Loading...
Plans RECEIVED JAN 1 1 2021 CITY OF TIGARU BUILDING DIVISION Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987@gmail.com Contractor: Jon Erickson, 503-730-9220 jon.eveniobs@gmail.com CCB 162397 OFFICE COPY Scope of Work—Repair Decks CITY OF TIGARD. • Replace perimeter joists with PT REVIEWED FOR CODE COMPLIANCE • Repair joist and soffit dry rot Approved:NU ] OTC: i I • Replace 42" guardrail and infill to comply with permit#: IBC multi-family code )�c: aj'�a 1 —art() 6 Address: jam- l g S I y ,4 Suite#: c By: Dater a.. - a) File Name: Fountains Deck Permit Plans REVISED.pptx VALIDITY OF PER:. THE ISSUANCE OF A PERM BASED ON CONSTRUCTIO DOCUMENTS AND OTH� DATA SHALL NOT FRE'," !F THE CODE OFFICIAL Fr; REQUIRING THE CORPEC 3/19/20 Fountains at Summerfield - Deck Building Plans OF ERRORS. OSSC 1 Typical Deck Construction and Size — 102 SF wick Col. 114.5" 15x Imbedded 6x6 PT A �] 7 4x4 PT Posts 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG ><--->< Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table 2304.9.1-29 Blocking supports Simpson Rim joist attached to 2"x8" Joists 16" OC Tension Ties DTT2Z. Two lateral joists with Q / DTT2Z brackets required for Three 16D 3-1/2"n HDG posts in this position. See Beam 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty �+ Tension Ties — page 337 Code—Table a; csJ 2304.9.1-29 House— Brick exterior 43" Scale— 12"/increment V I J 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" VResurfacing material 3/4" exterior plywood decking .o E it oo x N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing 1/2" plywood soffit 7 Scale — 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z Attach to lateral joist with 8 SDS 1.5" screws I Y2" x 6" Machine Bolt _.. DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers ' Code for multi-family deck 0 o guardrails. N E Refer to attached Simpson ' catalog- Deck Tension Ties Lateral Joist page 337 Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale — 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts ........_.......... ..._. Simpson Strong Drive A Wide Screw SDWS 4", 2 3/8" TL. Two per Railing 2 x 4 TKC �etd�/ end, three in mid span Cap Rail —Trex 1" x 5.5" attached to Railing with exterior adhesive. �n Railing Support ., a 2x4 TKC . a o Attached to o Installation of csi Railing and Posts with v balasters and rails adhesive and 1 per mfg installation , Simpson instructions. Strong Drive Wide Screw SDWS 4", Railing Infill Railing 2 x 4 TKC 2 3/8" TL. 2.75" DecKorator aluminum V _ spacebalaster%" x 32". • • Spacing 3.75" DecKorator Scale 1" increments • • CodeCompliance Research Report iiiiiiIIlIiii CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5