Loading...
Specifications a)P202,0-001(0(a) Wi lo"13 CO (tie) STRUCTURAL CALCULATIONS ALUMINUM GUARDRAILS PROJECT: SUMMER CREEK APARTMENTS 13456 Hawks Beard Tigard, OR 97223 for Precision Rail of Oregon 10735 SE Foster Road Portland, Oregon 97266 'C9uCTu/ti'q W PROP O ��PucrURq ( '°l c, I s 'i34GPE James G. Pierson, Inc. ,00u OREGON F4 ch 19, 19� F'Q R. GovO �NGINEE�6 EXPIRES: 6-3O-2I James G. Pierson, Inc. Consulting Structural Engineers 610 S.W.ALDER SUITE 918 PORTLAND,OR. 97205 (503)226-1286 FAX 226-3130 August 5,2020 Page 1 of 13 Aluminum Railing Systems Task: Check aluminum railing system and attachments for conformance to the 2018 IBC using the 2015 Aluminum Design Manual, 10' edition. Code Summary Multiple family dwellings (apartments, condos, hotels) and other commercial applications - IBC is the controlling code IBC Section 1607.8: Guardrail & Handrails 200 lbs any direction at top rail or 50 plf load to the top rail in any direction Guardrail in-fill 50 psf over a 1 ft sq. area (balusters, fillers, glass, cables, etc) Glazing requires a safety factor of 4 Guardrail Height: ; H42 = 42 in✓ ALUMINUM PROPERTIES Extruded 6005-T5 ;FL = 38 ksi ;Fty = 35 ksi ;Fey = 35 ksi ;Fshear = 20 ksi ;Fbearing = 56 ksi ;E = 10000 ksi ;Fb1 = Fey / 1.65 = 21212.12 psi ;(ASD) or ;Fb2= FL/ (1 ` 1.95) = 19487.18 psi ;(ASD) ; Fb1 = 21212.12 psi ; Fb2 = 19487.18 psi ;Fb = min(Fb1,Fb2) ;Fb = 19487.18 psi Project Joh no. James G. Pierson, Inc. Summer Creek Apartments Location Consulting Structural Engineers nsa Tigard, OR 8/5/2020 610 S.W.Alder,Soar 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax-(503)226-3130 Client Shen no. Precision Rail of Oregon Page 2 of 13 Aluminum Properties Cont: Extruded 6063-T6 ;Ftu6o63 = 30 ksi ;Fty6o63 = 25 ksi ;F'cyeoe3 = 25 ksi ;Fsheareoe3 = 17 ksi ;Eeo63 = 10100 ksi ;Fbt6063 = F'cy6o63 / 1.65 = 15151.52 psi ;(ASD) or ;Fb26o63= Ftu6063/ (1 * 1.95) = 15384.62 psi ;(ASD) ; Fb1so63 = 15151.52 psi ; Fb26oe3 = 15384.62 psi ;Fb6063 = min(Fb16o63,Fb26o63) ;Fb6o63 = 15151.52 psi Project Job no. James G. Pierson, Inc., Summer Creek Apartments Consulting Structural Engineers Local]on use Tigard, OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 CGam Sheet no. Precision Rail of Oregon Page 3 of 13 CHECK 375 SERIES TOP RAILS FOR LOADING ;L=5 ft;is desired maximum spacing of posts. ;L=5.00 ft Bending of Top Rail ;M=200 Ibs*L/4=250.00 lb_ft;or ; M=3000.00 lb_in 375 Series Top Rail (SAPA part 31836) ;Ix1375TR=0.382 In4 ;Ix2375TR=0.295 in4 ;Svert375TR= Ix1375TR/ 1.382 in=0.28 in3 ;Shorz3m e=1x2375TR/0.875 in=0.34 in3 Check for vertical loading direction: ;fbven= M/Svert375rR=10853.40 psi ;< 19,500 psi (for 6005-T5) ,_"Okay" N-3/4•� Check for horizontal loading condition ;fbhorz= M/Shorz375TR =8898.31 psi ; < 19,500 psi ;375 series Deflection;Def375rr=200 Ibs*L3/(48*E*lx2375TR)=0.31 in ;U120=0.50 in ;(max) 375 Series Top Rail okay for 5 ft spacing of posts for vertical or horizontal loading Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers n e Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no Precision Rail of Oregon Page 4 of 13 CHECK BOTTOM RAILS 15/16" f