Loading...
Permit 114 CITY OF TIGARD MASTER PERMIT COMMUNITY DEVELOPMENT Permit#: MST2021-00005 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/27/2021 T I G r112 - 9 Parcel: 2S109AD14400 Jurisdiction: Tigard Site address: 12943 SW TAKENA CT Subdivision: ARBOR SUMMIT NO.2 Lot: 40 Project: Bowen Lui Project Description: Rooftop solar PV BUILDING Floor Areas Required Setbacks Required Stones: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $3,978.70 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 Drains: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Other Fixtures: 0 Drywell-Trench Drain: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add'I 500 sf: 0 201.40D amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amplvolt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: Y Other Description: Roof Top Solar PV System 4.41 kW Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: OTR SF VB R-3 0 Owner: Contractor: LIU,BOWEN BRS FIELD OPS LLC Required Items and Reports(Conditions) HU,XIAOXIA 1403 NORTH RESEARCH WAY 12943 SW TAKENA CT OREM.UT 84097 TIGARD,OR 97224 PHONE: PHONE: 855-205-2530 FAX: Total Fees: $322.88 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: `3 ‘..3cunc_We Permittee Signature: en U t (Ch V-1 Call 50 639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application l , Tip- 11 lD 121 Residentiall RECEIVED FOR` OFFICE USE ONLY Cl of Tigard ved Date/By: / i ZO % �{v Permit No.: 13125III SW Hall Blvd.,Tigard,OR 97223 Th JAN 0 2011 RecePlan Review / M`�T WM- 5 Phone: 503.718.2439 Fax: 503.598.1960 / �j' Other Permit: I It,A tt , Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: j is Pi See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISION tified/Mett : l r �f I 40 net Supplemental Information TYPE OF WORK REQUIREIf DATA:1-AND 2-FAMILY DWELLING 0 New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling 0 Commercial/industrial Valuation: $ $3,978.70 ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other. Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 12943 SW Takena Ct, Tigard, Oregon, 97224 New dwelling area: square feet City/State/ZIP: Garage/carport area: square feet ' Suite/bldg./apt.no.: Project name: Bowen Liu Covered porch area: square feet Cross street/directions to joh site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment.materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Rooftop Solar PV Valuation: $ 1` y/ , Existing building area: square feet New building area: square feet ® PROPERTY OWNER ❑ TENANT Number of stories: Name: Bowen Liu Type of construction: Address:12943 SW Takena Ct,Tigard,Oregon,97224 Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fax:( ) New: ❑ APPLICANT ®CONTACT PERSON BUILDING PERMIT FEES* Business name:Blue Raven Solar (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name: Justin Marlowe Address: 1403 N Research Way FLS plan review fee(if applicable): City/State/ZIP: Orem, UT 84097 Total fees due upon application: Phone:(385).482-0045 Fax::( ) Amount received: E-mail: permitting.deparment@blueravensolar.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* „!'.. * ' 'ra," NTRACTOR Commercial and residential prescriptive installation of . .. ,: roof-top mounted PhotoVoltaic Solar Panel System. Business name: BRS Field Ops, LLC Submit two(2)sets of roof plan with connection details 1403 N Research Wayand fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Orem, UT 84097 Permit Fee(includes plan review $180.00 and administrative fees): Phone:(385)482-0045 Fax:( ) State surcharge( 2a12/o of permit fee): $_1.60 CCB lic.: 227185 Total fee due upon application: $201 60 Authorized signature: c7e .ey JCee This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: JeffreyLeeDate: 01/04/2021 *Fee methodology set by Tn-County Building Industry Service Board. I:\Building\Permits1BUP-RESPermitApp.doc 02/24/20 I l 440-46I3T(11/02/COM/WEB) Electrical Permit Applica FOR OFFICEUSE ONLY City of Tigard CEiVED Dateived ''11sou �J � riv Pemt#: • 13125 SW Nall Blvd.,Tigard,OR 972?3'ItN p T�1I