Loading...
Plans OFFICE COPY OFFICE COPY n OFFICE COPY /7' ii II i II ATM & _ _ ALCOVE (-i I 7 T TO REMAIN I i I I II it )- c j °' u" 0 II t' O I )) Q m8. � �-11 � ❑ w� a) w� � o0 DEMO INTERIOR WALLS, REMOVE EXISTING' Z 0 o Q FLOORING, POLISH & SEAL CONCRETE // g �� PATCH AND PAINT GYP WALLS r W Q c \ LL ,- o 11 \1 N a w / / / OFFICE COPY L___ // fi � / CITY OF TTGAxr,.. 2 grvrTWED FOR CODE COMPLIANCE 0 Approved: j] Q N J n I I I Ake TC: [ l w ti ZZ ermit #: d+-O n1Z� U U 0' 2 4 8 16' IX \i Q J Address: O (n O -1 0 Ad -10 .. : , 4' Iy�. PLAN 1SS J t DEMO � U 1 Suite #: U X ZO I 1/4" = 1'-0" Date: 1Q..sal z_ Q (E) GYP Z • Y } F' Z Cr) 0 O = Z IL" C.) 0 w NEW ACT GRID @ 9'-0" o j J tL w Q (E) SPRINKLERS ce wo d Oz m TYP. MODIFY AS u_ = w REQUIRED FOR rn 0 to 0 c i ;6 HEIGHT ® VALIDITY OF PERM:T w g W ti r 1 THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION ® DOCUMENTS AND OTHER RELOCATE DATA SHALL NOT PREVENT A02 EXISTING �� THE CODE OFFICIAL FROM LIGHTS REQUIRING THE CORRECTION — OF ERRORS. OSSC 105.4 PLANS SCALE: 1!4" = 1'-0" DATE:10/09/2020 OCEILING PLAN e REVISIONS: 1/4" = 1'-0" IN-STORE CLOSURE SOW/RESET REQUIREMENTS SITE LOCATION: 111112 REQUIREMENTS FOR THE REMOVAL OF A BRANCH FACILITY WHEN REMOVING A BRANCH FACILITY FROM A STORE THE FOLLOWING CONDITIONS MUST BE MET, May Auto Sales UNLESS OTHERWISE NOTED IN THE AGREEMENT: ;ityPublic " USed`a,deae` • REMOVE ALL INTERIOR BANK WALLS; REPAIR, PATCH, AND PAINT REMAINING WALLS TO MATCH Nf Course V 1' > N M O STORE. The Green Planet Q .� -1 o O U • REMOVE ALL BANK EQUIPMENT, FIXTURES, COUNTERS, DESKS, AND ATM (IF APPLICABLE). 0 (n w r' O • REMOVE OR RELOCATE ELECTRICAL PANEL IN THE LICENSED PREMISES. CUT BACK CONDUIT TO 15570 SW Pacific (��Hwy,Tigard,OR... W (1ol O _ ABOVE CEILING. a. and P._: (t -0 zoo a • REPAIR OR REPLACE CEILING TILE TO MATCH EXISTING CEILING TILE IN THE STORE (VERIFY 99.v �/ coZ to> Outlet CEILING TILE COLOR WITH STORE DIRECTOR) >- • BALANCE LIGHTING IN THE LICENSED PREMISES. W co w p • REMOVE PHONE PANEL IN THE LICENSED PREMISES. CUT BACK CONDUIT TO ABOVE CEILING. LL r re— ci_ UI • REMOVE SECURITY PANEL AND CAMERAS. co ce N w • IF LICENSEE HAS INSTALLED HVAC UNIT, REMOVE THE HVAC UNIT AND CAP PENETRATIONS. � • IF LEAVING ATM IN A NEW LOCATION, AN APPROVAL AND ATM LICENSE AGREEMENT BETWEEN THE 9 LMM',t'f=: p PARTIES WILL BE REQUIRED. • REMOVE TILE OR CARPET IN THE LICENSED PREMISES AND REPLACE WITH STORES FIELD FLOORING (VERIFY MATERIAL WITH STORE DIRECTOR) 2O • REMOVE INTERIOR SIGNAGE. REPAIR, PATCH, AND PAINT TO MATCH THE STORE PROJECT DESCRIPTION: >- • REMOVE NIGHT DROP BOX. REPAIR, PATCH, AND PAINT (VERIFY PAINT COLOR WITH STORE Q N N DIRECTOR) DEMOLITION OF EXISTING APROX. 370 SF w • '' REMOVE LIGHT BOX. REPAIR, PATCH, AND PAINT WALLS AS NEEDED. w • REVIEW AND FOLOW REQUIREMENTS WITH THE MAINTENANCE SPECIALIST AND STORE DIRECTOR WELLS FARGO BRANCH INSIDE OF �REGARDING SCHEDULE, SAFETY, WORK HOURS, STAGING AND CONSTRUCTION THAT MAY APPLY. SAFEWAY, PATCH AND PAINT TO 0 ct RETURN TO "VANILLA SHELL" o Z • (REFER TO THE "BANK PRECONSTRUCTION CONFERENCE FORMAT" AND "CRITERIA FOR BANK INCLUDING NEW ACOUSTIC TILE GRID Ti Q O l2 DRAWING SUBMITTAL, APPROVAL, & CONSTRUCTION" DOCUMENTS. CEILING. CD 0 0 re • SAFEWAY WILL REQUIRE A PROJECT PLAN DETAILING THE SCOPE OF WORK FOR APPROVAL, A z F= D w DETAILED SCEDULE FOR APPROVAL, CONFIRMATION IF A DUMPSTER IS NEEDED ON SITE, AND Y F w COMPLETION PHOTOS ONCE THE SPACE IS RETURNED. Oz = z 0 F_ U �U J _I L w Q , O 0 0 O Q W f1 O S9 N FINISH SCHEDULE: U U N W N _ r Z O ii) � 4t • FLOOR: POLISH SEAL CONCRETE TO MATCH w � w m • BASE:4" JOHNSONITE #44 "DARK BROWN" m � a °' U • CEILING: ARMSTRONG OR USG WHITE ACT W/ WHITE GRID CEILING. (ASTM C635, C636) • WALLS: PATCH AND PAINT SAFEWAY "CHAMOIS" AO 1 COVER SCALE: DATE:10/09/2020 REVISIONS: