PFI2020-00373 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT ° • COMMUNITY DEVELOPMENT Permit#: PFI2020-00373 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/21/2021 Parcel: 2S102AD01900 Jurisdiction: Tigard Site address: 8935 SW BURNHAM ST Subdivision: None Lot: None Project: 2S102AD01900--Conduit Placement Project Description: New fiber installation Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric,data) PFI Permit Fee 01/21/2021 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: BREANNA HODGE 6074 N DISCOVERY WAY SUITE 125 BOISE, ID 83713 PHONE: 2085764031 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: see application Issued By: M AfrteinJ Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2020-00373 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice a.m.to 3:00p.m. unless authorized bythe Hours of construction work on collector and arterial roads will be limited to 9:00 City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22- DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI Utilities 31 -OTHER Applied Notice Other City of Tigard PFI#: PF12020 00373 IIIIIENGINEERING DEPARTMENT i I t,,,im Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project2S102AD01900--CONDUIT PLACEMENT name: ❑ TYPE 1—Franchise Utility Work Brief description of project: ZAYO is proposing to attach new fiber through performed by NWN,PGE, or utility existing aerial route located behind cust. building.We will then bore 30' of:ten, TYPE 2-ROW Sidewalk/Driveway/Sewer 2" conduit at 36" depth to avoid utilities and minimize R&R. Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair 1 SITE INFORMATION • Sanitary sewer lateral installation and 8935 SW BURNHAM ST main line tap Location (address if available): ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following • Subdivisions or Partitions APPLICANT INFORMATION • Street widening ZAYO GROUP • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and Tigard Mailing address: 6074 N DISCOVERY WAY STE.125 water service area BOISE,ID 83713 0 TYPE 4—Small Cell Technology City/State: Zip: 208-576-4031 CELL:907-888-5237 0 TYPE 5—Tigard Tr angle Phone: Email: permitting@mountainitd.comphone: NOTE: Type 1 and 2 applications may be Contact name: Breams Hodge OSP Facility Engineer I emailed to rowp xmits(2.tiggrd-or.gov. Phone: 907-888-5237 Email: Same CONTRACTOR INFORMATION 0 Same as applicant Name: Kevin Schenck CCB Number: 157726 Mailing address:PO BOX 1355 City/State: WOODINVILLE,WA Zip: 98072 Phone: 206-730-7327 Email: kschenck@utilitytechnologies.net ENGINEER INFORMATION Name: Christopher Ybarra Mailing address: 18110 SE 34th St. Bldg 1 City/State: Vancouver,WA Zip: 98683 Phone: 661-617-9746 Email: Christopher.Ybarra@zayo.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. l3ao�.ui� YYBv2/. Breanna Hodge 10/06/2020 Applicant's or authorized agefit's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PF12020-00373 Permit fee: 30Pi." Received by: HPollardDate: 10/6/2020 Approved by: —Yl?ha L3- Date: l/u/2- 4/ Notified by: Date: l'ZI 12-02-1 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Pan 2: All non-water system improvements engineer's estimate X 7%(less the initial PH Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way 0 Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes (City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 4' Sti1 .. i .. SI Edge of Pavement '1� Ditch -'4""Streetlight �• •�•�•�•-r—•— a Run Drain r,r !-t s I liter ,O ° ."I T—Ti 017Ti w rce errirrir I 1 1 I Existing House I i r I Existing I 3I • Driveway `•,i up a,I I 1-1 o ii z+ • 1 C'1 I t4 J 6nqing ,^Sh,p i p:vE.pce , I ."- 1 I r` 9 S' i I i i l i I IN Ftr.Hydrant(FH) i I �ryt1■ Scale t"=.