Loading...
Specifications a P2o2o-col(DU), UUI(61 ) COI(0423 STRUCTURAL CALCULATIONS ALUMINUM GUARDRAILS PROJECT: SUMMER CREEK APARTMENTS 13456 Hawks Beard Tigard, OR 97223 for IsSd '1,10 'L0 • Precision Rail of Oregon 10735 SE Foster Road Portland, Oregon 97266 ,RUCTU, 5 RF9 PROF ��,vcrUq <C*GINo� 18346PE James G. Pierson, Inc. ,a OREGON so �Q��eh 19, O\Ne5 ' 0 `�p R. 4c3- Gp�. �NGlNEE? EXPIRES: 6-3O-21 James G. Pierson, Inc. Consulting Structural Engineers 610 S.W.ALDER SUITE 918 PORTLANI),OR. 97205 (503)226-1286 FAX 226-3130 August 5,2020 Page 1 of 13 Aluminum Railing Systems Task: Check aluminum railing system and attachments for conformance to the 2018 IBC using the 2015 Aluminum Design Manual, 10th edition. Code Summary `/Multiple family dwellings (apartments, condos, hotels) and other commercial applications - IBC is the controlling code IBC Section 1607.8: Guardrail & Handrails 200 lbs any direction at top rail or 50 plf load to the top rail in any direction Guardrail in-fill 50 psf over a 1 ft sq. area (balusters, fillers, glass, cables, etc) Glazing requires a safety factor of 4 Guardrail Height: ; H42 = 42 in✓ ALUMINUM PROPERTIES Extruded 6005-T5 ;FL = 38 ksi ;Ft5 = 35 ksi ;F'c6 = 35 ksi ;Fshear = 20 ksi ;Fbearing = 56 ksi ;E = 10000 ksi ;Fb1 = F'cy / 1 .65 = 21212.12 psi ;(ASD) or ;Fb2= Ft./ (1 * 1.95) = 19487.18 psi ;(ASD) ; Fbi = 21212.12 psi Fb2 = 19487.18 psi ;Fb = min(Fb,,Fb2) ;Fb = 19487.18 psi Project Job no. James G. Pierson, Inc. Summer Creek Apartments Location nato Consulting Structural Engineers Tigard, OR 8/5/2020 610 S.W.Alder.Suite 910 Portland,Oregon 97205 TeL(503)226-1256 Fax:(503)226-3130 Chen Sheet no. Precision Rail of Oregon Page 2 of 13 Aluminum Properties Cont: Extruded 6063-T6 ;Ftt16o63 = 30 ksi ;Fty6o63 = 25 ksi ;F'cy6o63 = 25 ksi ;Fshear6o63 = 17 ksi ;E6o63 = 10100 ksi ;Fb16o6s= F'cy6063 / 1.65 = 15151.52 psi ;(ASD) or ;Fb26o63= Fte6o63/ (1 * 1.95) = 15384.62 psi ;(ASD) ; Fb16o63 = 15151.52 psi ; Fb26o63 = 15384.62 psi ;Fb6063 = min(Fb16063,Fb26063) ;Fb6o63 = 15151.52 psi Project Job no. James G. Pierson, Inc., Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 c.licn sheet no Precision Rail of Oregon Page 3 of 13 CHECK 375 SERIES TOP RAILS FOR LOADING ;L=5 ft;is desired maximum spacing of posts. ;L=5.00 ft Bending of Top Rail ;M=200 Ibs*L/4=250.00 lb_ft;or ; M=3000.00 lb_in 375 Series Top Rail (SAPA part 31836) ;lx1375TR=0.382 in4 ;lx2375TR=0.295 in4 ;SVert375TR= lx1375TR/1.382 in=0.28 in3 ;Shorz375TR=lx2375TR/0.875 in=0.34 in3 Check for vertical loading direction: ;fb,,ert=M I Svert375TR=10853.40 psi ; < 19,500 psi (for 6005-T5) ,_"Okay" f Check for horizontal loading condition ;fbhorz=M/Shorz37sTR =8898.31 psi; <19,500 psi ;375 series Deflection;Def37sTR=200 Ibs*L3/(48* E*Ix2375TR)=0.31 in ;L/120=0.50 in ;(max) 375 Series Top Rail okay for 5 ft spacing of posts for vertical or horizontal loading Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location ate Tigard, OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 4 of 13 CHECK BOTTOM RAILS 1 5/1 6" -�- Check bottom rails for wind loads or 50 lbs over 1 sq,ft. ;L=5 ft;is desired maximum spacing of posts. ;L=5.00 