Loading...
Plans RECEIVED JAM 1 1 2021 CITY OF TIGARD BUILDING DMSION Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987@gmail.com Contractor: Jon Erickson, 503-730-9220 jon.eveniobs@igmail.com CCB 162397 Scope of Work—Repair Decks Y • Replace perimeter joists with PT OFFICE C�P • Repair joist and soffit dry rot CITY OF TIGARD,y • Re-coat deck surface with Gaco U91 REVIEWED FOR CODE COMPLIANCE • Replace 42" guardrail and infill to comply with Approved: J . IBC multi-family code OTC: [ J Pernik Address: • ��ynaoa ► - c o J )x4 R.< sv JJ 4 i . Suite#: 3 9 Br Dade: ) =0� 8-4a File Name: Fountains Deck Permit Plans REVISED.pptx • VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION 3/19/20 Fountains at Summerfield - Deck Building Plans OF ERRORS. OSSC 105.4 1 Typical Deck Construction and Size — 102 SF < > 114.5 Imbedded 6x6 PT 4� 4x4 PT Posts A I < 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG < >< >< ) Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table i 2304.9.1-29 2"x8" Joists 16" OC Blocking supports Simpson Rim joist attached to C Tension Ties DTT2Z. Two lateral joists with / DTT2Z brackets required for Three 16D 3-1/2"n HDG —�)" posts in this position. See Beam —6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty inTension Ties—page 337 Code—Table o; N 2304.9.1-29 �' House—Brick exterior L • 43"< > Scale — 12"/increment J 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" Resurfacing material 3/4" exterior plywood decking VI U, 0 E it co N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by 3/" extension. Pre-paint before adding flashing %" plywood soffit Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts —4x4 PT Simpson DDT2Z Attach to lateral joist with 8 SDS 1.5" screws 1/2" x 6" Machine Bolt DTT2Z supports 1800 lb. HDG with nuts and ..„ tension load. Meets IBC washers Code for multi-family deck 0 'o guardrails. x r„ E Refer to attached Simpson catalog - Deck Tension Ties Lateral Joist page 337 Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-G RDRLPST17 Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts A Simpson Strong Drive Wide Screw SDWS 4", 2 3/8" TL. Two per —1 Railing 2 x 4 TKC Cap Rail—Trex . / 410/1 end, three in mid span 1111111111111 1" x5.5" / attached to Railing with exterior adhesive. N Railing Support A` 2x4 TKC . ° a oo Attached to a a Railing and x Installation of Posts with a balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive F` Wide Screw SDWS 4", 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum V _ 2.75" space balaster 3/" x 32". • « Spacing 3.75" DecKorator Scale 1" increments • 4., CodeCompliance i i i i i Research Report iiiiiiiiCCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5