-;n. I I I i I i I TYPE 1 AND TYPE 2: MINIUM SKETCI I REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 Page 78 2011 Edition Work on Shoulder Diagram 210 Diagram 210 covers stationary work with work or parked equipment on the shoulder. This diagram does not cover work on a freeway shoulder. See Diagram 710 for Freeway Shoulder work. 1. Vehicles should be parked as far off the roadway as practical. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3 —Lights and Lighted Signs for exceptions. 3. For added visibility, truck-mounted arrow boards or PCMS in caution mode may be used. 4. Arrow panels in caution mode are recommended for work on roads with posted speeds of 45 mph or greater and high traffic volumes, greater than 2000 average daily traffic (ADT). 5. Requirements for signing and devices are shown in Table 5-2, below. Table 5-2: Device and Signage Guidelines Proximity to Edge of Traveled Way More than 15 feet or behind Barrier or Less than 15 feet Guardrail One advance warning sign is Advance warning required and two signs are Work in Place signs, devices, and recommended. More than 1 Hour flashing warning Cone taper is required. Cones lights are optional. along the edge of traveled way are optional. Work in Place Advance warning signs and devices are optional. Less than 1 Hour Sign Spacing and Buffer Lengths(feet) Posted Spa dng Between Signs "Buffer' Speed A B C Space 20 50 25 100 100 100 75 30 100 40 350 350 350 150 451 180 50 500 S00 500 210 __ _ 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 Work on Shoulder Diagram 210 l ' T • • • • • • • • (Optimal) • WRIAA(both Optional) See Chapter 4 • • 01ar • • • • us* • ROAD * WORK OR Initial Warning Sign 4 t •Use as appropriate-ass Table 6-2 SeplwnWr 2016 ADDRESS: 8777 SW BURNHAM ST, TIGARD, OR 97223 CONTACTS NAME: HUB SW BURNHAM (TGARD) ZAYOOOxTAO➢OXRI6TOPXER B RRA OAP PCONTAC MANAGER 1e1109EJOTXST,BLW 1 VP42OUYE7 WA 89E81 ] CHRISTOPHER Y84RRPQ1AY0 CON e v , JESSE XOLLPND 5 e FANseALWTOR,STE 201 NEWGLOVLESTER.ME W260 JXOLLA4CQEgVXTNNLTD.CpA 9 MAKI Japencse Naliroons°awe SYXan 11Once RaCing9 Nerd TCw€se CORQIRV 'n 2 I Iga!d Spans V L mIbWO 9 Tigard TepIos,e I-a +X SHEET INDEX p Knexnuenm 1 coveN SNEE116rtE LOCATION 'i MRlenals 2. LECEND \\ y PLAN VIEW A ,. GLTIIV LNCEr" 1))) Silydr69 45 vux vlE'h5 • S /\.. 1 `x 9Aper Ineuelnes .SW81HaaaT Sl �..1i,... 65W Ash 4ve N� �. e/ `e `* SCOPE OF WORK © • TONcx s< c.sLENxTWSR CMLW1.1 SOON tt IR NW Referred r �• FUsIrW awu eral beds Hawn V":Penhantste,prIa9se 'v Tyerd wmsuppy vCo,PCMRN Need wigwam 9 SITE LOCATION ADJACENT PARCEL NUMBER:2S102AD01900 JURISDICTION:TIGARD NOMOOTRW� L" wmine Mew. an'ma . s e....me i 411a li P3 , a b d s R { g 4 f f i 6? 5 o sgg R a• LL — —Ili — s3 Mil : II ! iii ; ; Ohl ll w c�ooT ' HgOOITTII ; EIKI ® oo41K C9 Ri ri rk i i s o p a i I R § 6 la a la Eg gg ig -00E0<3 ):qIC' 0010 Er _ 7Inep ® , Y ' II II II H I II �i II —91g9g Ask iRit itiiii ; sda0 GENERAL NOTES GENERAL NOTES *E J0001TSIN1.16 CFREA oSLIMUSLIRFSNMBBUTT IOTNiq PARTIES FON Mk M MUST CCMIGT TE TITEWCE CALIWOMBVWd66VlT!TO tlCBnun 1.ALL MATERIALS.WORKMANSHIP.AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE CITY OF TIGARD REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS.WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS.OR ANY APPLICABLE STANDARDS,THE HIGHER DUALITY STANDARD SHALL APPLY.ALL WORK WITHIN PUBLIC ROW OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BY TIE CITY OF TIGARD INSPECTOR.INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSORIOMIER. ]THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION ANDIOR ELEVATION OF EXISTING UTILITIES,AS SHOWN ON THESE PLANS.IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE.MEASUREMENTS TAKEN IN THE FIELD.THE INFORMATION IS NOT TO RE RELIED UPON AS BEING EXACT OR COMPLETE THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST IA HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES.THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS.ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES.THE CONTRACTOR SHALL NOTIFY THE CITY OF TIGARD INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED. 6.THE CONTRACTOR SHALL COORDINATE AND CLU'PERATE WITH THE CITY OF TIGARD AND ALL UTILITY COMPANIES WTH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING WRITES DURING CONSTRUCTION,TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION.AND WTH A MINIMUM DISRUPTION OF SERVICE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE. 5.THE CONTRACTOR SHALL HAVE ONE(1)SIGNED COPY OF THE APPROVED PLANS,ONE(1)COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS.AND ONE 111 COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES S THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING,BUT NOT LIMITED TO EXCAVATION, TRENCHING.SHORING.TRAFFIC CONTROL.AND SECURITY. T IF,DURING THE CONSTRUCTION PROCESS,CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR,HIS SUBCONTRACTORS.OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS,THE CONTRACTOR SWILL CONTACT THE ENGINEER IMMEDIATELY, I.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD.UNLESS SPECIFICALLY STATED OTHERVASE. 9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY TIE CITY OF TIGARD,THE CONTRACTOR SHALL SUBMITA TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.iC D.FOR APPROVAL.PRIOR TO ANY CONSTRUCTION AGNATES WITHIN OR AFFECTING THE RIGHT-OF-WAY,THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS.PRIOR TO INSTALLATION A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD WITH CITY OF TIGARD. IC.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED.INSTALLED,CONSTRUCTED.REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERNASE. I I.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE. 12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE CITY OF TIGARD INSPECTOR AT ALL TIMES. 13,DIMDRAWINGADDITIONALOR DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY .FOR INFORMATION BRAT F R CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS. II.ALL EROSION AND SEDIMENT CONTROL(E,S.CM MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO A. AA 4400601 DMIRK cnRMT GROUND DISTURBING ACTIVITY.ALL E S C.MEASURES SHALL BE MAINTAINED IN G000 REPAIR BY THE CONTRACTOR UNTIL SUCH Pilo TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING A! IB.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE CITY OF TIGARD ENGINEERING ZATO ENGINEER STOSO NA STRAT DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS. Aq cM:�Ri CAS,,LTD. 1B.ALL CONSTRUCTOR OPERATIONS.INCLUDING THE WARMING UP,REPAIR.ARRIVAL DEPARTURE OR RUNNING OF TRUCKS,EARTH 211 LcuT vneER.Ru sNBmMw tan MMM1rt 1M MOVING EQUIPMENT.CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE Y TIME PERIOD APPROVED BY THE CITY OF TIGARD. KC� IRKeP. ` IBTSTT°A'ano-“miRo^NI Ca ccrs2[�unnuwloPaiErEq� 6KEI I tie a NMYMM MATCH TO Slit 5 �r. )11M POLE/ C:1011 all P1 MOPEDx1P l � B1Lex 1 IS1.I ul tl k AX µ.n4 POLE( :I12'0‘3093 VJIE:1'.x0' PIA 3h. R W PFwxo xnra o� 2� EUR 4-115452' — 35 R/W .e. eu -S IMMOzayo ae .eu5 ENGINEERING FRIA rw x .vo II + Mdn a55 h 8.03 P4 • S •, 2'Www w 0r0 : 811 A935 loolow GI w.n.4 _—_ w.c:4'•w' e.r Omwon No OM .11000I oon �n � Pa[t [nczr 1'.4r nr0RxmrEu. cR 14T044 044M4, P: PROP Mnrtx NUMBER inynnitinWn BELOW Mr.''BwI PB ei4.V_O,OR B CRo� MATCH TO SHT 4 ,„ R. ,.,.o...ens-