Loading...
Permit •r CITY OF TIGARD BUILDING PERMIT MI 4 COMMUNITY DEVELOPMENT Permit#: BUP2020-00212 T1GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 117/2021 Parcel: 2S114AD00100 Jurisdiction: Tigard Site address: 16605 SW 85TH AVE Project: Clean Water Services Subdivision: None Lot: None Project Description: Replacement of Fats,Oils,Grease(FOG)concrete storage tanks with new stainless tanks.Adding a new awning structure and slab on grade to cover new FOG screening equipment, associated catch basins,and rainwater catchment for awning. Contractor: STETTLER SUPPLY COMPANY Owner: CLEAN WATER SERVICES 4420 RIDGE DRIVE NE 2550 SW HILLSBORO HWY SALEM, OR 97301 HILLSBORO, OR 97123 PHONE: 503-585-5550 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: HAPermit Fee-Additions,Alterations, 10/22/2020 $804.75 Demolition Occupancy Grp: S-2 Occupancy Load: 0 12%State Surcharge-Building 10/22/2020 $96.57 Dwelling Units: 0 Plan Review 10/01/2020 $523.09 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 10/22/2020 $102.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 10/22/2020 $321.90 Value: $60,000 Info Process/Archiving-Sm$0.50(up to 10/22/2020 $17.50 11x17) Tigard CET-Non-Residential-Admin 10/22/2020 $24.00 Floor Areas: Tigard CET-Non-Residential-AH 10/22/2020 $576.00 Total Area: 0 Erosion Control w/Development 10/22/2020 $161.40 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,627.21 Required: Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 Fire Sprinkler: Parapet: 2 Special Inspection (see plans) Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: /T _ _��� ! Permittee Signature: c7 //j" - _,�' �`�-G''' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. C�rY'J}`/L/ This permit card shall be kept In a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. rBuilding Permit Application `f 121 ) v 43 Commercial 2 — FOR OFFICE USE ONLY City of Tigard RECEIVED Received io4� 2026 �J 1111 II u 13125 SW Hall Blvd.,Tigard,OR 97223 PlateBy: Permit No.: ✓ rL���z�� Phone: 503-718-2439 Fax: 503-598-1960SEP 21 2020 Plan Review 1O_ Date/By: �rl. Related Permit: TIGARD Inspection Line: 503-639-4175 Date Read B Internet: www.tigard-or.gov Y o jf/ �l Jam: S See Page 2 for CITY OF TIGARD Notified/Medlod: /Z 20 A l ic4 Supplemental Information BUILDING nlv!Inr.j -rlr ,y--All TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ®New construction ❑Demolition Permit fees*are based on the value of the work performed Addition/alteration/replacement ❑Other: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El1-and 2-family dwelling ix Conunercial/industrial Valuation: $ ❑Accessory building El Multi-familyNumber of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 1 6605 SW 85th Ave New dwelling area: square feet City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet atew 64,1s•�te 6GdV c- i Suite/bldg./apt.#: Project name: Covered porch area: square feet Cross street/directions to job site: SW 85th Ave / Durham Road Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION.OF WORK work indicated on this application. Replacement of existing concrete Fats, Oils, Grease (FOG) storage tanks Valuation: $ 60,000 with new stainless tanks. Addition of a new awning structure and slab on grade to cover new FOG screening equipment and associated catch Existing building area: square feet basins and rainwater catchment for awning. New building area: square feet ® PROPERTY OWNER ❑ TENANT Number of stories: Name: Clean Water Services Type of construction: Address: 16060 SW 85th Ave Occupancy groups: City/State/ZIP: Tigard, OR 97224 Existing: Phone:(503) 547-8043 Fax:(503) 547-8196 New: ❑ APPLICANT IX CONTACT PERSON BUILDING PERMIT FEES* Business name: Clean Water Services (Please rejeivo fee schedule) Contact name: Dan Garbely Structural plan review fee(or deposit): 523.O9 Address: 16060 SW 85th Ave FLS plan review fee(if applicable): City/State/ZIP: Tigard, OR 97224 Total fees due upon application: Phone:(503) 547-8043 I Fax::(503) 547-8196 Amount received: E-mail: garbelyd@cleanwaterservices.org PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR . z Commercial and residential prescriptive installation of � _...t.,; roof-top mounted PhotoVoltaic Solar Panel System. Business name: /•' _ rre q Submit two(2)sets of roof plan with connection details Address: /nI �' ✓ and fire department access,along with the 2010 Oregon if K' d Lr 4lbSolar Installation Specialty Code checklist. City/State/ZIP: `r4� n } /E 973r 1 Permit fee(includes plan review Phone:( 3) S _5.5� Fax:( ) and administrative fees): $180.00 �- State surcharge(12%of permit fee): $21.60 CCB Lic.: 33,E °� Total fee due upon application: $201.60 Authorized signature: --__ !..- -----�'- ---'7--6----- This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Daniel Garbely I Date: Fee methodology set by Tri-County Building Industry Service Board. I:1BuildingTermits\BUP COMPermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains arc readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, [1] $ excluding painting and wallpapering: MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT I T 1 c n«n Building Permit Review — Commercial - No Land Use w Building Permit #: B(02620e.DOZ/2 Site Address: 1„(e(P OC (SW 51 ' ft-v-e, Suite/Bldg#: Project Name: CANS 1O( flank- Re ral,-r (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Replace tun vst,h0.4 awn ivil (V tdu kt) Existing Business Activity: wctocvmer_kcat-iivi Proposed Business Activity: It to Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: ❑ Yes Iiid No Zoning: R-h,.g" ,Permitted Use: 14 Yes 0 No 0 Spec Space Confirm no land use required. . Business License: Exists: ,N Yes 0 No, applicant was provided a business license application Notes: Approved by Planning: A--- Date: I lie/z o Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: Of-2/-2-0 Site Plans: # 3 Building Plans: # 3 Building Permit#: [VEnter building permit#above. Workflow Routing: El' Planning Permit Coordinator al-Building Workflow Sign-off: ® Sign-off for Planning(include notes from planning review) Route Application Documents: 2 Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 60-Ol Zv�0 1:\Building\Forms\BldgPern itRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit El Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) V Revision Notice 1: Date Sent to A` . . Revision Notice 2: Date Sent to A.- cant: Revision Notice 3: Date Sent to ' pplicant: ❑ SDC Fees Entered: Wash C. rans Dev Tax: 0 Yes 0 N/A T. . . Trans SDC: 0 Yes 0 N/A P.. SDC: 0 Yes 0 N/A O OK to Issue Permit Approved by Permit 'oordinator: Date: I:\Bu lding\Fortes\B1dgPermitRvw_COM_NoLandUse_111819.docx C1eanWater Services 9/16/2020 RECEIVED SEP 21 2020 CITY OF T IGARD BUILDING DIVISION TO: City of Tigard Building Department RE: Building Permit For Jobsite Address: 16605 SW 85th Avenue Tigard, OR 97224 For Durham FOG Tank Retrofit project 6992. We are sending you: • Building Permit Application • Three sets of Drawings applicable to the Building Permit Application including structural and erosion control. • Structural Calculations Thank you, Dan Garbely, Principal Engineer Clean Water Services 16060 SW 85th Avenue Tigard, OR 97224 503-927-9447 16060 SW 85th Avenue,Tigard,Oregon 97224 p:503.547.8150 f:503.547.8151 cleanwaterservices.org