Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2020-00259 T I G ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/22/2020 Parcel: 1 S125DC00500 Jurisdiction: Tigard Site address: 9655 SW 74TH AVE Project: Leet Subdivision: BOULEVARD HEIGHTS Lot: 27 Project Description: Demolition of 1,400 sf dwelling and 400 sf garage and driveway on public sewer. SDC CREDITS FOR TRANSPORTATION, PARKS AND SEWER MAY APPLY TOWARDS NEW CONSTRUCTION. Contractor: HALS CONSTRUCTION INC Owner: LEET, BRIAN L&ANGELA K 20666 S HWY 213 7498 SW CEDAR WAY OREGON CITY, OR 97045 PORTLAND, OR 97223 PHONE: 503-656-4999 PHONE: FAX: 503-656-5961 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 12/22/2020 $377.90 Demolition Occupancy Grp: Occupancy Load: Info Process/Archiving-Sm$0.50(up to 12/22/2020 $3.50 Dwelling Units: 0 11x17) Stories: 0 Height: 0 ft Erosion Control w/Development 12/22/2020 $80.70 Bedrooms: 0 Bathrooms: 0 Value: $20,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $462.10 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090.1- You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: dr' 1 i1 , l, r � Permittee Signature: ,eu,- ���......__XYY !!�� Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application . d '-?-�-�Cmt Residential !_ L 11 r> FOR OFFICE t 51.ov1.v DEC 0 8 ZL,.� tteccived IN 4 City of Tigard Date/By, 121 i.-I'2_c Permit Pent No.:(>>td.ke�,r'e'-G' -ter1. CT 13125 SW hall Blvd..Tigard,OR 97223 CITY OF T IGAR(_ Plan Review Othar Permit Phone: 503.718.2439 Fax 503.598.1960 IJILD:NC DI' I '(_ DatrAty, TIGARD Inspection Line: 503.639.4175 Date Ready/By: 1111 } tura GI See Page 2 for Internet- www.ti rd-or.goy Notified/method. 1Z12 ga g Z-/Z-Q,(J[ , Supplemental laformadon I t 1 n 1 L 0.3g ( '1 ram. -'i ' ' r _ :>+ .,TYPE of WORK ?s! y '' ,!REQUIREDDAI'A:I-AND2-FSMILYDWELLING'.3^ ❑New construction ❑Demolition Permit fees"arc based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the s `- - 11 CATEGORY O F CONSTRUCTION . ' work indicated on this application. ® I-and 2-family dwelling ❑Commercial/industrial Valuation: $ —20,000 ❑Accessory building ❑Multi-family Number of bedrooms: 3 ❑Master builder ❑Other: Number of bathrooms: I _ JOB SITE INFORMATION AND LOCATION -- Total number of floors: I and partial basement Job site address: 9655 SW 74th Ave New dwelling area: square feet City/State/ZIP: Tigard/OR/97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Covered porch area: square feet Cross street/directions to job site: SW 741h and SW Shady PL in Metzger Dcck area: square feet Other structure area: square feet -REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: N/A Lot no.: Permit fees'are based on the value of the work performed. Tax map/parcel no.: Tigard- 1 S 125DC00500/WA County-R231939 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the '' ° ,=,-DESCRIPTION OF WORK =,'x s'`;' work indicated on this application. Demolition of existing house and driveway area.Current house is appx 1,400 sq feet Valuation: S with a appx 400 sq foot garage.Current house is on sewer Existing building area: square feet This work was in prior Sensitive Lands Reviews app w(figard New building area: square feet ® PROPERTY..OWNER , ,' ,'-.r , 0 TENANT; i Number of stories: Name: Brian and Angela Leet Type of construction: Address: 7498 SW Red Cedar Way Occupancy p y groups: City/State/ZIP: Tigard/ORJ97223 Existing: Phone:( 503 )270.7311 Fax:(503 )928 4103 New: ®^APPLICe$NT_ , .;© „ :t CONTACT PERSON BUILDING PERMIT FEES*', Business name: . ,. ,•* `.!. media refwoofeesabea.,kr-, Structural plan review fee(or deposit): Contact name: Brian