Plan Review Related Permit#:IVlS[(}sZI �0c Phone: 503.718.2439 Fax: 503.598.1 Date : Inspection Line: 503.639.4175 CITY Ready Date/By: hnis: gl See Page 2 for TIGARD Internet: www.tigard-or-gov ffll��iinn OF TIGARD Notified/Method: Supplemental Information TYPE OF ihit INt.2 DIVISIUN PLAN REVIEW ❑New construction ©Addition/alterationirepIacement Please cheek all that apply(submit 2 sets of plans wiitems checked): ElService or feeder 400 amps or more ❑Building over three stories. E Demolition ❑Other: where the available fault current ❑Marinas and boatyards. CATEGORY OF CONSTRUCTION exceeds 10,000 amps at 150 volts or ❑Floating buildings. 01-and 2-family dwelling ❑Cornmercial/industrial Ill Accessory building less to ground or exceeds 14,000 ❑Commercial-use agricultural ❑ Multi-family ❑Master builder ❑Other: amps forall other installations. butangs. ['Fire pump. Installation❑ of 150 KVA or JOB SITE INFORMATION AND LOCATION ❑Emergency system. larger separately derived 12943 SW Takena Ct,Tigard, Oregon, 97224 ❑Add lion of new motor load of system. Job#: 1 Job site address: ❑ `A","E","t-2","1-3", OOHP or more. ❑Six or more residential units. occupancy. City/State/ZIP: 0Recreational vehicle parks. ❑Health-care facilities. Suite/bldg./apt.#: Project name: Bowen Liu ❑Hazardous locations. 0 Supply voltage for more than ❑Service or feeder 600 amps or more. 600 volts nominal. Cross street/directions to job site: FEE SCHEDULE Description I Qty. I Each I Total I ' New residential single-or multi-family dwelling unit. Subdivision: Lot#: Includes attached garage. 1,000 sq.ft.or less 168.54 4 Tax map/parcel#: Ea.add'I 500 sq.ft.or portion 33.92 1 I DESCRIPTION OF WORK Limited energy,residential Rooftop Solar PV (with above sq.ft.) 75.00 2 Limited energy,multi-family 75.00 2 residential(with above sq.ft.) — - Renewable Energy 0 See Page 2 ®YROYER"(Y' OWNER --� I: TENANT. Services or feeders installation,alteration,and/or relocation Name: Bowen Liu 200 amps or less 100.70 2 Address: 12943 SW Takena Ct,Tigard,Oregon,97224 201 amps to 400 amps 133.56 2 401 amps to 600 amps 200.34 2 City/State/ZIP: 601 amps to 1,000 amps 301.04 2 Phone:( ) Fax:( ) Over 1,000 amps or volts 552.26 2 Temporary services or feeders installation,alteration,and/or Email: relocation Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 20l amps to 400 amps 125.08 2 Owner signature: Date: 401 amps to 599 amps 168.54 2 ElAPPLICANT ❑ CONTACT PERSON Branch circuits—new,alteration,or extension, er panel A.Fee for branch circuits with Business name: Blue Raven Solar above service or feeder fee, each branch circuit 7.42 2 Contact name: Justin Marlowe B.Fee for branch circuits without Address: 1403 N Research Way service or feeder fee,first 56.18 2 branch circuit • City/State/ZIP: Orem, UT 84097 Each add'l branch circuit 7.42 2 Miscellaneous(service or feeder not included) Phone:( 385 482-0045 Fax: : ( ) Each manufactured or modular 67.84 2 Email: permitting.department@blueravensolar.com dwelling,service and o feeder Reconnect only 67.84 2 CONTRACTOR Pump or irrigation circle 67.84 2 Business name: BRS Field Ops, LLC Sign or outline lighting • 67.84 2 Address: 1403 N Research WaySignal circuit(s)or extensienergy ❑ See Page 2 2 panel,alteration,or extension. Each additional inspection over allowable in any of the above City/State/ZIP: Orem, UT 84097 Additional inspection(1 hr min) 66.25/hr Phone:(385)482-0045 Fax:( ) Investigation(1 hr min) 90.00/hr Industrial plant(1 hr min) 78.18/hr Email: permitting.department@bluerav n olancom Inspections for which no fee is CCB Lic.: 227185 Electrical Lie.: a Suprv.Lic.: 6394S specifically listed(F,tr m n) 90.00/hr fihart lJhitta.heti ELECTRICAL PERMIT FEES Suprv.Electrician signature,required: Subtotal: Print name: Shan Whittaker Date: 01/04/2021 ❑Plan Review Required(25%of permit fee): State surcharge(12%of permit fee): jett 4e6 _ __ TOTAL PERMIT FEE: Authorized signature: This permit application expires if a permit is not obtained within 180 Print name: Jeff Lee Date: 01/04/2021 days after it has been accepted as