Loading...
Plans RECEIVED JAN 1 1 2021 CITY OF TIGARD BUILDING DIVISION Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987(cagmail.com OFFICE COPY Contractor: Jon Erickson, 503-730-9220 jon.evenjobs@gmail.com CCB 162397 CITY OF TIGARD,. REVIEWED FOR CODE COMPLIANCE Approved: IN\j Scope of Work —Repair Decks OTC: i • Replace perimeter joists with PT • • Repair joist and soffit dry rot permit#: �v cZ021 ^ OOp Address: 1ss 1 s w 1 /`J. ct. • Replace 42" guardrail and infill to comply with Suite#i _r__ IBC multi-family code Bar. � Data I -s-C-2.1 VALIDITY OF PERMIT File Name: Fountains Deck Permit Plans REVISED.pptx THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 3/19/20 Fountains at Summerfield - Deck Building Plans 1 Typical Deck Construction and Size — 102 SF Brick Col. 114.5" 15x11.5 F` Imbedded 6x6 PT A ] 4x4 PT Posts 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG 43" >< 15" >< Ref: 2014 Oregon Structural 56.5" Specialty Code—Table 2304.9.1-29 Blocking supports Simpson Rim joist attached to 2"x8"Joists 16" OC Tension Ties DTT2Z. Two lateral joists with / DTT2Z brackets required for Three 16D 3-1/2"n HDG posts in this position. See Beam ^ 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty ^ Tension Ties —page 337 Code—Table rn 2304.9.1-29 House —Brick exterior 43" Scale— 12"/increment V I I 3/19/20 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" Resurfacing material 3/4" exterior plywood decking v, 'o E 2 0 x N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by 3/" extension. Pre-paint before adding flashing %" plywood soffit 1/77-7- Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z N���������������������� Attach to lateral joist with 8 SDS 1.5" screws %" x 6" Machine Bolt HDG with nuts and DTT2Z supports 1800 lb. tension load. Meets IBC washers Code for multi-family deck oo o guardrails. N E Refer to attached Simpson CE catalog- Deck Tension Ties Lateral Joist page 337 �u` \ Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 • Typical Guardrail and Infill Section — 50" max. between posts „ Simpson Strong Drive AIPIIIIIIIIIIIIIIIII Wide Screw SDWS 4", Railing 2x4TKC i 2 3/8" TL. Two per Cap Rail —Trex \� �eta�/ end, three in mid span 1" x 5.5" --_- attached to Railing with exterior adhesive. %n I m Railing Support v 2x4 TKC . ° a oo Attached to a v Railing and a Installation of Posts with v i balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", 1 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum `/ _ 2.75" space balaster%" x 32". • • Spacing 3.75" DecKorator Scale 1" increments • 0 CodeCompliance iiiiiiiiii i i i Research Report CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5