Leet FLS plan review fee(if applicable): Address: 7498 SW Red Cedar Way City/State/ZIP: Tigard/OR/97223 Total fees due upon application: Amount received: Phone:( 503 )270.7311 Fax: :(503 )928.4103 E-mail: brian a truluma.cum ;.P►IOTOVOLTAIC SOLAR PANEL FEES'"''+ Commercial and residential prescriptive installation of ,,,a_ - ( -;,1�, CONTRACTOR;`'' 4,- y ',•.' ti; roof-top mounted PhotoVoltaie Solar Panel System. Business name: Hal's Construction Submit two(2)sets of roof plan with connection details and tire department access,along with the 2010 Oregon Address: 20666 S Hwy 213 Solar Installation Specialty Code checklist. City/State/ZIP: Oregon City,OR 97045 Permit Fee(includes plan review $180.00 Phone:( 503)656.4999 Fax:(503 )656.5961 and administrative fees): CCe lie.: 33434 State surcharge(12%of permit fee): $21.60 Total fee due upon application: $201.60 Authorized signature' This permit application expires if a permit is not obtained y/ry ,*J) /) within 180 days after it has been accepted as complete. Print name Date: (L"/(/ ��"rf'"'.^'" *Fee methodology set by Tn-County Building Industry Service Board. l:\Budding\Permits\BUP-RESPermitApp doe 02/24/201 I 440.4613T(I I/02/COM/WEB) City of Tigard 71COMMUNITY DEVELOPMENT DEPARTMENT 4 T I G A R D Building Permit Review — Residential Building Permit #: f3UP 2-o2-0 - Oa Zsej Site Address: 9655 SW 74th ave Project Name: I_•e �- /Ytz Lot #: Planning Review Proposal: Demo only of current house and existing driveway 2 Verify address/suite #active in Accela. ❑ In River Terrace: a No ❑ Yes, River Terrace Review Addendum Sir Plan Elements: ®Erosion Control gil copies of site plan on 8-1/2"x 11"or 11 x 17"paper 2etained trees with drip line and tree protection measures s�LI rawn to scale(standard architect or engineer scale) [NlFootprint of new structure(including decks) and FFE !1 orth arrow ❑Utility locations&easements(required for new and additions) Vii to address,project or subdivision name and lot number ❑Sidewalk/driveway approach A.plicant information(name and phone number) ❑Location of wells/septic systems IS .t dimensions and building setback dimensions O ❑Street tree size,type and location quare footage of buildings to be demolished ❑Street names Existing structures on site ❑Comer elevations (2'contours if more than 4'differential i"Tfi rt area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced? ❑Yes o impervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? EYes No II Clean Water ervices—Service Provider Letter (lot platted prior to 9/10/1995): Required: Yes,applicant was notified ❑ No Received: Yes ❑ No a Water Meter Fixture Unit Worksheet—Addi ons,Remo els and ADUs Required: ❑ Yes,applicant was notified No Received: E Yes .,3lo rin SDC Exemption for ADU applied for: E Yes No Received: 17 Yes ' No Q Public Facilities Improvement(PFI) Permit: Required: ❑ Yes,applicant was notified Permit: _ lied For: ❑ Yes ❑ No,stop intake IX Land Use Case #: SLR2020-00003 Ll3' Zoning: .e—L t' Required Setbacks: Front: Rear: Side: Street Side: Garage: DA Building Height: Max. Height: Actual Height: DA Landscape Area: % D Lot Coverage Max: 0/ Entrance et back no more than 8'from street-facing wall ❑ Parallel t eet or offset 45 degrees or less Windows ❑ Minim %of area of all street-facing facades Garage ❑ Garage door is be ' •dest street-facing wall �\ Yes ❑ No,one of the following is met: E Door extends no more 'from wall ere is a covered porch extending beyond garage. ❑ Door extends no more than 5'fr and there is a 12 sq ft.window above garage on 2'd floor. ❑ Garage door width is ❑ 1 ' ess ❑ 50%or f facade ❑ 