Check bottom rails for wind loads or 50 lbs over 1 sq,ft. r ;L=5 ft;is desired maximum spacing of posts. ;L=5.00 ft 100 Series Bottom Rail ;Ivertloob=0.048 in4 ti l ;Ihorzioob=0.104 in4 ;Svertioob=Ivertioob l 1.0625 in= 0.05 in3 c`:I ;Shorzioob=lhorzloob/0.468 in=0.22 in3 50 lbs over 1 sq.ft. Use 50 lb point load at midspan c _) ;M=50lb`L/4=62.50'bit 100 SERIES BOTTOM RAIL Check for vertical loading direction: 100 series stress;fbioo=M/Svertioob = 16601.56 psi Bottom rails okay for the 50 lb point load Project lob no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location oar` Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 5 of 13 RAIL CONNECTIONS The top rail sections either slide over connection blocks or are attached to the top of the posts. In either case,(2)#10 self-drilling steel screws are used to make the connections. The connection blocks are attached to the sides of the vertical posts with (2)#10 self-drilling steel screws. In most cases,the 200 lb maximum load is shared by(4)screws but if the load(200 Ibs)is placed at the end of a rail,it would be supported by just(2)screws. Maximum shear is each screw ;v=200 lbs/2= 100.00 Allowable shear in each screw: 5.4.3 Screw Shear and Bearing The shear force on a screw shall not exceed the least of: l) 2 F.,D ran.. (Eq. 5.4.3-1) If the screw is countersunk, one-half the depth of the countersink shall he deducted from r. 2) 2F 2 Dt2h1 (Eq. 5.4.3-2) 3) 4.2023D)1f2 FN,s/rt,.fort.s r, (Eq.5.4.3-3) 4) F„/(1.25 n.,) (Eq.5.4.3-4) ; Ftoscrew=38000 psi ;dscrew=0.19 in ;#10 screw ;nu= 1.95 ;asd factor ;ns=3 ;factor of safety ;h=0.1 in ;thickness bottom rail ;t2=0.1 in ;thickness post ;Pns = 1526 lbs ;ESR-3332 report ;1) ;2*Ftuscrew*dscrew*ti/nu=740.51 lbs ;2) ;2*Fwscrew*dscrew*tz/no=740.51 lbs ;3) ;4.2*(t23*dscrew)5*Fluacrew/ns=733.31 lbs ;4) ;Pns/(1.25*ns)=406.93 lbs Okay #10 screws are okay to attach top rail to posts Bottom rail connection similar but 50 lb design load. #10 screws okay by inspection Project Job no. James G. Pierson, Inc. Summer Creek Apartments Date Consulting Structural Engineers Location Tigard,OR 8!5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 TeL(503)226-1286 Fax:(503)226-3130 Client Sheet no Precision Rail of Oregon Page 6 of 13 Posts r 2 3/8" x 2 3/8" Posts All of the railing systems use the R Series Post R Series Post (SAPA part 36430) Posts for this project are mounted a maximum distance of 7"below decking for an effective post height;Has=49 in ;Ixl =0.935 in° ;Ixz=0.935 in° ;Six =Ixl/1.188 In= 0.79 in3 ;Sx2=lxz/1.188in=0.79in3 For 49"tall posts(fascia mounted), 5'0"max spacing ;L=5.0 ft Per IBC ;M3=200 lbs*(H48) =9800.00 lb_in Per IBC ;M4=50 lbs/ft*L*(H48) = 12250.00 lb_in Balcony Posts—49"height ;Fb3=M3/Sx1=12451.76 psi ;or;Fb4=M4/So=15564.71 psi Allowable; Fb=19.49 ksi Deflection Check ;D3=200 lbs*(H48)3/(3*E*Ix2)=0.84 in ;D4=50lbs/ft*L*(H48)3/(3*E*6z)=1.05 in ;Daii=49 in /60=0.82 in ;(similar to buiding deflection limits IBC Table 1604.3 for other components of the building) Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Pax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 7 of 13 