Loading...
Permit Support Document FOR OFFICE USE ONLY— SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED _ JUL 132020 FROM: j OZ1'l CITY OF TIGARD COMPANY: ._.�' ovv� ln BUILDING DIVISION PHONE: L� 17/ I/0 9 69 3/ BY: RE: /(a74f 5G.4J64qi e:Pwsr" S:r fl')ST z-ot i - 60 z 31 e Address) (Permit Number) 7c7 C (. TT f 53 2 y 71) (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. )o Other(explain):<5e� � REEMARKS: FO O FILE USE ONLY �I� Routed to Pe Technician: Date: ta k� ZOZ� Initials: fA 1 Fees Due: Yes ❑No Fee Desc 'ptio : Amount Due: t CD/Icel..) Special Instructions: Reprint Permit (per PE): ❑Yes No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions 061316.doc RECEIVED JUL 13 2020 /175-/�/9_ 7 CITY OF /Gr 79/ Sic) a'uA/s /`f."7U BUILDINGLDING DIVISION GD•9T j Plan 3410 • Furnace now in attic-old furnace room in garage converted to water heater room • Fireplace different dimensions • Windows flanking fireplace reduced in size from 2-6 5-0 to 2-0 2-0 • Great Room rear-facing windows converted from 3 individual windows into an 8-0 5-0 XOX(this would be same for daylight basement rear wall window also) • Exterior door leading to patio off Great Room converted from swing door to 6-0 6-8 SGD. Patio shifted 39" right and grew 24"to accommodate new SGD and kitchen window o Since SGD, changed patio platform to a 12"x 42" step (where necessary,depending on topo) • Master Bathroom full wall between tub and shower converted to glass wall above tub platform • Master Bedroom rear-facing windows converted from 6-0 5-0 SL to an 8-0 5-0 XOX • All reed glass removed FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 14 . " Transmittal Letter 1 t:,A i n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED JUL 2 0 2020 FROM: Mts r-r., 5 CITY OF TIGARD BUILDING DIVISION COMPANY: - MtTc r ra.,csvN PHONE: 1 LkO -k cj 31 Br RE: 1 (5-1ct 5w Sli-v'1.4n5.10\..9... QJDCICIAa 15 Zfxck•-6OZ51 (Site Address) (Permit Number) LA—C k33 (Project name or subdivision halm and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations`.� Engineer's calculations. Other(explain): � v, REMARKS: AI) ��2. ��!L ' �U11�D 1 U- W `t vC['- -1( -3 FORO FICE USE ONLY Routed to Permit Technic' : Date: I% 14 wZb Initials: Fees Due: El Yes No Fee Des pti n: Amount Due: )2/ Special Instructions: Reprint Permit(per PE): ❑Yes No ❑ Done Applicant Notified: Date: Initials: 1:\Building\Forms\TransmittalLetter-Revisions_061316.doc FOR OFFICE USE ONLY— SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1111 S Transmittal Letter T I GA R I) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED JUL 2 0 2020 FROM: r\ 5 CITY OF TIGARD BUILDING DIVISION COMPANY:r M Cr.c r atsv� PHONE: "\ l\ (AO ck 5°1 31 By RE: 1 (6161 l 5 W SlLvti` t1n L Qpctq a `f ( Z ,-06z51 (Site Address) (Permit Number) k_R. �-t St33 ( roject name or subdivision e and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculatio%t, Engineer's calculations. Other(explain): REMARKS: A-D '-pla\A/�D 45w/1n ►1 -t(t 3 I?.o FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑No Fee Description: Amount Due: Special Instructions: Reprint Permit(per PE): ❑ Yes ❑No ❑Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_0613I 6.doc FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Ili . , Transmittal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov TO: DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED JUL 1 3 2020 FROM: QYYt S CITY OF TIGARD n� BUILDING DIVISION COMPANY: crV✓i PHONE: 7/ t 2 g 6 3/ RE: /(074/ 50.061-/in 671-5-r Sr 0161 Z-ar g - 602,31 e Address) (Permit Number) N ` yet C &IF(53 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. 7) Other(explain):.56 4-77—i1-C .Q %— &3o/Oc.-}—nr 7O,t/ REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑No Fee Description: Amount Due: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: 1:\Building\Forms\TransmittalLetter-Revisions_061316.doc Plan 3411i • Furnace now in attic-old furnace room in garage converted to water heater room • Fireplace different dimensions • Windows flanking fireplace reduced in size from 2-6 5-0 to 2-0 2-0 • Great Room rear-facing windows converted from 3 individual windows into an 8-0 5-0 XOX(this would be same for daylight basement rear wall window also) • Exterior door leading to patio off Great Room converted from swing door to 6-0 6-8 SGD. Patio shifted 39" right and grew 24" to accommodate new SGD and kitchen window o Since SGD, changed patio platform to a 12" x 42"step (where necessary, depending on topo) • Master Bathroom full wall between tub and shower converted to glass wall above tub platform • Master Bedroom rear-facing windows converted from 6-0 5-0 SL to an 8-0 5-0 XOX • All reed glass removed