complete. * Number of inspections allowed per permit. h\BuildingiPermits\ELC_PermStApp ELR ERE.doe Rev 06/17/2015 440-4615T(11/05'COM/WEB Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: FEE SCHEDULE Description I Qty. Each Total I . Fee for all residential systems combined: S75.00 Renewable electrical energy systems: Check Type of Work Involved: s kva or less 1 100 70 2 5.01 to 15 kva 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 50.01 to 100 kva 552.26 2 ❑ Garage Door Opener* >100 kva(fee in accordance 552.26 2 with OAR 918-309-0040) ❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva no additional charge 0,0 3 Each additional inspection over allowable in any_of the above: ❑ Other: Each additional inspection is 66.25/hr charged at an hourly(1 hr min) Inspections for which no fee is 90.00/hr specifically listed(Yx hr min) COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES Subtotal(Enter on Page 1): Fee for each commercial system: S75.00 • Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: ❑ Audio and Stereo Systems ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations t\eailding\Permits'ELC PermitApp_ELR ERE.doc Rev 06/17/2015 City of Tigard RECEIVED III RI Building Division JAN062021 13125 SW Hall Blvd,Tigard, OR 97223 CITY OF TIGARD Phone: 503.718.2439 Fax: 503.598.1960 T I GARD Inspection Line: 503.639.4175 BUILDING DIVISION www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 12943 SW Takena Ct, Tigard, Oregon, 97224 City: Zip: Owner's Name: Bowen Liu Date: 01/04/2021 Contractor's Name: Blue Raven Solar CCB #: 227185 Design Parameters of the Property/Structure If"Yes", does not Is the installation qualify for the Flood Hazard ❑ Yes Area Located in a flood prescriptive path, follow plain/flood way? © No OSSC or ORSC for design requirements. Is the wind exposure 0 Yes If"Yes", qualifies for Wind Exposure "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes Yes the prescriptive path. and/or their accessory Ground structures. El No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? If"Yes", qualifies for structures other than 0 Yes the prescriptive path. above ❑ No 1 1:/B uilding/Fonns/Photo V oltaic-Checkli st02-01-1 I.docx Is the construction MI material wood and does Yes Type of If"Yes", qualifies for the construction qualify Construction ❑ No the prescriptive path. as "conventional light frame" construction? Is the spacing 24 inches or less? Pre-engineered trusses. Yes If"Yes", qualifies for the prescriptive path. U No Roof framing members Is the spacing 24 inches or less? Nominal lumber. 0 If"Yes", qualifies for Yes the prescriptive path. ❑ No Is the combined weight In Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance 0 Yes with Section 305.4(3) of If"Yes", qualifies for the 2010 Oregon Solar ❑ No the prescriptive path. Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. El of composition shingle. Is the roof mounted p Yes Connections of solar assembly the solar assembly connected to roof No If"Yes",eiqpti e p for to the roof framing or blocking ❑ the prescriptive path. directly? 2 1:Building/Forms/PhotoVoltaic-Checklist02-01-11.docx Is the gauge 26 or less'? ❑ Yes If"Yes", qualifies for ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? ❑ If"Yes", qualifies for Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of • roof mounted Minimum 24 inches If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the standing seam prescriptive path. metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? El Yes the prescriptive path. ❑ No Is the roof decking of WSP min. '/2"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12" o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for 0 Yes solar modules module to the roof the prescriptive path. surface. ❑ No 3 1:/Building/Forms/Photo Voltaic-Checklist02-01-11.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing (rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: JinKO Solar Eagle Model Number: JKM 315M-6OHL Listing Agency: CSA 4 I:/Building/Porms/Photo Voltaic-Checklist02-01-1 l.docx