Permit CITY OF TIGARD BUILDING PERMIT
i _ COMMUNITY DEVELOPMENT Permit#: BUP2020-00172
s' Date Issued: 12/16/2020
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 t•t\1\Zt 0`? Parcel: 1 S135DA04600
Jurisdiction: Tigard
Site address: 11161 SW HALL BLVD
Project: Village at Washington Square-Building C Subdivision: 1998-038 PARTITION PLAT Lot: 1-2
Project Description: Building C: Exterior renovation including replacement of siding,windows,doors,stairs and portions of decks.
Contractor: LMC INC Owner: VILLAGE AT WASHINGTON SQUARE
19200 SW TETON AVE LIMITED PARTNERSHIP
TUALATIN, OR 97062 BY CPAH
PO BOX 23206
TIGARD, OR 97281
PHONE: 503-646-0521 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: MF
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 12/15/2020 $1,631.43
Demolition
Occupancy Grp: R-2 Occupancy Load: 0 12%State Surcharge-Building 12/15/2020 $195.77
Dwelling Units: Plan Review 12/15/2020 $1,060.43
Stories: Height: ft DC Provision Review,COM TI-Ping 12/15/2020 $406.00
Bedrooms: Bathrooms: Plan Review-Fire Life Safety 12/15/2020 $652.57
Value: $186,180 Metro CET 12/15/2020 $223.42
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $4,169.62
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet: 1 Special Inspection(see plans)
i Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: i)d 1"�\JOtn�Q 1 -1P0 Permittee Signature: On
r,\Dt 'Lrj�_�
v 1�J Caalll55`033.6`39.'41�75 by 7:00 a.m.for the next available inspection'date.
-1
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1 = ill Transmittal Letter
T,G A iz D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Tom Hochstatter DATE RECEIVED:
DEPT: BUILDING DIVISION RECEIVED
FROM: Earl Carson MAR 2 4 2021
COMPANY: Carleton Hart Architecture, PC CITY OF TIGARD
BUILDING DIVIS+OE*'
PHONE: (503) 347-8261 (earl.carsonCcr�.carletonhart.com) I BY
RE: 11157, 11159, 11161, & 11163 SW HALL BLVD, Building A - BUP2020-00170
(Site Address) TIGARD, OR 97223 (Permit Number)
Village at Washington Square Rehabilitation Building B - BUP2020 00171
(Project name or subdivision name and lot number) Building C - BUP2020-00172
Community Building - BUP2020-00173
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
2 Additional set(s) of plans. Revisions:
2 Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: Attached are revisions to submitted permit drawings with revised demolition
plans, roof plans and details. Owner has elected to demo and install a new asphalt
shingle roof on all four buildings as part of this project. Scope of work also includes
adding additional attic ventilation and insulation in lower roofs over conditioned spaces.
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: 3--.3 J - DJ Initials:
Fees D31 Yes D No Fee Description: Amount Dul :
1 1—if pi,.,,, 1'c.ls cv- $ Cr)
Special
Instructions: -
Reprint Permit(per PE): `1 Yes ❑No ❑ Done
Applicant Notified: /01._ Date: i�/s/ I Initials: /9;
\
I,\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012
Branden Taggart
From: Branden Taggart
Sent: Monday, April 5, 2021 8:55 AM
To: earl.carson@carletonhart.com
Subject: Village at Washington Square Revisions: BUP2020-00170 - 173
Attachments: Invoice.pdf
Hello Earl,
The revisions for Village at Washington Square buildings A, B, C,and Community Building are ready to pick up now. The
balance due is$90.00, and I have attached an invoice above for you to reference. This fee can be paid online at
https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number BUP2020-00170 under
the Building tab. There is a 3%service fee for credit cards, but e-checks do not have a service fee.
Once paid, please email the Permit Technicians at TigardBuildingPermits@tigard-or.gov so that we make the revisions
available to pick up. Please note that inspections cannot take place with outstanding fees due. Once these fees are
paid, Inspections can resume.