ft 100 Series Bottom Rail cz_l ;Ivertloob=0.048 in4 ;Ihorzloob=0.104 in4 ;Svertloob= Ivertloob/1.0625 in= 0.05 in3 ;Shorztoob=Ihorzloob/0.468 in=0.22 in3 50 lbs over 1 sq.ft. Use 50 lb point load at midspan C_ ;M=50 lb*L/4=62.50 lb_ft 100 SERIES BOTTOM RAIL Check for vertical loading direction: 100 series stress;fbloo=M/Sverttoob = 16601.56 psi Bottom rails okay for the 50 lb point load Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location D81C Tigard, OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Chem Sbeet no. Precision Rail of Oregon Page 5 of 13 RAIL CONNECTIONS The top rail sections either slide over connection blocks or are attached to the top of the posts. In either case,(2)#10 self-drilling steel screws are used to make the connections. The connection blocks are attached to the sides of the vertical posts with (2)#10 self-drilling steel screws. In most cases,the 200 lb maximum load is shared by(4)screws but if the load(200 Ibs)is placed at the end of a rail,it would be supported by just(2)screws. Maximum shear is each screw ;u=200 lbs/2= 100.00 Allowable shear in each screw: 5.4.3 Screw Shear and Bearing The shear force on a screw shall not exceed the least of: I) 2 F,*1 D r1/n,,. (Eq.5.4.3-1) If the screw is countersunk, one-half the depth of the countersink shall he deducted from r. 2) 2F„=Dt21a„ (Eq. 5.4.3-2) 3) 4.2(r?1DF F„,2ht,,for r,5 r, (Eq. 5.4.3-3) 4) P„,/(1.25 ax) (Eq.5.4.3-4) ; Ftuscrew=38000 psi ;dscrew=0.19 in ;#10 screw ;nu= 1.95 ;asd factor ;nu=3 ;factor of safety =0.1 in ;thickness bottom rail ;t2=0.1 in ;thickness post ;Pns = 1526 lbs ;ESR-3332 report ;1) ;2*Ftuscrew*dscrew*tt I nu=740.51 lbs ;2) ;2*Ftuscrew*dscrew 12 I nu=740.51 lbs ;3) ;4.2*(t23*dscrow)'5*Ftuscrew/nu=733.31 lbs ;4) ;Pns/(1.25*nu)=406.93 lbs Okay #10 screws are okay to attach top rail to posts Bottom rail connection similar but 50 lb design load. #10 screws okay by inspection Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location earn Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Chen Sheet no. Precision Rail of Oregon Page 6 of 13 Posts 2 3/8" x 2 3/8" Posts All of the railing systems use the R Series Post R Series Post (SAPA part 36430) Posts for this project are mounted a maximum distance of 7"below decking for an effective post height;H48=49 in =0.935 in4 ;Ix2=0.935 in4 ;SA =1.1/1.188 in= 0.79 in3 ;Sx2=1,2/1.188 in=0.79 in3 For 49"tall posts(fascia mounted), 5'0"max spacing ;L=5.0 ft Per IBC ;M3=200 Ibs*(H48) =9800.00 lb_in Per IBC ;M4=50 lbs/ft*L*(H48) =12250.00 lb_in Balcony Posts—49"height ;Fb3=M3/S.,=12451.76 psi ;or;Fig=M4/Sx,=15564.71 psi Allowable; Fb=19.49 ksi Deflection Check ;D3=200lbs*(H48)3/(3*E*Ix2)=0.84in ;D4=50lbs/ft*L*(H48)3/(3*E*1a)=1.05in ;Doll=49 in /60=0.82 in ;(similar to buiding deflection limits IBC Table 1604.3 for other components of the building) Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Pax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 7 of 13 POSTS - SHEAR Check shear in post walls Circumference of resisting area for screw pull-thru ;Cserew=0.2 in*pi=0.63 in Post wall thickness;ti =0.10 in; (13503) ;Areal =Crew*t1 =0.06 in3 ;V=Areal*Fshear/1.65=761.60 lbs ;> 100 lbs Check Posts for Shear ;fv=300 lbs/(2*2.375 in*ti)=0.63 ksi ; not an issue CHECK RAIL SPLICES Check hat channel (SAPA 25877)rail splices. These members,when used,are located at rail splices over posts ;Mhat=200 lbs*6 in=1200.00 lb_in 2.To join a straight connection,butt joint over the Flat Channel (SAPA part 25877) center of a post, Reinforce the joint with 8 410 x 3/4"screws,fastened through pre-drilled holes, ;sverthat=0.0736 in3 to a splice centered between the rails. Attach ;Shorzhat=0.149 in3 top rail to the post with 4#8 x 1/2"screws. ;Fbvert=Mhat/Sverthat=16304.35 psi ;Fbhorz=Mhat/Shorzhat=8053.69 psi ui • -• ' trt�utrmrw ,: j 3 j .artswnalwce ;Fty-/1.65 = 21212.12psi t. = F r►te Pat WS ;Fb = 19487.18 psi soc Hat channels are okay . ~ . ? Project James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers L s"o" Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Shoot no. Precision Rail of Oregon Page 8 of 13 POST MOUNTING BRACKETS Check screws: Fascia Mount Diagram ;vscrew=300 lbs*(H48)/(4.5 in*2)=1633.33 lbs Allowable Shear screw; Vscrewanow= 120 ksi*.2*.7=16.80 ksi ! . Shear area required ;vscrew I Vscrewallow=0.10 in2 Use 5/16"tll x'/2"long Torx Drive Flate Head self drilling screws Vertical load is shared between(4)screws or;300 lbs/4=75.00 lbs; each —okay Check Bending in Bracket ;fbXbracket=300 lbs*(H48)/(5.825 in4/1.5 in)=3785.41 psi;out-of-plane direction ;fbybraoket=300 lbs*(Hag)/(7.204 in4/3 in)=6121.60 psi;in-plane of deck Fascia Bracket okay for loads. P,ojecl Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 9 of 13 PICKET RAILING Picket Railing systems use the Series 200 top rail,standard R series posts,and 100 series bottom rail et .K S 0,1191S (`♦�'I r/ PAD W(509 MAPr1 tM wit 4001n MOO) • TOP Mt mil FMSn&WI .,n%.n SM 95 / v WOO WaO WV" t1n ALUM: IN'90.PrSt(iW1 MA NI K1 pDt INroln NUM) II0%.75 S5 M 96 • MIL a1101K1714 ♦ ROM(W IWI Yule Y PLUM a64fu�i MU".ft SW 0.511.51)131tX / 'I tpn01%%%Pxxri 9IGR 005945 Y11.11 5 q • / .onolw Nmsn won st ow non Ite%1'SEM 96 Check Pickets ti 5/8" SQUARE PICKET Design Loads-Infill: 50 lbs over 1 sq.ft design load Area - 0.115 in-2 Perimeter - 2.183 in min 2 pickets resist that load so use 25 lb point load for eentroid,*th respect to Sketch origin(in) x - o design y - o ;M picket=25 lbs*48 in/4=300.00 lb_in Inertia with respect to Sketch Orgin(in)- Inertia Tensor(in"4) ;'wicket=0.006 InA4 hex •• 0.006 Icy0 ly% - 0 lyy - 0.006 ;Sxpicket= Ixpicket/0.3125 in=0.02 inA3 Polar Moment of Inertia - 0.013 in-• Fbpicket= Mpicket/Sxpicket=15625.00 psi "- Area Moments of Inertia with respect to Principal Axes(in 4): It, - 0.006 ly - 0.006 Polar Moment of Inertia - 0.013 5n"4 Pickets okay for 48" height Rotation Angle from projected Sketch Origin to Principal Ares(degrees). About z axis - 0 Radii of Gyration with respect to Principal A%es(in): R1 - 0.236 R2 • 0 236 Projut Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Location Dale Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 10 of 13 FASCIA BRACKET INTO BLOCKING (Detail 1/A6) Max;L=5ft ;H= 42 in +4 in=46.000 in Per IBC ;Mi =200 lbs*(H) =9200.000 lb_in ;M2=50 plf*L*(H) = 