Loading...
Permit CITY OF TIGARD BUILDING PERMIT . ' COMMUNITY DEVELOPMENT Permit#: BUP2020-00242 T-G f;A R O 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/16/2020 Parcel: 1S135AB01003 Jurisdiction: Tigard Site address: 10300 SW GREENBURG RD 275 Project: Spec Space Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Interior vacancy improvements of approximately 4,985 sf.Work to include demo,new walls,doors,relites, casework and finishes Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-692-9002 PHONE: FAX: 503-692-9008 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IS Permit Fee-Additions,Alterations, 12/15/2020 $789.69 Demolition Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 12/15/2020 $94.76 Dwelling Units: 0 Plan Review 12/01/2020 $513.30 Stories: 0 Height: 0 ft Address Fee-per lot/suite(up to first 20) 12/01/2020 $50.00 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 12/15/2020 $103.00 Value: $58,000 Plan Review-Fire Life Safety 12/15/2020 $315.88 Info Process/Archiving-Lg$2.00(over 12/15/2020 $8.00 11x17) Floor Areas: Tigard CET-Non-Residential-Admin 12/15/2020 $23.20 Tigard CET-Non-Residential-AH 12/15/2020 $556.80 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,454.63 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090./// You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: rw lA t-x n �p(�/l,. n n_ \�rhl Permittee Signature: cn 'ic �S ��T�T...000111 UUUddd���JJJ lx/ILL.XY��Caalll 503.639.4175 by 7:00 a.m.for the next available inspection date. l.. This permit card shall be kept In a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. r, 1 Building Permit Application 'B- It 125 i2.0 Commercial RECEIVED FOR OFFICE USE ONLY 111 1 ' City of Tigard Received Date/By: 1r13bi2o2o Permit No.: 8UP2p26) 002_42_ • 13125 SW Hall Blvd.,Tigard,OR 97223 N O V 2 J 2020 Plan Review m Phone: 503.718.2439 Fax: 503.598.1960 Date/By: jea,Plan L.3.3, Other Permit: TIGARD Inspection Line: 503.639.4175 �:-�'-y i ARE) Date Read/B : q.,, �/�r{r,J, J 0 See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISION Notified/Method:l 21/5J K� !yJ` � Supplemental Information ti_:IM Fl—I L- Ie'1-t-14 TYPE OF WORK REQUIRE DATA:1-AND 2-FAMILY DWELLING 0 New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ElI-and 2-family dwellingValuation: $ El Number of bedrooms: ElAccessory building El Multi-familyEl Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:1 Lincoln-10300 SW Greenburg Road New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:275 Project name:Vacancy Space Prep Covered porch area: square feet Cross street/directions to job site:Project located north of SW Oak Street, Deck area: square feet south of SW Locust Street and east of Greenburg Road Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Work to include demolition,new walls,doors,relites,casework,and finishes Valuation: $$58,000.00 Existing building area: 4985 square feet New building area: 4985 square feet ® PROPERTY OWNER ❑ TENANT Number of stories: 1 Name: Shorenstein Type of construction: I-B Address:5335 Meadows Rd.,Suite 275 Occupancy groups: City/State/ZIP:Lake Oswego,OR 97035 Existing: B Phone:(503)412-4844 Fax:( ) New: B 0 APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name:Mackenzie (Please refer to fee schedule) --- Structural plan review fee(or deposit): %J ie Contact name:Kelly Battaglia FLS plan review fee(if applicable): Address:1515 SE Water Ave Suite 100 City/State/ZIP:Portland,OR 97214 Total fees due upon application: Phone:(503)224-9560 Fax:: (503)228-1285 Amount received: E-mail:kbattagliaAmcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Russell Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:20915 SW 105'Avenue SolarInstallation Specialty Code checklist. City/State/ZIP:Tualatin,OR 97062 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)692-9002 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:58918 Total fee due upon application: $201.60 Authorized signature: )/J//qICJ This permit application expires if a permit is not obtained C within 180 days after it has been accepted as complete. Print name:Kelly Battaglia Date:11/24/2020 * Fee methodology set by Tri-County Building Industry Service Board. 1 91 r�3 l:A Building\PennitsvBUP-COM PemritApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) City of Tigard ■ COMMUNITY DEVELOPMENT DEPARTMENT 'PI T c R D Building Permit Review — Commercial - No Land Use Building Permit #: B u P LO2J -W 2 L!-2- Site Address: 10300 SW Greenburg Rd Suite/Bldg#: 275 Project Name: Spec Space (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Landlord work for spec space; combining former suites 271 & 280 into 1 suite Existing Business Activity: Office Proposed Business Activity: Spec Space ❑s Verify site address/suite# exists and active in permit s stem. ❑s River Terrace Neighborhood: ❑ Yes El No ❑e Zoning: MUE-1 r❑ Permitted Use: U Yes U No CJ Spec Space ❑ Confirm no land use required. ❑ Business License: N/A Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: Approved by Planning: j� Date: 11/25/20 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: ///25/'d2O Site Plans: # ,_3' Building Plans: # J Building Permit#: Enter bull ermit# above. Workflow Routing: 'Planning I Permit Coordinator luilding Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: Et-Building: original permit application,site plans,building plans, engineer and beam calculations an. trust details,if applicable,etc. Notes: / � / " By Permit Technician: Date: /�/'mot Ze2 d I:\Building\Forms161dgPermitRvw_COM_NoLandUse_1 11819.docx ,%b so - •.it Coordinator Review ❑ Poe.Poe.Conditio _ "Met"prior to issuance of building permit ❑ Approved, NO • eased: 10E40 Notes: StAI7E1_ Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: _ Revision Notice 2: Date Sent to Apo "• t: Revision Notice 3: Date Sent to ' .plicant: ❑ SDC Fees Entered: W . Co Trans Dev Tax: ❑ Yes II • • Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to I.- . - Permit • . oved by Permit Coordinator: Date: I:1Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx