Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
PI ST2-o zo - O O 2 � e A vic_ /yo to Si C-772, ./ ST Dianna Ornelas From: UB Online Sent: Monday, November 16, 2020 7:57 AM To: #Building Permit Technicians; mikem ezpermits.biz Cc: Allyson Armstrong Subject: FW: 14040 SW Fern fixture count Attachments: CCE_000001.pdf Per the most recent worksheet,this address will not need an increase in meter size since the current location has a one inch meter. Kind Regards, Jill (she/her/hers) Ur.++IN A WOW' Jill U_ VW BE+yf►e. ; " City of Tigard -Utility Billing •Ign— Senior Accounting Asst GAKD (888)826-7211 Payments (503)718-2460 U6 Main jillb@tigard-or.gov (503)718-2494 3E ICINC 13l25 SW Tgard5ORH Blvd.all 97223 From: mikem ezpermits.biz<mikem@ezpermits.biz> Sent:Tuesday, November 10, 2020 12:18 PM To: UB Online<UBOnlinepay@tigard-or.gov> Subject: 14040 SW Fern fixture count Caution! This message was sent from outside your organization. The next increase is 2 fixtures / 5 points. The new point total is 30. Most Sincerely Mike Montgomery MAC Consultings LLC, dba Simpl Home Designs/ EZPermits permit expeditor 1 • Residential/Commercial Design Consulting 4931 SW 76th Ave., PMB 211 Portland OR 97225 tt(503)515-6495 8(503)-719-4825 mikem(a�ezr ermits.biz http://www.ezpermits.biz The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material.Use disclosure,distribution,or reproduction if this message by unintended recipients is not authorized and may be unlawful.If you received this in error,please contact the sender and destroy any copies of the document DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 2 Water Meter Fixture Unit Worksheet for Additions/Remodels/ADUs Please complete the following information: Customer Name: MK Homes LLC Mike Bourtauin Service Address: Street/Suite#: 14040 SW Fern St., l igard, OH 97223 City: State: Zip: Phone Number: (503) 522-7566 Email: Mike.mkhomes@gmail.com Please fill in the number of each fixture you currently have. Please fill in the number of fixtures you propose to add. Multiply the quantity by the point value to arrive at the current Multiply the quantity by the point value to arrive at total. the proposed total. Fixture Unit Current Point Current Proposed Point Proposed Quantity Value Total Addition Value Total Bar sink x 1 = x I = Bidet x 1 = x 1 = Clothes washer 1 x 4 = 4 x 4 = Dishwasher 1 x 1.5 = 1.5 x 1.5 = Hose bib 1 x 2.5 = 2.5 x 2.5 = Hose bib,each 1 x 1 = 1 x 1 = Kitchen sink 1 x 1.5 = 1.5 x 1.5 = Laundry sink 1 x 1.5 = 1.5 x 1.5 = Lavatory 2 x 1 = 2 x 1 = Water closet, 1.6 GPF 1 x 2.5 = 2.5 x 2.5 = Bathtub/whirlpool x 4 = x 4 = Shower stall . x 2 = x 2 = Bath/shower combo 2 x 4 = 8 x 4 = Current Points: 24.5 Proposed Increase: Current Points +Proposed Increase= 24.5 =New Total Points =Required Meter Size 5/8 Meter Sizes: 1 to 30 points=5/8" 30.5 to 37 points='/4" 37.5 and over points= I" New Meter Size Needed for New Total Points: Cost: $ (see page l) Current Meter Size per Utility Billing: 5/8 Cost: $ (see page 1) New Meter Size Cost minus Current Meter Size Cost= $ (This is Your Cost to Increase Meter Size Due to Additional Fixture Units) ************************************************************************************* FOR OFFICE USE ONLY Current Meter Size Confirmed with UB Signature of UB Representative Date I:/Building/Forms/WaterMeters_070119_1dd.doCX Page 2 Dianna Ornelas From: #Building Permit Technicians Sent: Thursday, November 12, 2020 6:29 PM To: UB Online Cc: Allyson Armstrong; #Building Permit Technicians Subject: RE: 14040 SW Fern fixture count Hi Jill, The work described is"re-arranging a bathroom and laundry room" so the latest fixture worksheet appears to fit the description of work as in the end, they will still have (2) bathrooms, but one of the bathrooms will have an added (1) bath/shower and (1) lay. I confirmed with the recent property listings that this property has (2) bathrooms. I recommend that we accept the latest worksheet and the inspectors can view the work in the field once the permit is issued. If they find anything different, we can revisit the count with the applicant. And, since your records show that this dwelling is already on a 1" water meter since 1989, they don't need to have the meter upsized as the totals after the new fixture additions will still only require a 5/8" meter. Thank you. