Loading...
Plans RECEIVE JAN 1 1 2021 CITY OF TIGARD BUILDING DIVISION Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987@gmail.com Contractor: Jon Erickson, 503-730-9220 jon.evenjobs@gmail.com CCB 162397 OFFICE COPY •Scope of Work— Repair Decks CITY OF TIGARD,, • Replace perimeter joists with PT REVIEWED FOR CODE COMPLIANCE • Repair joist and soffit dry rot Approved: .1"\J ] • Replace 42" guardrail and infill to comply with OTC. t IBC multi-family code Permit Address: S �� Suite#: By: Date: ) C. a File Name: Fountains Deck Permit Plans REVISED.pptx VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 3/19/20 Fountains at Summerfield - Deck Building Plans 1 Typical Deck Construction and Size — 102 SF Mick Cot. 114.5„ 15x11.5 F` Imbedded 6x6 PT an _71 n E� 4x4 PT Posts A - < 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG 43" >< 15" Ref: 2014 Oregon Structural 56.5" Specialty Code—Table 2304.9.1-29 2"x8" Joists 16" OC Blocking supports Simpson Rim joist attached to Tension Ties DTT2Z. Two lateral joists with DTT2Z brackets required for Three 16D 3-1/2"n HDG posts in this position. See Beam ^ 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty r.L2 Tension Ties— page 337 Code—Table o; rsi 2304.9.1-29 r+ House — Brick exterior L 43" Scale— 12"/increment V L_L� 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" Resurfacing material 3/4 exterior I wood decking g In 'o E it oo ry Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing %" plywood soffit Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 • Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z Attach to lateral joist with 8 SDS 1.5" screws %" x 6" Machine Bolt DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers Code for multi-family deck 00 o guardrails. E Refer to attached Simpson catalog- Deck Tension Ties ..,r. Lateral Joist page 337 _�������� Also refer to Simpson code- _- compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive A Wide Screw SDWS 4", 2 3/8" TL. Two per Railing 2 x 4 TKC Cap Rail —Trex Oet , end, three in mid span 1" x 5.5" attached to Railing with exterior adhesive. in I Railing Support .- rei 2x4TKC . a 0o Attached to a a Railing and Installation of Posts with a balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", Railing 2 x 4 TKC Railing Infill - 2 3/8"TL. DecKorator aluminum V _ 2.75" space balaster 3 " x 32". Spacing 3.75" DecKorator Scale 1" increments CodeCompliance Research Report CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5