Thank you,
Branden Taggart
11 a City of Tigard
0 a Senior Permit Technician
r
Community Development
13125 SW Hall Blvd,
Tigard,OR 97223
(503)718-2449
b•randent@tigard-o r,gov
1
CITY OF TIGARD BUILDING PERMIT
INI COMMUNITY DEVELOPMENT Permit#: BUP2020-00172
Date Issued: 12/16/2020
T r i;A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 1 S135DA04600
Jurisdiction: Tigard
Site address: 11161 SW HALL BLVD
Project: Village at Washington Square-Building C Subdivision: 1998-038 PARTITION PLAT Lot: 1-2
Project Description: Building C: Exterior renovation including replacement of siding,windows, doors,stairs and portions of decks.
Contractor: LMC INC Owner: VILLAGE AT WASHINGTON SQUARE
19200 SW TETON AVE LIMITED PARTNERSHIP
TUALATIN, OR 97062 BY CPAH
PO BOX 23206
TIGARD, OR 97281
PHONE: 503-646-0521 PHONE.
FAX:
FEES
Specifics:
Description Date Amount
Type of Use: MF
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 12/15/2020 $1,631.43
Demolition
Occupancy Grp: R-2 Occupancy Load: 0 12% State Surcharge-Building 12/15/2020 $195.77
Dwelling Units: Plan Review 12/15/2020 $1,060.43
Stories: Height: ft DC Provision Review,COM TI-Ping 12/15/2020 $406.00
Bedrooms: Bathrooms: Plan Review-Fire Life Safety 12/15/2020 $652.57
Value: $186,180 Metro CET 12/15/2020 $223.42
Floor Areas:
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $4,169.62
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet: 1 Special Inspection(see plans)
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: \` v of ��0 Permittee Signature: 00 npptiL#r (�v�
\ Call 503.639.4175 by 7:00 a.m.for the next available inspection date.�'�t�""
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Gv
ppCC��++EIVC
Commercial 1'1 G FOR OFFICE USE ONLY
City of Tigard Jul_ 2 3 2020 Received
" 13125 SW Hall Blvd,Tigard,OR 97223 Date/By: " Pei mit N
,. RD !'Ian Revie � �»����
Phone: 503.718-2439 Fax: 503-598-1960OF TIGA �_a0 ,
CITY .a,°/,y_• J Related Pcrmir.
Tt( A[i tJ Inspection Line: 503-639-4175 BUILDING DIVISI�' ale Ready/13y: L ,J 7uris ®Sec Paget for
• Internet: www Tigard-or.gov Notified/Method:Or`"is/w AV Supplemental Information
Ell/f}r t.- /6741-4- f—.
. TYPE OF' K'QRI REQUIRED DATA:I-AND 2-FAMILY DWELLING
❑Ncw construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
0 AdditioNalteratian/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ I-and 2-family dwelling 0 Commercial/industrial Valuation: S
❑Accessory building ®Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE, INFORMATION AND LOCATION Total number of floors:
Job site address: ///4j / SW Hall Boulevard New dwelling area: square feet
City/Stale/ZIP: Tigard, OR 97223
Garage/carport area: square feet
Suite/bldg/apt.a: e, Project name: Village at Washington Square Covered porch area: square feet
Cross street/directions to job site: Just north of 217 on the west side of Hall Blvd. Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot it: Permit fees*are based on the value of the work performed.
'Tax maplparcel a: 1 S 135DA-4600 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORKwork indicated on this application.
Exterior renovation including replacing siding, windows,exterior doors,exterior Valuation g� � ) 3
stairs and portions of exterior decks. Interior work to at the Community Building
to enclose an office within the mulitpurpose room. Site work includes repair of Existing building area: See attached per building
R 7• parking lot asphalt,regrading at Building B,and relocating mailboxes. New building area: square feet
0 PROPERTY OWNER ❑ TENANT Number of stories: 1 -3
Name: Community Partners for Affordable Housing Type of construction: VA
Address: P.O. Box 23206 Occupancy groups:
City/state IP: Tigard, OR 97281 Existing: R-2,A-3
Phone:( 5034293-4038 Fax:( )
New: R-2, A-3
'0 APPLICANT :/ CONTACT PERSON BUILDING PERMIT FEES*
41 Business name: Carleton Hart Architecture Mow refnro/rrxc5mukl
Structural plan review fee(or deposit): (r 04 d y
Contact name: Earl Carson
Addrews FLS plan review fee(if applicable):
830 SW 10th Ave#200
pii City/State/ZIP: Portland, OR 97205 Total fees due upon application:
Phone:( 504)347.8261 I'ax::( ) Amount received:
E-mail: earLCarSOnacarletonhart.COnt PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CAV7RACT-- Commercial and residential prescriptive installation of i
roof-top mounted PhatoVoltaic Solar Panel System.
