Loading...
Plans • J AN �1 202� ckece\I D vts\o� BuitD\ND Building Plans for City of Tigard Building Permit Application Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact- Paul Brock, 858-212-9105, pbrock987(c@gmail.com Contractor: Jon Erickson, 503-730-9220 jon.eveniobs@gmail.com CCB 162397 Scope of Work Repair Decks QFFICE'COPY • Replace perimeter joists with PT • CITY Op TIGARD,, • Repair joist and soffit dry rot FOR CODE COMPLIANCE • Replace 42" guardrail and infill to comply with Approved; j IBC multi-family code OTC: t I Permit gi tie anal —n 0/9 Address: ) ccc-o,c -Tv. I I LI 7-4 Suite#: By: Date: I-c14,- 0 ) File Name: Fountains Deck Permit Plans REVISED.pptx VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM 3/19/20 REQUIRING THE CORRECTION Fountains at Summerfield - Deck Building Plans 1 OF ERRORS. OSSC los.4 Typical Deck Construction and Size — 102 SF 114.5" Wick Col. 1514115 Imbedded 6x6 PT Lj n n — 4x4 PT Posts A2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG >< >< Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table 2304.9.1-29 Blocking supports Simpson Rim joist attached to C 2"x8"Joists 16" OC Tension Ties DTT2Z. Two lateral joists with / DTT2Z brackets required for Three 16D 3-1/2"n HDG posts in this position. See Beam 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty ^ Tension Ties—page 337 Code—Table o; N 2304.9.1-29 House— Brick exterior 43" Scale— 12"/increment V J L 3/19/20 Fountains at Summerfield - Deck Building Plans 2 • Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" Resurfacing material 3/4" exterior plywood decking 0 it co x N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by 3/4" extension. Pre-paint before adding flashing /:" plywood soffit ky7. Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 3 • Guard Rail Post — Simpson Tension Ties Posts—4x4 PT Simpson DDT2Z \\ Attach lateral joist with 8 SDS 1.5" screws 1/2" x 6" Machine Bolt -.., DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers Code for multi-family deck 00 .o guardrails. x N E Refer to attached Simpson catalog- Deck Tension Ties Lateral Joist page 337 Vt—\\ \ Also refer to Simpson code- y compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale— 1" increment 3/19/20 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive 1 Wide Screw SDWS 4", ' A 2 3/8" TL. Two per j Ii I Railing I 2 x 4 TKC I \. Cap Rail—Trex � etd7t ,_. .end, three in mid span 1" x 5.5„ attached to Railing with exterior adhesive. • in ^. Railing Support �/ 71111rlrll ✓ ! 2x4TKC . a / o Attached to o a r`i Railing and Installation of Posts with x balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", 2 3/8" TL. Railing 2 x 4 TKC Railing Infill - DecKorator aluminum V _ 2.75" space balaster%" x 32". • 9 Spacing 3.75" DecKorator Scale 1" increments CodeCompliance Research Report litiiiiiirlii CCRR-0161 3/19/20 Fountains at Summerfield - Deck Building Plans 5 of 5