Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT COMMUNITY DEVELOPMENT Permit#: FPS2021-00004 T I C.).A P p 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 1/11/2021 Parcel: 2S112DA01400 Jurisdiction: Tigard Site address: 15350 SW SEQUOIA PKWY 140 Project: Mercury Development Subdivision: 1996-048 PARTITION PLAT Lot: 2 Project Description: Fire alarm permit-Fire alarm notification system.Affidavit submitted. Contractor: POINT MONITOR CORPORATION Owner: PACIFIC REALTY ASSOCIATES 5863 LAKEVIEW BLVD STE 100 ATTN: N PIVEN LAKE OSWEGO, OR 97035 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-627-0100 PHONE: FAX: 503-627-0110 FEES Description Date Amount Specifics: Permit Fee-COM 01/11/2021 $102.20 12%State Surcharge-Building 01/11/2021 $12.26 Type of Use: COM Plan Review-Fire Life Safety-COM 01/11/2021 $40.88 Class of Work: ALT Type of Const: Info Process/Archiving-Sm$0.50(up to 01/11/2021 $0.50 Occupancy Grp: Height: ft 11x17) Stories: Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Standpipe Required: Hazard: Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Yes Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $155.84 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $0.00 Residential Square Footage: 0 Fire Alarm Valuation: $2,201.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 50 2.1987 or 1.800.332.2344. Issued By: Permittee Signature: C/N /7��` 7�iJr�ru�t""�� i Call 503.639.4175 by 7:00 a.m.for the next available inspection date. !!�� Thi ermit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Applicatit EC E I E E-1 21 Fire Protection System 1 012 OFFICE ('sr ONLY City of Tigard JAN 0 7 1021 Received b� � Permit No.FpSLUif 4e:V06Date/B' i • P13hon125e:S5W03Ha1ll8Bl4v3d9.,Tigrd:,5O03R.5997823IV OF 7IGARD Plan Re Date/Br tr OherPermiteUPZUZO W/7,A Reed tc„AI:n Inspection Line: 503.639.4175 BUILDING DIVISION Nate ed/M ley ✓�G?ll�G� Id s«Page 2kr Internet: www.tigardor.gov Notified/Method: I!1 ' Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction ❑Demolition Permit fees*are based on the value of the work performed. El Addition/alteration/replacement ❑Other: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling is)Commercial/industrial Valuation: S ElAccessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other. Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:15350 SW Sequoia Pkwy New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no. _ ld30 Project name:PCC241 Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAI.USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Fire Alarm Notification Valuation: S$2 20L00 Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER ® TENANT Number of stories: Name:PCC241 Type of construction: Address:15350 SW Sequoia Pkwy Suites 1 -140 Occupancy groups: City/State/ZIP:Tigard,OR 97224 Existing: Phone:( ) Fax:( ) New: ® APPLICANT ❑ CONTACT PERSON NOTICE Business name:Point Monitor Corp. All contractors and subcontractors are required to be Contact name:Brooke Williams licensed with the Oregon Construction Contractors Board under ORS 70] and may be required to be licensed in the Address:5863 Lakeview Blvd#100 jurisdiction in which work is being performed.If the City/State/ZIP:Lake Oswego,OR 97035 applicant is exempt from licensing,the following reasons apply: Phone:(503)627-0100 E-mail:bwilliams®pointmonitor.com CONTRACTOR BUILDING PERMIT FEES' Business name:Point Monitor Corp. (Please refer to fee rcbedafe) Address:5863 Lakeview Blvd#100 Permit fee: State surcharge(12%of permit fee): City/State/ZIP:Lake Oswego,OR 97035 FLS plan review(40%of permit fee): Phone:(503)627-0100 Fax:( ) (Due upon application submittal) CCB lic.:135901 Total permit fees: /S-V. �y Amount received: Authorized signs This permit application expires if a permit is not obtained Print name:Ben Breit Date:1/7/2021 within 180 days after it has been accepted as complete. Fee methodology set by Tri-County Building Industry Service Board. I:V3uildirp\Ptratib1FPS-Penmapp 031016.doc 4404613TC11 l02COMWEB) City of Tigard: Fire Protection Permit Checklist Page 2-Supplemental Information Describe work to be done: 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: ❑ New system Number of sprinkler heads: Number of alarm devices: 3 ® Addition or ❑ 1-10 heads: Affidavit required and ® 1-5 devices: Affidavit requited and Alteration (3) copies of sketch showing area (3) copies of sketch showing area to existing of work within building structure of work within building structure system ❑ 11+heads: Plan review required and ❑ 6+ devices: Plan review required and (3) sets of plans. (3) sets of plans. Additional description of work: Fire Alarm Notification Type of S>stem,(Complete A;AX-Pg.P. " `"''' 1e A.) Commercial Sprinkler Sprinkler Type 0 Wet ❑ Dry Additional Standpipes Information: Sprinkler Supply Line ❑ Yes ❑ No Hazard Group Density Design Area K Factor Sprinkler Project Valuation: $ B.) Type I- Hood Fire Suppression System J Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Mann Project Valuation: $ 2201 D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Sprinkler Project Square Footage: sq.ft. Fire Protection Permit Fees Project valuation subtotal (see A,B&C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review(40% of permit fee): $ TOTAL: $ C:\Users\bwilliams\Desktop\PERMIT FORMS\Fire permit-city of ngard.doc 2 RECEIVED City of Tigard JAN 0 r 2021 Permit No.: FPS20 00004- 1111 • 13125 SW Hall Blvd.,Tigard,OR 97223 A • Phone: 503.718.2439 Fax: 503.598.196B1 OF TIGARD Date Received: 01/07 7C2,/ Inspection Line: 503.639A 175 1G,1i;L. Internet: www.tigard.orgov :WILDING DIVISION By: 017Y 4F mO FIRE ALARM SYSTEM AFFIDAVIT FOR ALTERATIONS OR TENANT IMPROVEMENTS (MAXIMUM OF 5 DEVICES WITHOUT PLANS) Project Name: PCC241 Occupancy: Same Job Address: 15350 SW Sequoia Parkway Suite: _ 0 40 Contractor: Point Monitor Corp. Phone: 503-627-0100 Valuation of work: $2,201 Type of System: (check one) ❑■Required ❑Non-required (check one) DAutomatic ❑Manual ['Both Total number of devices added or moved under this permit process is 5 total per tenant space. Number of Proposed Smoke/Heat Detectors: To be Added 0.5) /To be Relocated(aux 5) Number of Proposed Manual Alarm Stations: To be Added ta,R 5> /To be Relocated h,,.,5> Number of Proposed Notification Appliances: To be Added(max 5) 3 /To be Relocated 0.5) 1 Ben Breit Oregon Construction Contractors Board No. 135901 certify the following is true and defines the scope of work for this project: a) All work complies with the current state-adopted NFPA-72 and the authority having jurisdiction. b) All notification appliances are located in accordance with the current state-adopted NFPA-72. c) Smoke/Heat detector spacing complies with current state-adopted NFPA-72 and the authority having jurisdiction. d) Exposed wiring will not be covered until inspected. e) Final approval shall be subject to on-site tests and inspections. f) Voltage drop is adequate to operate all appliances. g) Battery supplies are capable of supporting the system modifications. h) Compatibility of appliances and devices are in accordance with the FACP manufacturer's specifications. In addition, I understand the following is required: • Submit(3)copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • Electrical permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. Signature: Date: 01/07/2021 Print Name: Ben Breit 1:1BuildinglForms\FireAlannAffidavit 071514.docx Page 1 of 1