Permit CITY OF TIGARD BUILDING PERMIT
. ' COMMUNITY DEVELOPMENT Permit#: BUP2020-00242
T-G f;A R O 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/16/2020
Parcel: 1S135AB01003
Jurisdiction: Tigard
Site address: 10300 SW GREENBURG RD 275
Project: Spec Space Subdivision: METZGER,TOWN OF Lot: 9
Project Description: Interior vacancy improvements of approximately 4,985 sf.Work to include demo,new walls,doors,relites,
casework and finishes
Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC
20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC
TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR
SAN FRANCISCO, CA 94104
PHONE: 503-692-9002 PHONE:
FAX: 503-692-9008
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IS Permit Fee-Additions,Alterations, 12/15/2020 $789.69
Demolition
Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 12/15/2020 $94.76
Dwelling Units: 0 Plan Review 12/01/2020 $513.30
Stories: 0 Height: 0 ft Address Fee-per lot/suite(up to first 20) 12/01/2020 $50.00
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 12/15/2020 $103.00
Value: $58,000 Plan Review-Fire Life Safety 12/15/2020 $315.88
Info Process/Archiving-Lg$2.00(over 12/15/2020 $8.00
11x17)
Floor Areas: Tigard CET-Non-Residential-Admin 12/15/2020 $23.20
Tigard CET-Non-Residential-AH 12/15/2020 $556.80
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,454.63
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090./// You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: rw lA t-x n �p(�/l,. n n_ \�rhl Permittee Signature: cn 'ic �S
��T�T...000111 UUUddd���JJJ lx/ILL.XY��Caalll 503.639.4175 by 7:00 a.m.for the next available inspection date. l..
This permit card shall be kept In a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
r, 1
Building Permit Application 'B- It 125 i2.0
Commercial RECEIVED FOR OFFICE USE ONLY
111
1 '
City of Tigard Received
Date/By: 1r13bi2o2o Permit No.: 8UP2p26) 002_42_
• 13125 SW Hall Blvd.,Tigard,OR 97223 N O V 2 J 2020 Plan Review
m Phone: 503.718.2439 Fax: 503.598.1960 Date/By: jea,Plan
L.3.3,
Other Permit:
TIGARD Inspection Line: 503.639.4175 �:-�'-y i ARE) Date Read/B : q.,, �/�r{r,J, J 0 See Page 2 for
Internet: www.tigard-or.gov BUILDING DIVISION Notified/Method:l 21/5J K� !yJ` � Supplemental Information
ti_:IM Fl—I L- Ie'1-t-14 TYPE OF WORK REQUIRE DATA:1-AND 2-FAMILY DWELLING
0 New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
ElI-and 2-family dwellingValuation: $
El
Number of bedrooms:
ElAccessory building El Multi-familyEl Master builder El Other:
Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:1 Lincoln-10300 SW Greenburg Road New dwelling area: square feet
City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet
Suite/bldg./apt.no.:275 Project name:Vacancy Space Prep Covered porch area: square feet
Cross street/directions to job site:Project located north of SW Oak Street, Deck area: square feet
south of SW Locust Street and east of Greenburg Road Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Work to include demolition,new walls,doors,relites,casework,and finishes Valuation: $$58,000.00
Existing building area: 4985 square feet
New building area: 4985 square feet
® PROPERTY OWNER ❑ TENANT Number of stories: 1
Name: Shorenstein Type of construction: I-B
Address:5335 Meadows Rd.,Suite 275 Occupancy groups:
City/State/ZIP:Lake Oswego,OR 97035 Existing: B
Phone:(503)412-4844 Fax:( )
New: B
0 APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name:Mackenzie (Please refer to fee schedule)
--- Structural plan review fee(or deposit): %J ie
Contact name:Kelly Battaglia
FLS plan review fee(if applicable):
Address:1515 SE Water Ave Suite 100
City/State/ZIP:Portland,OR 97214 Total fees due upon application:
Phone:(503)224-9560 Fax:: (503)228-1285 Amount received:
E-mail:kbattagliaAmcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Russell Construction Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:20915 SW 105'Avenue SolarInstallation Specialty Code checklist.
City/State/ZIP:Tualatin,OR 97062 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)692-9002 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.:58918 Total fee due upon application: $201.60
Authorized signature: )/J//qICJ This permit application expires if a permit is not obtained
C within 180 days after it has been accepted as complete.
Print name:Kelly Battaglia Date:11/24/2020 * Fee methodology set by Tri-County Building Industry
Service Board.
1 91 r�3
l:A Building\PennitsvBUP-COM PemritApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
City of Tigard
■ COMMUNITY DEVELOPMENT DEPARTMENT
'PI
T c R D Building Permit Review — Commercial - No Land Use
Building Permit #: B u P LO2J -W 2 L!-2-
Site Address: 10300 SW Greenburg Rd Suite/Bldg#: 275
Project Name: Spec Space
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: Landlord work for spec space; combining former suites 271 & 280 into 1 suite
Existing Business Activity: Office
Proposed Business Activity: Spec Space
❑s Verify site address/suite# exists and active in permit s stem.
❑s River Terrace Neighborhood: ❑ Yes El No
❑e Zoning: MUE-1
r❑ Permitted Use: U Yes U No CJ Spec Space
❑ Confirm no land use required.
❑ Business License: N/A
Exists: ❑ Yes ❑ No, applicant was provided a business license application
Notes:
Approved by Planning: j� Date: 11/25/20
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: ///25/'d2O
Site Plans: # ,_3'
Building Plans: # J
Building Permit#: Enter bull ermit# above.
Workflow Routing: 'Planning I Permit Coordinator luilding
Workflow Sign-off: Sign-off for Planning(include notes from planning review)
Route Application Documents: Et-Building: original permit application,site plans,building plans, engineer and
beam calculations an. trust details,if applicable,etc.
Notes: /
� / "
By Permit Technician: Date: /�/'mot Ze2 d
I:\Building\Forms161dgPermitRvw_COM_NoLandUse_1 11819.docx
,%b so
- •.it Coordinator Review
❑ Poe.Poe.Conditio _ "Met"prior to issuance of building permit
❑ Approved, NO • eased: 10E40
Notes:
StAI7E1_
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant: _
Revision Notice 2: Date Sent to Apo "• t:
Revision Notice 3: Date Sent to ' .plicant:
❑ SDC Fees Entered: W . Co Trans Dev Tax: ❑ Yes II • •
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to I.- . - Permit
• . oved by Permit Coordinator: Date:
I:1Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx