Loading...
PFI2020-00388 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT • COMMUNITY DEVELOPMENT Permit#: PF12020-00388 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/21/2021 Parcel: SEG406& SEG177 Jurisdiction: Site address: 10031 SW CASCADE AVE Subdivision: Lot: Project: Zayo Fiber 1S127DD01200 Project Description: Zayo is proposing to place 2" riser, place down guy and anchor. Then place new HH along South side of SW Cascade Ave Class of Work: FEES Description Date Amount Type 1 - Utilities (gas, electric, data) PFI Permit Fee 01/21/2021 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: ZAYO 6074 N DISCOVERY WAY STE 125 BOISE, ID 83713 PHONE:2085764031 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant signature: see application /Vlp,lp/, ,[,/ Issued By: C ^" Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2020-00388 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association [ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07 -TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met) and 503-431-2345 (Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PH_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Trent Brickey>at <971-228-9269>,to establish a preconstruction meeting. Please call 503-639-4175 to schedule inspection, use code 738 PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22 -DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28 -AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28 -AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard PFI#: PF12020-00388 ■ ENGINEERING DEPARTMENT i it, Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: 1 S127DD01200 XI TYPE 1—Franchise Utility Work Brief description of project: ZAYO is proposing to place 2" riser,place peed by NWN,PGE, or utility agency down guy& anchor.We will then place new HH along South side of SW ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Cascade Ave. Work performed for the purpose of• Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 10031 SW CASCADE AVENUE main line tap 0 TYPE 3—Full Scale Development Work performed with land use approval which indudes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: ZAYO GROUP • Mainline installation for sanitary sewer. storm sewer, Tigard water, and Tigard Mailing address: 6074 N DISCOVERY WAY STE.125 water service area ,ID 83713 ❑ TYPE 4—Small Cell Technology BOISE, Zip: 0 TYPE 5—Tigard Triangle Phone: 208-576-4031 Email?ERMITTING@MOUNTAINLTDAe: NOTE: Type 1 and 2 applications may be Contact name: BREANNA HODGE OSP FACILITY ENGINEER I emailed to rowpermits@,tigard-or.gov. Phone: Email: CONTRACTOR INFORMATION ❑ Same as applicant Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION CHRIS YBARRA Name: Mailing address:18110 SE 34th St-Bldg 1 City/State: Vancouver WA Zip: 98683 Phone: 661-617-9746 Email: christopher.ybarra@zayo.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. .51.2.a.LILCL /o' Breanna Hodge 10/15/2020 Applicant's or authorized a nt's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PF12020-00388 Permit fee: gV.&•UD Received by:HPollardDate: 10/15/20 Approved by: 77?-4174 Date: t/Zf/20 41 Notified by: Al-- Date: j I21 I'j.o 2 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes ❑ No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal CI Dimensions considered? (check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 Edge of Pavement ""11 Latch '''" ► r f t , �1 � � 1 7—Ti opocirecmvc iTing-- v. 1 I 1- i �.. a Existing Mouse I ., I Exsimc I F. �u . Driveway d� OS , I ai ;/ I. a , j�l Id I / T-I al 1 i' A i I i I , Exreting Shop '3 Powerpoie v if \ I 9 5T mini ort I v� ii IN Fre.-ycrartiFti, I 1 I - 1 I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility& street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feet} Posted Spacing Between Signs "Buffer" Speed , A 8 C Space 20 SO 2S 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 ROAD\ WORK A AHEAD tyt CENTER LANE I �CL03ED� AHEAD A II • L/2 I . I • r Buffer r Protection Vehicle • w/TMA(both Optional) See Chapter 4 T E Buffer • • • LJ2 f • • • • • L12 I • I A • • 41111" 14t B i ROAD I I 446 WORK \AHEAD September 2016 Chapter 5 ADDRESS: 10031 SW CASCADE AVE, TIGARD, OR 97223 CONTACTS ENE°CONTACT:CHRISTOPHER YMARRA NAME: CRANRWORTGARD002 - VANCOEa:; i.P61 PROJECT MANAGER awl CHRIBTOPNER.YEARRA@SAYOGOM v l.Orll fu'rulu'151d[4Urntluce Nt lal JNIONNTAINJTO ESSE HOLLAND Q 52 FMSMNEW DR,STE I01 T WW;LOU0066TER,ME 0•12RI �BeeseROn Early GViIaL Cm\H JHCLLAVC®MOUNTNNLTOCON' ChH4M1OW Cmte1 OMw.nr.. © APOON Y I he Coeececake 16f50ry Lal 3J Consul/log 5 9Paychet 9 6? . m M Oloenlran;stay SHEET INDEX NIRILIYs Cor 1 Center • 1.COVER SHEET I SITE LOLA-ION Account te.6,Q V �2e1 II 3.LEG ROTES �^ Q p 4.PLAN'AM iN z, ' Washroom Square GrePaymenl • WSch°As Ferry Rd 't Porn"v / J, Foo Locker Ha M Aerso • d Onikrrak gk SCOPE OF WORK QGRISIDE OF Q J FROM ZAYO TO HEMOVEOIAN SCHCELSMer POINT FERNYN ' / i� ,i TMYOTO0sloe Or TOMEET.EDOT L E SOUTH SIPEUM so CASCADE AVE,EAST nF 6W SCXCLLS FERRY RO. JS T[R1i14, SOCI2211c • 9PredsNJc Aenrah •• / fEuchle s°ID 6 �P' PLAN VIEW A ,", Amazon Book. ©Sank of the Wl SOuhd Heal!) 4'l Medkdl SUPPM LMsNr Iwtpry nnr n SITE LOCATION ADJACENT PARCEL NUMBER: 1S127DD01200 a JURISDICTION:TIGARD Enu M W6V n-m �" [ p6W "tall "MewwM AM 1 22112:112110I �w ;ra °Ia 0d� - IaATI :A.E a,. 0...noa LEGEND L(E"rPES SYMBOIS INFORMATION TABLES - MAW ma-EEtiTING I RISER-EASMO AER4 LW-ATM I © TRM6VIS4pVOmR9NKN POLL POU _AM_ t (MA POI PEQWMON TIBLE MRW NM-PWRISH F� RISER-PROPOSED 0651FG NNV 0'-0 (MAIM A ATOCIM NTS MY MY) -- SRAM-101.14 CATCH B,9!/NET QECTAIOA&R) O TRM6YK5p11 POLE PROPOSm MMat -0•_0• SUVM-PROPOSED CATCH BASIN/MET(IOMM Op A5IPoBIRION POLE #F qR YOOEMIIWL N/Wf GMLOR ___ COOK-MIND ______ __— COMM-PROPOSED FM M'OPAMI —IF, ITUIRD/8010 WATER/nS VItO #F IN - SWIM MARL CALM rME MS UOR POSE (]‹), MOW s,mSa-d61NGlc i11 SEGUE111Y1 i N MINTwO or WAFER 9 SWEET WIT O OUT: Q AERIAL -PROPOSED - - OP TFI E RFR OPEC r, TTWFC MIT AM HATCH PATTERNS - E - ELECTIM OO' VMAT/BIRONG STORAGE-EXOTIC SEW SMOMY MICR(SEW) DIII MCKIE MOM STORY DEAN 'MAT/xNOIID 40RM£-PROPO40 USEQ IV B CULVERT — POLE mom/DDWN GUT-EXOTIC EW OIL MG WILL —< POLE MIUPOR/00WN CAR-PROPOSED OPISSMLETATOR PUCE SAME DOM GUY 10 COSTING ANCHOR-PROPOSED IL'. RIGHT CC WAY 0-41 SPLCE POOP-dSIxG EDGE OF MEMO SIFT Sal CRAWL 1P41 SPIKE POW-PROPOSED PBBREVATIONS ADA PAW 1=1TwMLAROM-coma CR ASPIRE,MOW _ 99 BLACK RCN PA{ MIRY PSI-EXOTIC MID RRMN11OI-PROPOSED —- l— WATER OSP BLACK SILA PPE %NIBO%-(MIS1Ni CSW COACRETE SIDEWALK UM1'PRE-MIMEO ELECT. ELECTRIC ® PUIROX-PROPOSED RP Mr(<PAVEMENT IRMMC PMED SOT-Distil ^ EON not OE IMVx WAY (SOF RC INOY TFf WAY `J LORSIRI.CIAR WE/RESMRA1 II LAII IRO FEEL ECE OE CURS �l SE WY,RICK PMED WELT-PROPOSED M PIaTD-MAW F/0 as OPAL (S v.fro HOPE HMI OFIxM POLAROID( IVENCLE EROTIC S NH MOW (SQE M OIIIY C TYPE WY PM) NORM MINOR .x ARCM BOX MOM-PROPOSED RH WHOLEMM (SQL MAY WM) MP NE POST PEDESTAL-EMS1M 0/S OFFSET (92E MC UIEIIY TYPE TNT AIRY) PR PURR RISER © (sQ PWE wESTMv-vgir)PROPOBEO - Mum-Pwr PVC PDLY MR CCHLORIDEM' FRS RNRO GMWWZkD STEEL CONDUIT (� WIT RA NNY TYPE BISTRO 1110 RON RC WAY _ zayo At SEW SMRMY SEWER SO MORM ORAIN .II. (SIZE WY W PROPOSED EL "A STA MVP MII1'PORAE ifilil LOCATION mr L _ o Rm STAR SEAM `nN¢ca13/223 TEL luau , em.. _ .2_PE..,2.,.. .r lI,I.I.,0., ....,. oW.w�nG am CY Mwluh ....L e..d.-. .a, r.eA a w. GENERAL NOTES GENERAL NOTES AN56UCUiIESSOMTONTHESE WAVY,.ARENARASRONMATE FKKMINN LTD.aEREBY PSCLO4AS RESPoNSIBILIT,01141l0 Puttip RATE xi3iWBBVATRL PTAYIRNtlW SOIN T1B AREA COVERED A T149 WAWNG MUST CONTACT TIE STSRN1CCML.BEFORE.TIXVpG SYSTEM TO AS:Orr.N TE LOC..C£NNTRGRPINO MILT.FION TO P.FORMTO Mn E TTSTION. I.ALL MATERIALS,WORIOAANSHIP,AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE CRY OF TIGARD REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS.WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS,OR ANY APPLICABLE STANDARDS,THE HIGHER QUALITY STANDARD SHALL APPLY.ALL WORK WTHIN PUBLIC ROW OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BY THE CITY OF TIGARD INSPECTOR.INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER. 2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTRITIES,AS SHOWN ON THESE PLANS,IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND.VMERE POSSIBLE.MEASUREMENTS TAKEN IN THE FIELD.THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE,THE CONTRACTOR MUST CALL TIE LOCAL UTILITY LOCATION CENTER AT LEAST AS HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES.THE CONTRACTOR SHALL VERIFY PERTINENT LOCATORS AND ELEVATIONS.ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES.THE CONTRACTOR SHALL NOTIFY THE CITY OF TIGARD INSPECTOR AT LEAST AB HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED. A.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF TGARD AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION.TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION,AND WITH A MINIMUM DISRUPTION OF SERVICE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE. 5 THE CONTRACTOR SHALL HAVE ONE(I)SIGNED COPY OF THE APPROVED PLANS.ONE(I)COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATONS.AND ONE(1)COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON.SITE AT ALL TINES THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING,BUT NOT LIMITED TO.EXCAVATION, TRENCHING.SHORING,TRAFFIC CONTROL.AND SECURITY. T.IF,DURING THE CONSTRUCTION PROCESS,CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR.HIS SUBCONTRACTORS,OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS.THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY. 8 ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD.UNLESS SPECIFICALLY STATED OTHERWISE. B.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE CITY OF TIGARD,THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M U.T C 0.FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT.OF-WAY.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS.PRIOR TO INSTALLATION n PRE-CONSTRUCTION CONFERENCE SHALL BE HELD WITH CITY OF TGARD. TO.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED MPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED,INSTALLED,CONSTRUCTED,REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE. 11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE. 12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE CITY OF TIGARD INSPECTOR AT ALL TIMES. tl-PgT 13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING FOR ADDITIONAL INFORMATION qgw F T CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS. emoRA BEENWIRANT 14.ALL EROSION AND SEGMENT CONTROL(E SC)MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTOR PRIOR TO GROUND DISTURBING ACTIVITY.ALL E.S.C.MEASURES SHALL BE MAINTAINED N GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING. tS.ALL WORKWRTMN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE CITY OF TIGARD ENGINEERING {�y 11.LTawTr. DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS. AHAREF IR xG RRMTSNlfl Lira 16.ALL CONSTRUCTION OPERATIONS,INCLUDING THE WARMING UP,REPAIR,ARRIVAL,DEPARTURE OR RUNNING OF TRUCKS,EARTH LOC TOR locECT al ER RDNAV wRo Lannon 1T ao N ARE MOVING IODAEPRO,ED THE ON OF TIPARDT AND ANY OTHER ASSOCIATED EOOPMENT SHALL GENERALLY BE LIMITED TO THE 1 T TIME PERIOD APPROVED BY THE CITY OF TIGARD. pB • BIl lE OIOW' �w WR1RI'µ of 1 TVAF / N , PO I M \ vt I / N NN _ ROOM AnIOI t — uCA vo_COW . SW CASCADE AVE lino Mr CRAN_RWDR_TG4R0_002 97-0 / Po[[I Cu2ID 11095 / w1t I 007 Iveos n b tt.NEW DUO CFI P{ I M.2'FfFF R IOI HH IN BACK Of MAIM AnAEw I f 0+45 P2 - E� x� w ro raN nH era,; sxr. CELLM E.IS.LLM I31i E1MIDIA il2V1 �- `. ®Ellllll / ti I 10031 ..EPIPL OVERLASH ACR03S ROAD, THEN i� NORTH AND EAST TO MEET POINT ON THE SOUTH SIDE OF SW CASCADE AVE. vul: 2+60 P3 ___ 2. POLE/ 012:12E'2 i5 I I w pm wm �MM. 1 i 2\'MASH C.12:12, 1 Z1yv Ail WW1,.W� oa¢ 'taAwro woos W.uvr ew..wn oa[501 SW