Loading...
Permit CITY OF TIGARD BUILDING PERMIT i _ COMMUNITY DEVELOPMENT Permit#: BUP2020-00172 s' Date Issued: 12/16/2020 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 t•t\1\Zt 0`? Parcel: 1 S135DA04600 Jurisdiction: Tigard Site address: 11161 SW HALL BLVD Project: Village at Washington Square-Building C Subdivision: 1998-038 PARTITION PLAT Lot: 1-2 Project Description: Building C: Exterior renovation including replacement of siding,windows,doors,stairs and portions of decks. Contractor: LMC INC Owner: VILLAGE AT WASHINGTON SQUARE 19200 SW TETON AVE LIMITED PARTNERSHIP TUALATIN, OR 97062 BY CPAH PO BOX 23206 TIGARD, OR 97281 PHONE: 503-646-0521 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 12/15/2020 $1,631.43 Demolition Occupancy Grp: R-2 Occupancy Load: 0 12%State Surcharge-Building 12/15/2020 $195.77 Dwelling Units: Plan Review 12/15/2020 $1,060.43 Stories: Height: ft DC Provision Review,COM TI-Ping 12/15/2020 $406.00 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 12/15/2020 $652.57 Value: $186,180 Metro CET 12/15/2020 $223.42 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $4,169.62 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: 1 Special Inspection(see plans) i Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: i)d 1"�\JOtn�Q 1 -1P0 Permittee Signature: On r,\Dt 'Lrj�_� v 1�J Caalll55`033.6`39.'41�75 by 7:00 a.m.for the next available inspection'date. -1 This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1 = ill Transmittal Letter T,G A iz D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom Hochstatter DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Earl Carson MAR 2 4 2021 COMPANY: Carleton Hart Architecture, PC CITY OF TIGARD BUILDING DIVIS+OE*' PHONE: (503) 347-8261 (earl.carsonCcr�.carletonhart.com) I BY RE: 11157, 11159, 11161, & 11163 SW HALL BLVD, Building A - BUP2020-00170 (Site Address) TIGARD, OR 97223 (Permit Number) Village at Washington Square Rehabilitation Building B - BUP2020 00171 (Project name or subdivision name and lot number) Building C - BUP2020-00172 Community Building - BUP2020-00173 ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: 2 Additional set(s) of plans. Revisions: 2 Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: Attached are revisions to submitted permit drawings with revised demolition plans, roof plans and details. Owner has elected to demo and install a new asphalt shingle roof on all four buildings as part of this project. Scope of work also includes adding additional attic ventilation and insulation in lower roofs over conditioned spaces. FOR OFFICE USE ONLY Routed to Permit Technician: Date: 3--.3 J - DJ Initials: Fees D31 Yes D No Fee Description: Amount Dul : 1 1—if pi,.,,, 1'c.ls cv- $ Cr) Special Instructions: - Reprint Permit(per PE): `1 Yes ❑No ❑ Done Applicant Notified: /01._ Date: i�/s/ I Initials: /9; \ I,\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 Branden Taggart From: Branden Taggart Sent: Monday, April 5, 2021 8:55 AM To: earl.carson@carletonhart.com Subject: Village at Washington Square Revisions: BUP2020-00170 - 173 Attachments: Invoice.pdf Hello Earl, The revisions for Village at Washington Square buildings A, B, C,and Community Building are ready to pick up now. The balance due is$90.00, and I have attached an invoice above for you to reference. This fee can be paid online at https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number BUP2020-00170 under the Building tab. There is a 3%service fee for credit cards, but e-checks do not have a service fee. Once paid, please email the Permit Technicians at TigardBuildingPermits@tigard-or.gov so that we make the revisions available to pick up. Please note that inspections cannot take place with outstanding fees due. Once these fees are paid, Inspections can resume. Thank you, Branden Taggart 11 a City of Tigard 0 a Senior Permit Technician r Community Development 13125 SW Hall Blvd, Tigard,OR 97223 (503)718-2449 b•randent@tigard-o r,gov 1 CITY OF TIGARD BUILDING PERMIT INI COMMUNITY DEVELOPMENT Permit#: BUP2020-00172 Date Issued: 12/16/2020 T r i;A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S135DA04600 Jurisdiction: Tigard Site address: 11161 SW HALL BLVD Project: Village at Washington Square-Building C Subdivision: 1998-038 PARTITION PLAT Lot: 1-2 Project Description: Building C: Exterior renovation including replacement of siding,windows, doors,stairs and portions of decks. Contractor: LMC INC Owner: VILLAGE AT WASHINGTON SQUARE 19200 SW TETON AVE LIMITED PARTNERSHIP TUALATIN, OR 97062 BY CPAH PO BOX 23206 TIGARD, OR 97281 PHONE: 503-646-0521 PHONE. FAX: FEES Specifics: Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 12/15/2020 $1,631.43 Demolition Occupancy Grp: R-2 Occupancy Load: 0 12% State Surcharge-Building 12/15/2020 $195.77 Dwelling Units: Plan Review 12/15/2020 $1,060.43 Stories: Height: ft DC Provision Review,COM TI-Ping 12/15/2020 $406.00 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 12/15/2020 $652.57 Value: $186,180 Metro CET 12/15/2020 $223.42 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $4,169.62 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: 1 Special Inspection(see plans) Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: \` v of ��0 Permittee Signature: 00 npptiL#r (�v� \ Call 503.639.4175 by 7:00 a.m.for the next available inspection date.�'�t�"" This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Gv ppCC��++EIVC Commercial 1'1 G FOR OFFICE USE ONLY City of Tigard Jul_ 2 3 2020 Received " 13125 SW Hall Blvd,Tigard,OR 97223 Date/By: " Pei mit N ,. RD !'Ian Revie � �»���� Phone: 503.718-2439 Fax: 503-598-1960OF TIGA �_a0 , CITY .a,°/,y_• J Related Pcrmir. Tt( A[i tJ Inspection Line: 503-639-4175 BUILDING DIVISI�' ale Ready/13y: L ,J 7uris ®Sec Paget for • Internet: www Tigard-or.gov Notified/Method:Or`"is/w AV Supplemental Information Ell/f}r t.- /6741-4- f—. . TYPE OF' K'QRI REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑Ncw construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 0 AdditioNalteratian/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I-and 2-family dwelling 0 Commercial/industrial Valuation: S ❑Accessory building ®Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE, INFORMATION AND LOCATION Total number of floors: Job site address: ///4j / SW Hall Boulevard New dwelling area: square feet City/Stale/ZIP: Tigard, OR 97223 Garage/carport area: square feet Suite/bldg/apt.a: e, Project name: Village at Washington Square Covered porch area: square feet Cross street/directions to job site: Just north of 217 on the west side of Hall Blvd. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot it: Permit fees*are based on the value of the work performed. 'Tax maplparcel a: 1 S 135DA-4600 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORKwork indicated on this application. Exterior renovation including replacing siding, windows,exterior doors,exterior Valuation g� � ) 3 stairs and portions of exterior decks. Interior work to at the Community Building to enclose an office within the mulitpurpose room. Site work includes repair of Existing building area: See attached per building R 7• parking lot asphalt,regrading at Building B,and relocating mailboxes. New building area: square feet 0 PROPERTY OWNER ❑ TENANT Number of stories: 1 -3 Name: Community Partners for Affordable Housing Type of construction: VA Address: P.O. Box 23206 Occupancy groups: City/state IP: Tigard, OR 97281 Existing: R-2,A-3 Phone:( 5034293-4038 Fax:( ) New: R-2, A-3 '0 APPLICANT :/ CONTACT PERSON BUILDING PERMIT FEES* 41 Business name: Carleton Hart