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: UB Online <UBOnlinepay@tigard-or.gov> Sent:Tuesday, November 10, 2020 4:22 PM To: #Building Permit Technicians <TigardBuildingPermits@tigard-or.gov>; Allyson Armstrong <AllysonA@tigard-or.gov> Subject: FW: 14040 SW Fern fixture count Hey Folks, I have some concerns with this addition. The house has a 1 inch meter since 1989. Every time I ask for a corrected fixture count, ie. use lavatory not bar sink,the fixtures change, ie.two bath/shower combos are now one shower stall and one bath. I think the full plans need to be reviewed or an inspection of the property. The original and the additions. Kind Regards, Jill (she/her/hers) 1 ;di A W0fiLi. Jill tiott.�t4U0i3Eplry ,c s. City of Tigard-Utility Billing -Ili ° Senior Accounting Asst i a P . z (888)826-7211 Payments (503)718-2460 UB Main ': jµllb@tigard-or.gov (503)718-2494 OE ICI Tiglard25,5ORH9 HallBlvd. 23 d. From: mikem ezpermits.biz<mikem@ezpermits.biz> Sent:Tuesday, November 10, 2020 12:18 PM To: UB Online<UBOnlinepay@tigard-or.gov> Subject: 14040 SW Fern fixture count Caution!This message was sent from outside your organization. The next increase is 2 fixtures / 5 points. The new point total is 30. Most Sincerely Mike Montgomery MAC Consultings LLC, dba Simpl Home Designs/ EZPermits permit expeditor Residential/Commercial Design Consulting 4931 SW 76th Ave., PMB 211 Portland OR 97225 ":"(503)515-6495 a (503)-719-4825 mikem(a)ezpermits.biz http.://www.ezpermits.bfz =l ir The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material.Use disclosure,distribution,or reproduction if this message by unintended recipients is not authorized and may be unlawful.If you received this in error,please contact the sender and destroy any copies of the document 2 Dianna Ornelas From: UB Online Sent: Tuesday, November 10, 2020 5:48 PM To: #Building Permit Technicians; Allyson Armstrong Subject: FW: 14040 SW Fern fixture count FYI—I understand why this gentleman is stressed but I cannot approve a form that is consistently incorrect. Kind Regards, Jill (she/her/hers) r+i A Weil,l. ; Jill „tow cAmsragyr,,,, > " City of Tigard -Utility Billing "^EGG 1 Senior Accounting Asst (888)826-7211Payments { (503)718-2460 UB Main jiilb©tigard-or..gov (503)718-2494 Tigard, ORHall 97223d From: mikem ezpermits.biz <mikem@ezpermits.biz> Sent:Tuesday, November 10, 2020 5:35 PM To: UB Online<UBOnlinepay@tigard-or.gov> Subject: RE: 14040 SW Fern fixture count Cautions This message was sent from outside your organization. Jill - I have never had someone ask me so many questions about fixtures. I know that the first time I did the form, it was wrong, but I don't know how much more clear I need to be. Yes, 1 bathroom sink and 1 tub shower. Please process the application. Thank you for assistance. Most Sincerely ..41414k----4401\ Mike Montgomery MAC Consultings LLC, dba Simpl Home Designs/ EZPermits permit expeditor 1 Residential/Commercial Design Consulting 4931 SW 76th Ave., PMB 211 Portland OR 97225 (503)515-6495 M- (503)-719-4825 mikem@ezpermits.biz htto://www.ezDermits.biz dr The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material.Use disclosure,distribution,or reproduction if this message by unintended recipients is not authorized and may be unlawful.If you received this in error,please contact the sender and destroy any copies of the document From: UB Online<UBOnlinepayPtigard-or.gov> Sent:Tuesday, November 10, 2020 4:15 PM To: mikem ezpermits.biz <mikem@ ezpermits.biz> Subject: RE: 14040 SW Fern fixture count To confirm, the addition is one bathroom sink (lavatory) and one bathtub/shower combo? Kind Regards, Jill (she/her/hers) /A A WOFki,; Jill i40 2011 CAN BEA irrr,,`: "' City of Tigard-Utility Billing ° + 4 Senior Accounting Asst 't WARP (888)826-7211 Payments (503)718-2460 UB Main jdIb@ tigard-or.gov 4 (503)718-2494 h.� Tigard,iard25 s97223 OR Blvd.W Hall From: mikem ezpermits.biz<mikemCc ezpermits.biz> Sent:Tuesday, November 10, 2020 12:18 PM To: UB Online<UBOnlinepay(a)tigard-or.gov> Subject: 14040 SW Fern fixture count The next increase is 2 fixtures / 5 points. The new point total is 30. Most Sincerely 2 Mike Montgomery MAC Consultings LLC, dba Simpl Home Designs/EZPermits permit expeditor Residential/Commercial Design Consulting 4931 SW 76th Ave., PMB 211 Portland OR 97225 ¶(503)515-6495 (503)-719-4825 mikem cDezpermits.biz http://www.ezpermits.biz The information transmitted is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material.Use disclosure,distribution,or reproduction if this message by unintended recipients is not authorized and may be unlawful.If you received this in error,please contact the sender and destroy any copies of the document DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 3