Loading...
Plans RECEIVED IAN 2.02.1 CITY OF TIGARD Building Plans for City of Tigard Building Permit Application BUILDING DIVISION Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987@gmail.com Contractor: Jon Erickson, 503-730-9220 jon.evenjobs@gmail.com CCB 162397 Scope of Work— Repair Decks .OFFICE COPY • Replace perimeter joists with PT • Repair joist and soffit dry rot • CITY OF TIGARD,w REVIEWED FOR CODE COMPLIANCE • Replace 42" guardrail and infill to comply with Approved: ] IBC multi-family code OTC: [ I Permit#: t trr1r�� ^ o n n a7 Address: j s-y Al �S ) L t_J c Suite #: I By: Date: j —a -a I File Name: Fountains Deck Permit Plans REVISED.pptx • VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM 3/19/20 Fountains at Summerfield - Deck Building Plans REQUIRING THE CORRECTION 1 OF ERRORS. OSSC 105.4 Typical Deck Construction and Size — 102 SF E— > Brick Cola 114.5" 15x Imbedded 6x6 PT A L] r n 4x4 PT Posts 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG ><-->< Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table I 2304.9.1-29 Rimjoist attached to „ „ Blocking supports Simpson 2 x8 Joists 16 OC ❑ � Tension Ties DTT2Z. Two lateral joists with DTT2Z brackets required for Three 16D 3-1/2"n HDG —�> I posts in this position. See Beam — 6 x10 Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty ^ Tension Ties— page 337 Code—Table ai N 2304.9.1-29 House — Brick exterior 43" Scale— 12"/increment V 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" VResurfacing material milk 3/4" exterior plywood decking Y N 0 1C E co x N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing 77- %" plywood soffit Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z Attach to lateral joist with I 8 SDS 1.5" screws Yz" x 6" Machine Bolt DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers Code for multi-family deck oo 'o guardrails. E Refer to attached Simpson catalog- Deck Tension Ties Lateral Joist page 337 N��������������������� Also refer to Simpson code compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale — 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive A ''' Wide Screw SDWS 4", IRailing 1 2 x 4 TKC I k O 2 3/8" TL. Two per Cap Rail —Trex eta,/ end, three in mid span 1„ x 5.5" attached to Railing with exterior —IIIIIIII _ adhesive. ^. Railing Support MI I v 2x4TKC . o a 00 Attached to 1— a Ni Railing and X Installation of Posts with balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum V 2.75" space balaster 3/4" x 32". Spacing 3.75" DecKorator Scale 1" increments • • CodeCompliance Research Report IIIIIIIIIIIII CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5