Lq
cP F/W flpp.Fere.E. -Or�ina e
"
/ B Line _
URC RI). 11.29 1 "' rRw!r
EbNN C0NN.N0.4
, N -
t
C
"
-- 12-IS'
._ \�\
��EENg o' 16, "Line
0 12mmO'
v ftEAVERTON-TIGARD HWY.02217)
S3. s7 jr-271' a P�6._n. I. -w.., lz-Iz µ•—
53 72".._219' �. ca' 19�27 /
y �r' 7I _
/I-299' I
______---------w_ 56 � - 1 fib'.•
"GCS'Line
611{ 1 !P " �a
as
ON 444444
fie, More
S 9 CT a 1. Confirm drainage svucmre rim a/ewrians w/[h roadway
• '�p !loth grade surface elevation prior to installation.
Is Enoreerresponsbe far This EconeerresPonslbe tar
ulhbountl project design Northbound pmjec[Aesigr 2.See tratRr sheets hr slgnalarM lllrol donut//Rles
hichlsdenotedby5'serlesSa which lsdenoted by'N'series N6 not 5h~.
Pr>6> TGF estruchon notes marked thus: construction notes ma Med thus:
- 97
S - T♦ - ,d'y ,.,. .� BBB SW 5th Avenue,Suite 1170
Portland• ac y,o$ 4 t, 9 \5.��RED PNOfff Q.�PNOf�j' P 503.22 9010204
# w �N nn-- y w �e murraysmlth�
�I
lk
Ile r rov
5 I" OR217:0R10-0R99W SEC.
Q
tp
BAVEBTON-T
IGARD HIGHWAY
wn5wwMMCOUNTY
a•Jp� 0•}$�0 �.0 B f. a.t'• n7E .rte.. � 820 ��L / )07'�� uww: n+mmsa.nan a.M.„.:onauMrw"a w
AfA.Bp` R.WE9S o,.iw: rewnaaw.e. a,M..":*awsMua Ma
,� `rFs s REN EWS. 12-31-2019 RENEWS:06-30-2022 DRAINAGE AND UTILITIES C12C
nNPL A£CIRtleC a^fllMdr
Rotadpn:321.946' Scak:l"=100'
s