Business name: LMC Construction • Submit two(2)sets of roof plan with connection details
and lire department access,along with the 2010 Oregon
Address: 19200 SW Teton Ave Solar Installation Specially Code checklist.
City/State/ZIP: Tualatin, OR 97062 Permit fee(includes plan review $180.00
and administrative fees):
Phone:( 5034646-0521 Fax:( 5034646-6823
State surcharge(12%of permit fee): $2 L60
CCB Lie.: OR: 161282
Total fee due upon application: $201.60
Authorized si ..- This permit application expires if a permit is not obtained
within 180 days after it bits been accepted as romplete.
Print name: (.l,•.fY.A -' Jve"-• 'Ltt A.V. Date: rj atz i{„,) * Fee methodology set by Tri-County Building Industry
Service Board.
1:1Bui!ding\Permits 1BIJP_COM_PermitAppdoe Rev 04/21/2014 440-46i3T(I1/02/COM/WEB)
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
0
T G n►;n Building Permit Review — Commercial - No Land Use
Building Permit #: /- G, Z.O °_d _OO/7c—
Site Address: ///4/SW Hall Blvd Suite/Bldg#: C
Project Name: Village at Washington Square
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: Exterior renovation: remove/replace siding,windows, doors, stairs, and decks. Replacement sizes will be like-for-like.
O SITE WORK IS INCLUDED WITH THIS PERMIT.
Existing Business Activity: Apartments
Proposed Business Activity: Apartments
❑e Verify site address/suite# exists and active in permit system.
0 River Terrace Neighborhood: ❑ Yes L I No
El Zoning: MUR-1
❑o Permitted Use: U Yes U No U Spec Space
11 ❑e Confirm no land use required.
V.l Business License:
Exists: ❑ Yes ❑ No, applicant was provided a business license application
Notes:
Approved by Planning: Date: 7/30/20
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: '/2 a/7-0
Site Plans: #
Building Plans: # .
Building Permit#: Enter building ermit# above. nn �
Workflow Routing: "Planning [I Permit Coordinator Fsuilding
Workflow Sign-off: Q'Sign-off for Planning(include notes from planning review)
Route Application Documents: wilding: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: <-0"'"5- ei..e x,,,,...s.,— - Date: 7/7�Z€'
I:\Building\Forms\BldgPermitRvw_COM_NoLan dUse_1 l 1819.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: t Date:
Notes: Wir
NiaW
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Ap.:cant:
Revision Notice 2: Date Sent to .plicant:
Revision Notice 3: Date Sent Applicant:
❑ SDC Fees Entered: Wash Po Trans Dev Tax: ❑ Yes ❑ N/A
Ti rd Trans SDC: ❑ Yes ❑ N/A
"arks SDC: 0 Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit-Coordinator: Date:
1:1Bu i lding\Forms\BldgPermitRvw_COM_NoLand Use_111819.docx
( I) A \ JUL 2 3 2020
`,J/ \ CITY OF TIGARD
BUILDING DIVISION
Village at Washington Square
BUILDING AREAS:
Building A:
Level 1 6,063 SF
Level 2 5,615 SF
Level 3 4,496 SF
Total 16, 174SF
Building B:
Level 1 2,813 SF
Level 2 2,651 SF
Level 3 1,840 SF
Total 7,304 SF
Building C:
Level 1 1,157 SF
Level 2 1,033 SF 1
Total 2,190 SF
Community Room:
Total 667 SF
PROJECT COST VALUATION
BASED ON LMC CONSTRUCTION COST ESTIMATE DATED JULY 13,2020
BUILDING A: $992,955 III 51
BUILDING B: $434,418 I I
BUILDING C: $186,180
46
COMMUNITY BUILDING: $ 65,465 17 I ,
SITE WORK: $ 63,261 t f c i S LA,ts M t ITCD
CARLETON HART ARCHITECTURE PC
830 SW loth AVE #200. Portland. OR 97205 I 503.243.2252 1 www.carletonhart.com I ORBAF ARF-0156