Permit •r CITY OF TIGARD BUILDING PERMIT
MI 4 COMMUNITY DEVELOPMENT Permit#: BUP2020-00212
T1GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 117/2021
Parcel: 2S114AD00100
Jurisdiction: Tigard
Site address: 16605 SW 85TH AVE
Project: Clean Water Services Subdivision: None Lot: None
Project Description: Replacement of Fats,Oils,Grease(FOG)concrete storage tanks with new stainless tanks.Adding a new awning
structure and slab on grade to cover new FOG screening equipment, associated catch basins,and rainwater
catchment for awning.
Contractor: STETTLER SUPPLY COMPANY Owner: CLEAN WATER SERVICES
4420 RIDGE DRIVE NE 2550 SW HILLSBORO HWY
SALEM, OR 97301 HILLSBORO, OR 97123
PHONE: 503-585-5550 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: HAPermit Fee-Additions,Alterations, 10/22/2020 $804.75
Demolition
Occupancy Grp: S-2 Occupancy Load: 0 12%State Surcharge-Building 10/22/2020 $96.57
Dwelling Units: 0 Plan Review 10/01/2020 $523.09
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 10/22/2020 $102.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 10/22/2020 $321.90
Value: $60,000 Info Process/Archiving-Sm$0.50(up to 10/22/2020 $17.50
11x17)
Tigard CET-Non-Residential-Admin 10/22/2020 $24.00
Floor Areas: Tigard CET-Non-Residential-AH 10/22/2020 $576.00
Total Area: 0 Erosion Control w/Development 10/22/2020 $161.40
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,627.21
Required: Required Items and Reports(Conditions)
1 Ersn Cntrl 503-639-4175
Fire Sprinkler: Parapet: 2 Special Inspection (see plans)
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: /T _ _��� ! Permittee Signature: c7 //j" - _,�'
�`�-G''' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. C�rY'J}`/L/
This permit card shall be kept In a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
rBuilding Permit Application `f 121 ) v
43
Commercial 2 —
FOR OFFICE USE ONLY
City of Tigard RECEIVED Received io4� 2026 �J
1111 II u 13125 SW Hall Blvd.,Tigard,OR 97223 PlateBy: Permit No.: ✓ rL���z��
Phone: 503-718-2439 Fax: 503-598-1960SEP 21 2020 Plan Review 1O_
Date/By: �rl. Related Permit:
TIGARD Inspection Line: 503-639-4175 Date Read B
Internet: www.tigard-or.gov Y o jf/ �l Jam: S See Page 2 for
CITY OF TIGARD Notified/Medlod: /Z 20 A l ic4 Supplemental Information
BUILDING nlv!Inr.j -rlr ,y--All
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
®New construction ❑Demolition Permit fees*are based on the value of the work performed
Addition/alteration/replacement ❑Other: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
El1-and 2-family dwelling ix Conunercial/industrial Valuation: $
❑Accessory building El Multi-familyNumber of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 1 6605 SW 85th Ave New dwelling area: square feet
City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet
atew 64,1s•�te 6GdV c- i
Suite/bldg./apt.#: Project name:
Covered porch area: square feet
Cross street/directions to job site: SW 85th Ave / Durham Road
Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION.OF WORK work indicated on this application.
Replacement of existing concrete Fats, Oils, Grease (FOG) storage tanks Valuation: $ 60,000
with new stainless tanks. Addition of a new awning structure and slab on
grade to cover new FOG screening equipment and associated catch Existing building area: square feet
basins and rainwater catchment for awning. New building area: square feet
® PROPERTY OWNER ❑ TENANT
Number of stories:
Name: Clean Water Services Type of construction:
Address: 16060 SW 85th Ave
Occupancy groups:
City/State/ZIP: Tigard, OR 97224
Existing:
Phone:(503) 547-8043 Fax:(503) 547-8196
New:
❑ APPLICANT IX CONTACT PERSON BUILDING PERMIT FEES*
Business name: Clean Water Services (Please rejeivo fee schedule)
Contact name: Dan Garbely Structural plan review fee(or deposit): 523.O9
Address: 16060 SW 85th Ave FLS plan review fee(if applicable):
City/State/ZIP: Tigard, OR 97224 Total fees due upon application:
Phone:(503) 547-8043 I Fax::(503) 547-8196 Amount received:
E-mail: garbelyd@cleanwaterservices.org PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR . z Commercial and residential prescriptive installation of
� _...t.,; roof-top mounted PhotoVoltaic Solar Panel System.
Business name: /•' _ rre q Submit two(2)sets of roof plan with connection details
Address: /nI �' ✓ and fire department access,along with the 2010 Oregon
if K' d Lr 4lbSolar Installation Specialty Code checklist.
City/State/ZIP: `r4� n } /E 973r 1
Permit fee(includes plan review
Phone:( 3) S _5.5� Fax:( ) and administrative fees): $180.00
�- State surcharge(12%of permit fee): $21.60
CCB Lic.: 33,E
°� Total fee due upon application: $201.60
Authorized signature: --__ !..- -----�'- ---'7--6----- This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Daniel Garbely I
Date: Fee methodology set by Tri-County Building Industry
Service Board.
I:1BuildingTermits\BUP COMPermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains arc readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done, [1] $
excluding painting and wallpapering:
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom:
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
I
T 1 c n«n Building Permit Review — Commercial - No Land Use
w
Building Permit #: B(02620e.DOZ/2
Site Address: 1„(e(P OC (SW 51 ' ft-v-e, Suite/Bldg#:
Project Name: CANS 1O( flank- Re ral,-r
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: Replace tun vst,h0.4 awn ivil (V tdu kt)
Existing Business Activity: wctocvmer_kcat-iivi
Proposed Business Activity: It to
Verify site address/suite# exists and active in permit system.
River Terrace Neighborhood: ❑ Yes Iiid No
Zoning: R-h,.g"
,Permitted Use: 14 Yes 0 No 0 Spec Space
Confirm no land use required.
. Business License:
Exists: ,N Yes 0 No, applicant was provided a business license application
Notes:
Approved by Planning: A--- Date: I lie/z o
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved 0 Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: Of-2/-2-0
Site Plans: # 3
Building Plans: # 3
Building Permit#: [VEnter building permit#above.
Workflow Routing: El' Planning Permit Coordinator al-Building
Workflow Sign-off: ® Sign-off for Planning(include notes from planning review)
Route Application Documents: 2 Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: 60-Ol Zv�0
1:\Building\Forms\BldgPern itRvw_COM_NoLandUse_111819.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
El Approved, NOT Released: Date:
Notes:
Revisions (after Building Submittal only) V
Revision Notice 1: Date Sent to A` . .
Revision Notice 2: Date Sent to A.- cant:
Revision Notice 3: Date Sent to ' pplicant:
❑ SDC Fees Entered: Wash C. rans Dev Tax: 0 Yes 0 N/A
T. . . Trans SDC: 0 Yes 0 N/A
P.. SDC: 0 Yes 0 N/A
O OK to Issue Permit
Approved by Permit 'oordinator: Date:
I:\Bu lding\Fortes\B1dgPermitRvw_COM_NoLandUse_111819.docx
C1eanWater Services
9/16/2020 RECEIVED
SEP 21 2020
CITY OF T IGARD
BUILDING DIVISION
TO: City of Tigard
Building Department
RE: Building Permit
For Jobsite Address: 16605 SW 85th Avenue
Tigard, OR 97224
For Durham FOG Tank Retrofit project 6992.
We are sending you:
• Building Permit Application
• Three sets of Drawings applicable to the Building Permit Application including structural
and erosion control.
• Structural Calculations
Thank you,
Dan Garbely, Principal Engineer
Clean Water Services
16060 SW 85th Avenue
Tigard, OR 97224
503-927-9447
16060 SW 85th Avenue,Tigard,Oregon 97224 p:503.547.8150 f:503.547.8151 cleanwaterservices.org