POSTS - SHEAR Check shear in post walls Circumference of resisting area for screw pull-thru ;Cserew=0.2 in*pi=0.63in Post wall thickness;ti =0.10 in ; (13503) ;Areal =Cscrew*tl =0.06 in2 ;V=Areal*Fsheer/1.65=761.60 lbs ;> 100 lbs Check Posts for Shear ;fs,=300 lbs/(2*2.375 in*t,)=0.63 ksi ; not an issue CHECK RAIL SPLICES Check hat channel(SAPA 25877)rail splices. These members,when used,are located at rail splices over posts ;Mnst=200 lbs*6 in= 1200.00 lb_in 2.To join a straight connection,butt joint over the Hat Channel (SAPA part 25877) center of a post. Reinforce the joint with 8#10 x 3/4"screws,fastened through pre-drilled holes, ;Sverthat=0.0736 in3 to a spice centered between the rails, Attach ;Shorzhat=0.149 in3 top rail to the post with 4 #8 x 1/2"screws. ;Fbvert=Mhat/Sverthat=16304.35 psi .. ;Fbhorn=Mhat!Shorzhat=8053.69 psi UL ; ,Fty/1.65 = 21212.12 psi 4+ L w x n gen ei e ;Fb = 19487.18 psi Hat channels are okay Project James G. Pierson, Inc. Summer Creek Apartments niw Consulting Structural Engineers coca. Tigard, OR 8/5/2020 610 S.W.Alder,Suite 918 Ponland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 8 of 13 POST MOUNTING BRACKETS Check screws: Fascia Mount Diagram ;vscrew=300 lbs*(H48)/(4.5 in*2)=1633.33 lbs Allowable Shear screw; Vscrewanow= 120 ksi*.2*.7= 16.80 ksi Shear area required ;vscrew/Vscrewarww=0.10 in2 j' Use 5/16"il)x long Torx Drive Flate Head self drilling screws Vertical load is shared between(4)screws or;300 lbs/4=75.00 Ibs;each —okay Check Bending in Bracket ;fbxbracket=300 lbs*(H48)/(5.825 in4/1.5 in)=3785.41 psi;out-of-plane direction ;fbyb ether=300 lbs*(Has)/(7.204 in4/3 in)=6121.60 psi ;in-plane of deck Fascia Bracket okay for loads. Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 9 of 13 PICKET RAILING Picket Railing systems use the Series 200 top rail,standard R series posts,and 100 series bottom rail l e.nawna `row(tov.wnt M Mil(!OWn M114) 1111.1Ntl wmsn xuu C"O e's."......"•.-•IO ginsoS.RSStn4a5 a0- bwl.,ae lM4r.(60V•15YW: " 2 N SC.rOA(.WKS ALUM) • vtoer trounsuW) t7O 1 nor.tSsmaSt • xrnawiarw • naaxWsn ALUM) r !' Poker MY nirs cWsTs mum I �/ ^M4nrt SO as r.tD TORN II VACIR WOWS 11T SOALeI(WO•WOWS // aonan awn(W W.n+u.n WI nun wxn COMY 55M SS Check Pickets t I 5/8" SQUARE PICKET Design Loads-Infill: 50 lbs over 1 sq.ft design load Areo - 0.115 in-2 Perimeter - 2.483 in min 2 pickets resist that load so use 25 lb point load for centroid.wdh respect to Sketch Org,n(in) x - o design r - 0 ;Mpicket=25 lbs*48 in/4=300.00 lb_in Inertia with respect to Sketch Ori.in(in). inertia tensor(in"4) ;Ixpicket=0.006 inA4 1•• - 0006 Iry 0 lye = 0 lyy 0.006 ;Sxpicket= lxpicket/0.3125 in =0.02 inA3 Polar Moment of Inertia = 0.013 in-4 Fbpicket=Mpicket/Szpicket= 15625.00 psi --- Area Moments of Inertia with respect to Principal Awes(in-4): Ir - 0.006 ly - 0.006 Polar Moment of Inertia - 0.013 in-4 Pickets okay for 48" height Rotation Angle from projected Sketch Origin to Principal Aees(deorees): About z axis - 0 Rod,, of Gyration with respect to Principal Azes(in): RI - 0.236 R2 - 0.236 Project Joh no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 • 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 10 of 13 FASCIA BRACKET INTO BLOCKING (Detail 1/A6) Max;L=5ft ;H = 42 in+4 in=46.000 in Per IBC ;M1 =200 Ibs*(H) =9200.000 lb_in ;M2=50 plf*L*(H) =11500.000 lb_in ; (50p1f controls) ;M2irtd=M2* 1.6= 18400.000 lb_in ;(LRFD) ;V=300Ib; (ASD) ;Vlfrd=V* 1.6=480.000 lb;(LRFD) Anchor Tension;AT=M2/4.5 in=2555.556 lb; (ASD) 2 anchors per side ;Ts=AT/2=1277.778 lb; (ASD) ;Tslfrd=Ts*1.6=2044.444 lb; (LRFD) Try 3/8"diameter lag bolts and assume DF, ;Tallow=305 lb*1.6=488.000 lb; per inch embedment Embedment requirement is: ;T=Ts/Tallow =2.618;inches Use(4)3/8"x 5"fully threaded SS lag screws at each post location. Secure blocking against rotation with 4 Simpson DTT2Z anchors or SDS screws on each side. ERIK,Wv PICKET VINYL 8 10O SE8 ES Rc8 5*FASCIA BRACKET ATTACHEC KV ldl 'Or FULLY TlWEAlED LAG semis IM1 # 11* !- Ill dX CR ai 2X BLOCKING ANCKK0K EO BACK TO tHE XiS1S WI Cali/ Ensure fasteners are ANDA RSORSOSSORE1NSINTO not within 1-1/2" of e'i0'AND AM top of bottom of trim or framing members. Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers 1AeaGon oat` Tigard, OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Clicnt Sheet no. Precision Rail of Oregon Page 11 of 13 FASCIA BRACKET INTO BLOCKING AT CONCRETE DECK ( Detail 1/A7) Max;L=5ft ;H=42 in+7 in=49.000 in • Per IBC ;M1 =200 lbs*(H) =9800.000 lb_in ;M2=50 plf*L*(H) =12250.000 lb_in ; (50p1f controls) ;M2hta=M2*1.6=19600.000 lb_in ;(LRFD) ;V=300 Ib;(ASD) ;Vitra=V*1.6=480.000 lb ;(LRFD) Anchor Tension ;AT= M2/4.5 in=2722.222 Ib; (ASD) 2 anchors per side ;Ts=AT/2=1361.111 Ib; (ASD) ;Tura=Ts*1.6=2177.778 lb ; (LRFD) Try 3/8"diameter lag bolts and assume DF, ;Tallow=305 lb*1.6=488.000 Ib; per inch embedment Embedment requirement is: ;T=Ts/Tallow =2.789;inches Use(4)3/8"x 5"fully threaded SS lag screws at each post location. Secure blocking against rotation with 4 Simpson DTT2Z anchors or SDS screws on each side. BR100 WI PICKET VINYL& 100 SERIES RCB 4X OR(2)2X BLOCKING ANCHORED BACK TO THE JOISTS Wi DTT2Z ANCHORS OR SDS SCREWS INTO END AND A35'S 6"FASCIA BRACKET ATTACHED WI(4) Y8"X5"FULLY THREADED LAG SCREWS. 1 11111, Jlal Ensure fasteners are not within 1-1/2" of top of bottom of trim or framing members. Project Joh no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Chant Sheet no. Precision Rail of Oregon Page 12 of 13 POST AT STAIRS (Detail 1/A8) Max;L=5 ft; BR100 WI PICKET VINYL 8 100 SERIES RCB ;H=36in 3'X STAIR STRINGER BY OTHERS Per IBC ;M1 =200 lbs*(H) =7200.000 lb_in ;M2=50 plf*L*(H) =9000.000 lb_in ;(50p1f controls) 3 T ANGLED BASE PLATE ATTACH ED WI(4)X°X6'FULLY THREADED LAG SCREWS. Anchor Tension ;AT=M2/2 in=4500.000 lb 2 anchors per side ;Ts=AT/2=2250.000 lb ;(ASD) -'� TYP Try 3/8"diameter lag bolts and assume DF, ;Tallow=305 lb* 1.6=488.000 lb; per inch embedment Embedment requirement is: ;T=Ts/Tallow=4.611 ;inches — USE(4)3/8"diameter fully threaded SS lag screws with 6.15 in min embedment at each post location. J n J e'7 • Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Hate Tigard, OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 13 of 13