Loading...
Plans RECEIVED AN 1 1 2021 CITY OF TIGARD BUILDING DIVISION Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987@ gmail.com Contractor: Jon Erickson, 503-730-9220 jon.evenlobs@gmail.com CCB 162397 ..OFFICE COPY Scope of Work— Repair Decks CITY OF TIGARD... • Replace perimeter joists with PT REVIEWED FOR CODE COMPLIANCE • Repair joist and soffit dry rot Approved: )J I OTC: I J • Replace 42" guardrail and infill to comply with ' Pernik#C Z) r C e I IBC multi-family code Address: J S %S.L, J ) y Suite#: 3 j BY: - 11I Date: ) - 15-11 File Name: Fountains Deck Permit Plans REVISED.pptx VALIDITY OF PEFF L THE ISSUANCE OF A PERM' BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 3/19/20 Fountains at Summerfield - Deck Building Plans 1 • Typical Deck Construction and Size — 102 SF Br Col,` 114.5" 15xl1.5 � - Imbedded 6x6 PT A L� 7 <- 4x4 PT Posts - 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG 43" 15" Ref: 2014 Oregon Structural 56.5" Specialty Code-Table 2304.9.1-29 Blocking supports Simpson Rim joist attached to 2"x8"Joists 16" OC Tension Ties DTT2Z. Two lateral joists with / DTT2Z brackets required for Three 16D 3-1/2 n HDG posts in this position. See Beam 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty ^ Tension Ties-page 337 Code-Table of 2304.9.1-29 House -Brick exterior 43" Scale- 12"/increment V 7J I ,`m 3/19/20 Fountains at Summerfield - Deck Building Plans 2 • Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" Resurfacing material 3/4" exterior plywood decking La 0 oo it Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing 7 %" plywood soffit Scale— 1" increment mimmem 3/19/20 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z \\ Attach lateral joist with 8 SDS 1.5" screws %" x 6" Machine Bolt HDG with nuts and DTT2Z supports 1800 lb. �" tension load. Meets IBC washers Code for multi-family deck °x° ° guardrails. ^I E Refer to attached Simpson catalog - Deck Tension Ties �.�. Lateral Joist page 337 �� 1® Also refer to Simpson code compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive A Wide Screw SDWS 4", Railing 2 x 4 TKC } 2 3/8" TL. Two per Cap Rail—Trex °eta! end, three in mid span 1" x 5.5" ----� attached to Railing with exterior adhesive. %n m Railing Support lll a i 2x4 TKC . o a 00 ' Attached to I (Ni Railing and X Installation of Posts with a balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum V 2.75" space balaster%" x 32". r • Spacing 3.75" DecKorator Scale 1" increments • • CodeCompliance iiiiiiiiiiiil Research Report CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5