60%or less and includes 7 of following: ❑ Covered porch Recessed entrance ❑ Wall of se 1'Roof eave ❑ Roof offset E Fire s ' es ❑ Lap Siding ❑ Roof pitch 0 Gable,hip, mbrel roof ❑ Dormer - ccent siding ❑ Window trim 0 Window recess ❑ Window pr tion ❑ Balcony 1'il. isual Clearance , ►S rban Forestry Plan /�S sitive Lands: I4 Yes ❑ No Type: 1l e4le r�Ara CoLor- nditions met prior to issuance of building permit Cl Notes: 0 Approved By Planning: MB Date: 12/16/2020 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved 1:\Building\Forms\B1 dgPenn itRvw_RE S_1224I 9.docx Building Permit Submittal Original Submittal Date: /L/d/ZO Site Plans: # 3 Building Plans: # A//� Building Permit#: ,® Enter building permit#above. Workflow Routing: IEP Planning ,Engineering Permit Coordinator ❑ Building Workflow Sign-off: r ' Sign-off for Planning(include notes from planning review) Route Application Documents: 0 Engineering: (1) copy of permit application, (1) site plan, (1) building plan and original plan review routing form. ❑ Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: /� By Permit Technician: ..<dT �r7.4-.., 4_---1 Date: /2-/z-Vz ' Engineering Review E Slope at building pad: /5Ip E Conditions "Met"prior to issuance of building permit M A..' I N;asements (encroachments) per engineering conditions of approval and plat ./a+_ [ 'Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ErNo Assess Water Quantity Fee in-lieu: ❑ Yes Er No / LIDA Facility on lot: ❑ Yes Er No I/ Final Plat Recorded: $1.A-- 0 NOT Approved by Engineering: Date: Notes: Qv-Approved by Engineering: //r-e-e„fId•-tZ/c,e41 Date: le-4WLWw Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Permit Coordinator Review AConditions "Met"prior to issuance of building permit Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: al SDC Exemption: ❑ Received Does not app a1 SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes :7N/A Tigard Trans SDC: 0 Yes /A Parks SDC: 0 Yes LIDA ❑ Yes N/A OK to Issue Permit _ Approved by Permit Coordinator: _ C:: Date: P/-2//2) {� 1:1Building\Forms\BldgPermitRvw_RES_122419.docx Dianna Ornelas From: #Building Permit Technicians Sent: Tuesday, December 22, 2020 4:06 PM To: Brian Leet Subject: BUP2020-00259 - Leet - 9655 SW 74th Ave. Attachments: BUP2020-00259.pdf Hello Brian, This permit is ready to issue and the balance due is$462.10 (see attached invoice). The fees can be paid online at https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number BUP2020-00259 under the Building tab. Please email the permit technicians at TigardBuildingPermits@tgard-or.gov once the fees are paid so that we can issue the permit and make it available for pick up. After the permit has been issued, inspections can be scheduled online at http://inspections.tigard- or.gov/WebOnlinelnspections by searching for the permit record number BUP2020-00259. Here is a list of tasks and inspections in order that you will need to complete for this permit: • Install erosion control measures and then schedule a code 750 Initial erosion control—this inspection by Clean Water Services must 'PASS' before moving to next step. • Begin demolition work, cap public utilities and remove all debris and then schedule a 798 Final erosion control— this inspection by Clean Water Services must 'PASS' before moving to next step. • Schedule a code 299 Final inspection for inspection by building inspector to confirm all utilities are capped and all debris has been properly removed. Thank you and please let me know if you have any questions. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct j 503-718-2439 Permits t