Loading...
Plans • Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987@jgmail.com Contractor: Jon Erickson, 503-730-9220 ion.evenlobs@gmail.com CCB 162397 • OFFICE COPY CITY OF TIGARD.. Scope of Work— Repair Decks REVIEWED FOR CODE COMPLIANCE • Replace perimeter joists with PT Approved; \t,/ • Repair joist and soffit dry rot OTC: [ • • Replace 42" guardrail and infill to comply with Permit#: tf a o1a ) nO o a3 Address: ,(s.-"%s" )1(4 IBC multi-family code Suite #: c CJ By: j Date: l •A File Name: Fountains Deck Permit Plans REVISED.pptx VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS.OSSC 105.4 3/19/20 Fountains at Summerfield - Deck Building Plans 1 Typical Deck Construction and Size — 102 SF < > Brick Col. 114.5" isxiis E� Imbedded 6x6 PT �� E -� D <� 4x4 PT Posts A < 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG < 43" >< 15" >< ) Ref: 2014 Oregon Structural 56.5" Specialty Code—Table i 2304.9.1-29 2"x8" Joists 16" OC Blocking supports Simpson Rim joist attached to C Tension Ties DTT2Z. Two lateral joists with / DTT2Z brackets required for Three 16D 3-1/2"n HDG -----> posts in this position. See Beam — 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty r` Tension Ties — page 337 Code—Table rn csi 2304.9.1-29 House —Brick exterior C < 43" > Li."'" ,- Scale— 12"/increment V f _I 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section MC Posts—4x4 PT Flashing 2" x 3" VResurfacing material mow. 3/4" exterior plywood decking Y U, o E Co x rV Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by %" extension. Pre-paint before adding flashing %" plywood soffit AZ Scale — 1" increment 1 . 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT • Simpson DDT2Z Attach to lateral joist with 8 SDS 1.5" screws IF '/:" x 6" Machine Bolt DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers Code for multi-family deck 00 .o guardrails. x -i E Refer to attached Simpson catalog- Deck Tension Ties Lateral Joist page 337 Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale — 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 -- Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive A Wide Screw SDWS 4", 2 3/8" TL. Two per Railing 2 x 4 TKC Cap Rail—Trex °etas/ end, three in mid span 1" x5.5" attached to Railing with exterior adhesive. in h Railing Support TA "ryi 2x4 TKC . o a o Attached to I— a v ! Railing and X Installation of Posts with balasters and rails adhesive and per mfg installation Simpson I instructions. Strong Drive Wide Screw SDWS 4", 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum V _ 2.75" space balaster%" x 32". i Spacing 3.75" DecKorator Scale 1" increments • • CodeCompliance Research Report iiiiiiiiiiii CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5