Loading...
Plans RECEIVED JAN 1 1 2021 CITY OF TIGAFDD BUILDING DIVISION Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987Pgmail.com Contractor: Jon Erickson, 503-730-9220 ion.eveniobs@gmail.corn CCB 162397 Scope of Work—Repair Decks • Replace perimeter joists with PT • Repair joist and soffit dry rot OFFICE' COPY Re-coat deck surface with Gaco U91 • Replace 42" guardrail and infill to comply with - CITY OPTIGARD, IBC multi-family code REVIEWED FOR CODE COMPLIANCE Approved: eft I • - OTC: t ] Perrrdt# p„par,,3 i -o a y Address: i c3-1 8 5\.. it)Sg c-# File Name: Fountains Deck Permit Plans REVISED.pptx Suite#: ,<-,f BY: Dates VALIDITY OF PER; THE ISSUANCE OF A PERT,1 BASED ON CONSTRUCTION 3/19/20 DOCUMENTS AND OTHER Fountains at Summerfield - Deck Building Plans DATA SHALL NOT PREVENT 1 THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 • Typical Deck Construction and Size — 102 SF 114.5" �� <A Imbedded 6x6 PT 4x4 PT Posts 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table 2304.9.1-29 Blocking supports Simpson Rim joist attached to 2"x8" Joists 16" OC Tension Ties DTT2Z. Two lateral joists with DTT2Z brackets required for Three 16D 3 1 2"n HDG posts in this position. See Beam 6"x10" Sim son Wood Connection Ref: 2014 Oregon p Connectors 2018-18 Deck Structural Specialty I ^ Tension Ties—page 337 Code—Table o; 2304.9.1-29 House—Brick exterior 43" Scale— 12"/increment -J L . 3/19/20 Fountains at Summerfield - Deck Building Plans 2 1 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" / Resurfacing material 3/4" exterior plywood decking 0 E co x N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing %" plywood soffit/77 ,L' Scale — 1" increment wmmo w 3/19/20 Fountains at Summerfield - Deck Building Plans 3 t` Agairtik4,4, Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z \`\\\\\\\\\\\\`\\\\\ 1 Attach 8 SDS15 lateral screwswith 1/:" x 6" Machine Bolt HDG with nuts and DTT2Z supports 1800 lb. washers `' tension load. Meets IBC Code for multi-family deck VI 00 5 guardrails. x N E Refer to attached Simpson catalog- Deck Tension Ties Lateral Joist page 337 \ `\ Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-G RDRLPST17 Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive A Wide Screw SDWS 4", -- — Railing 2 x 4 TKC 2 3/8" TL. Two per Cap Rail —Trex �etcv end, three in mid span 1" x 5.5" attached to Railing with exterior adhesive. 1111111)117 in rs" Railing Support a 2x4 TKC . o a 0o Attached to a Ni Railing and X Installation of Posts with v balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum y _ 2.75" space balaster 3/" x 32". 0 Spacing 3.75" DecKorator Scale 1" increments • • CodeCompliance Research Report II11111111111 CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5