Architecture Mow refnro/rrxc5mukl Structural plan review fee(or deposit): (r 04 d y Contact name: Earl Carson Addrews FLS plan review fee(if applicable): 830 SW 10th Ave#200 pii City/State/ZIP: Portland, OR 97205 Total fees due upon application: Phone:( 504)347.8261 I'ax::( ) Amount received: E-mail: earLCarSOnacarletonhart.COnt PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CAV7RACT-- Commercial and residential prescriptive installation of i roof-top mounted PhatoVoltaic Solar Panel System. Business name: LMC Construction • Submit two(2)sets of roof plan with connection details and lire department access,along with the 2010 Oregon Address: 19200 SW Teton Ave Solar Installation Specially Code checklist. City/State/ZIP: Tualatin, OR 97062 Permit fee(includes plan review $180.00 and administrative fees): Phone:( 5034646-0521 Fax:( 5034646-6823 State surcharge(12%of permit fee): $2 L60 CCB Lie.: OR: 161282 Total fee due upon application: $201.60 Authorized si ..- This permit application expires if a permit is not obtained within 180 days after it bits been accepted as romplete. Print name: (.l,•.fY.A -' Jve"-• 'Ltt A.V. Date: rj atz i{„,) * Fee methodology set by Tri-County Building Industry Service Board. 1:1Bui!ding\Permits 1BIJP_COM_PermitAppdoe Rev 04/21/2014 440-46i3T(I1/02/COM/WEB) City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT 0 T G n►;n Building Permit Review — Commercial - No Land Use Building Permit #: /- G, Z.O °_d _OO/7c— Site Address: ///4/SW Hall Blvd Suite/Bldg#: C Project Name: Village at Washington Square (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Exterior renovation: remove/replace siding,windows, doors, stairs, and decks. Replacement sizes will be like-for-like. O SITE WORK IS INCLUDED WITH THIS PERMIT. Existing Business Activity: Apartments Proposed Business Activity: Apartments ❑e Verify site address/suite# exists and active in permit system. 0 River Terrace Neighborhood: ❑ Yes L I No El Zoning: MUR-1 ❑o Permitted Use: U Yes U No U Spec Space 11 ❑e Confirm no land use required. V.l Business License: Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: Approved by Planning: Date: 7/30/20 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: '/2 a/7-0 Site Plans: # Building Plans: # . Building Permit#: Enter building ermit# above. nn � Workflow Routing: "Planning [I Permit Coordinator Fsuilding Workflow Sign-off: Q'Sign-off for Planning(include notes from planning review) Route Application Documents: wilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: <-0"'"5- ei..e x,,,,...s.,— - Date: 7/7�Z€' I:\Building\Forms\BldgPermitRvw_COM_NoLan dUse_1 l 1819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: t Date: Notes: Wir NiaW Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Ap.:cant: Revision Notice 2: Date Sent to .plicant: Revision Notice 3: Date Sent Applicant: ❑ SDC Fees Entered: Wash Po Trans Dev Tax: ❑ Yes ❑ N/A Ti rd Trans SDC: ❑ Yes ❑ N/A "arks SDC: 0 Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit-Coordinator: Date: 1:1Bu i lding\Forms\BldgPermitRvw_COM_NoLand Use_111819.docx ( I) A \ JUL 2 3 2020 `,J/ \ CITY OF TIGARD BUILDING DIVISION Village at Washington Square BUILDING AREAS: Building A: Level 1 6,063 SF Level 2 5,615 SF Level 3 4,496 SF Total 16, 174SF Building B: Level 1 2,813 SF Level 2 2,651 SF Level 3 1,840 SF Total 7,304 SF Building C: Level 1 1,157 SF Level 2 1,033 SF 1 Total 2,190 SF Community Room: Total 667 SF PROJECT COST VALUATION BASED ON LMC CONSTRUCTION COST ESTIMATE DATED JULY 13,2020 BUILDING A: $992,955 III 51 BUILDING B: $434,418 I I BUILDING C: $186,180 46 COMMUNITY BUILDING: $ 65,465 17 I , SITE WORK: $ 63,261 t f c i S LA,ts M t ITCD CARLETON HART ARCHITECTURE PC 830 SW loth AVE #200. Portland. OR 97205 I 503.243.2252 1 www.carletonhart.com I ORBAF ARF-0156