11500.000 lb_in ;(50p1f controls) ;M2irfd=M2*1.6= 18400.000 lb_in ;(LRFD) ;V=300Ib; (ASD) ;Vlo-d=V* 1.6=480.000 lb;(LRFD) Anchor Tension;AT=M2/4.5 in=2555.556 lb; (ASD) 2 anchors per side ;Ts=AT/2=1277.778 lb; (ASD) ;Tatra=Ts*1.6=2044.444 lb;(LRFD) Try 3/8"diameter lag bolts and assume DF, ;Tallow=305 lb* 1.6=488.000 lb;per inch embedment Embedment requirement is: ;T=Ts/Tallow =2.618;inches Use(4)3/8"x 5"fully threaded SS lag screws at each post location. Secure blocking against rotation with 4 Simpson DTT2Z anchors or SDS screws on each side. MIK W P C$ET VINYL 8 KO SEkfEB F 8 fi`FASCIA.moon ATTACHFO VN'141 >V :NM'FULLY THREADED LAG SCREnS F......w.r.."............-......_____....,ip , .ix OR 12;2X 6LOCFJNG AND-F 1E'0 K+.GB to f HE,K015I S a!0"21 Ensure fasteners are ANi>onsCa SOS SCREthiSINTO not within 1-1/2" of ENO ANDA3S•5 top of bottom of trim or framing members. Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers L°`a"°° Date Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 • Tel:(503)226-1286 Paz:(503)226-3130 Churl Shea no. Precision Rail of Oregon Page 11 of 13 FASCIA BRACKET INTO BLOCKING AT CONCRETE DECK (Detail 1/A7) Max;L=5 ft ;H=42 in+7 in=49.000 in - Per IBC ;M1 =200 Ibs*(H) =9800.000 lb_in ;M2=50 plf*L*(H) =12250.000 lb_in ; (50p1f controls) ;M2irid=M2* 1.6=19600.000 lb_in ;(LRFD) ;V=300Ib; (ASD) ;Vita=V* 1.6=480.000 lb;(LRFD) Anchor Tension;AT=M2/4.5 in=2722.222 lb; (ASD) 2 anchors per side ;Ts=AT/2= 1361.111 lb; (ASD) ;Tsifrd=Ts* 1.6=2177.778 lb;(LRFD) Try 3/8"diameter lag bolts and assume DF, ;Tallow=305 lb* 1.6=488.000 lb; per inch embedment Embedment requirement is: ;T=Ts/Tallow =2.789 ;inches Use(4)3/8"x 5"fully threaded SS lag screws at each post location. Secure blocking against rotation with 4 Simpson DTT2Z anchors or SDS screws on each side. BRt00 Aft PICKET VINYL& t00 SERIES RCB 4X OR(2)2X BLOCKING ANCHORED BACK TO THE JOISTS Wl DTT2Z ♦ ;.4 ANCHORS OR SDS SCREWS INTO a►• 4 END AND A35'S - 1 a. IIy / 6"FASCIA BRACKET ATTACHED IN/(4) / 4"X5"FULLY THREADED LAG SCREWS. I , /`/ It Ensure fasteners are not within 1-1/2" of top of bottom of trim or framing members. Project Job no. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers Lo"don Dam Tigard,OR 8/5/2020 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 12 of 13 POST AT STAIRS (Detail 1/A8) Max;L=5 ft; BR100 WI PICKET VINYL& 100 SERIES RCB ;H=36in Per IBC 3'X STAIR STRINGER BY OTHERS • ;M1 =200 lbs*(H) =7200.000 lb_in 1/,'X3X8ANGLED BASE PLATE ;M2=50 plf*L*(H) =9000.000 lb_in ;(50p1f controls) ATTACHED W;(4)C'X6'FULLY THREADED LAG SCREWS. Anchor Tension;AT=M2/2 in=4500.000 lb ,o 0 1/.- 2 anchors per side ;Ts=AT/2=2250.000 lb ;(ASD) TYP Try 3/8"diameter lag bolts and assume DF, ;Tallow=305 lb* 1.6=488.000 lb; per inch embedment Embedment requirement is: ;T=Ts/Tallow=4.611 ;inchesUSE(4)3/8"diameter fully threaded SS lag screws with 6.15 in min embedment at each post location. 3i7' H .� V.I.F. • J cn en Project John°. James G. Pierson, Inc. Summer Creek Apartments Consulting Structural Engineers t°mot"° Date Tigard, OR 815/2020 610 S.W.Alder,Sunk'l18 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 13 0113