Loading...
Correspondence '23r2o2O -va 2-73 /Mi'220 SW '23" PL Dianna Ornelas From: #Building Permit Technicians Sent: Tuesday, November 3, 2020 2:24 PM To: 'Joe Ross' Cc: UB Online; Mai Quach Subject: RE: FW: MST2020-00273 - Brooks - 14220 SW 128th PI Hello Joe, I understand that this news is quite significant in regards to moving forward to complete this project. You have some good questions and I have copied our Utility Billing division to respond to your questions, and specifically to address payment options for the water meter SDC upcharge. The only options that we have to offer our customers is that they reduce the number of fixtures being added to get below the level where a water upsize is required. In this case, however, UB indicated that the original 5/8" meter installed when the residence was constructed in 2002 was the typical meter size installed in those days. Since that time, UB has required larger meters based on the current worksheet fixture counts. Thank you and please keep in touch to let us know if anything changes with your project going forward. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From:Joe Ross<joe.ross@rossindustriespdx.com> Sent:Tuesday, November 3, 2020 9:08 AM To:#Building Permit Technicians <TigardBuildingPermits@tigard-or.gov> Subject: Re: FW: MST2020-00273 - Brooks- 14220 SW 128th PI Warning! This message was sent from outside your organization and we are unable to verify the sender. Good morning, Diana. Thank you for the quick turnaround of the assessment. The additional $15K to upgrade to the 1", especially hearing that the system should have originally been 3/4" was a real bummer. I was trying to consider and wanted to ask if there are any alternative work arounds to avoid the significant charge? Or, is there a way to perhaps amortize the charge on the client's water bill? As I'm sure I'm not the first to run into this, any help or guidance would be greatly appreciated.Thank you. Cheers, Joe Ross Owner 503-528-4443 yr�s �/�) � [DJ 1 On Thu, Oct 29, 2020 at 6:35 PM #Building Permit Technicians<TigardBuildingPermits(a)tigard-or.gov>wrote: Hello Joe, Thank you for working with our UB department to complete the water meter worksheet. The water meter will need to be upsized and installed prior to final inspection on the building permit to convert the space for the new laundry room and adding the bathroom to the old laundry room. This permit is now ready to issue and the balance due is$629.70 (see attached invoice). The fees can be paid online at https://aca-prod.accela.com/TIGARD/Welcome.aspx by searching for the permit record number MST2020-00273 under the Building tab. Payment can be made by'card'for a 3% service fee or select the 'check' payment option and there is no service fee. Please email the permit technicians at TigardBuildingPermitsPtigard-or.gov once the fees are paid so that we can issue the permit and make it available for pick up. Thank you. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits 2 From: UB Online<UBOnlinepay@tigard-or.gov> Sent:Thursday, October 29, 2020 5:30 PM To:Joe Ross<joe.ross@rossindustriespdx.com> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: MST2020-00273 - Brooks- 14220 SW 128th PI Good Afternoon All, After clarifying fixtures on the worksheet with Joe Ross, the corrected worksheet is attached. The current meter is a 5/8 inch size though they should be at a % inch size. With the additions, the meter will need to be increased to a one inch meter. Kind Regards, Jill (she/her/hers) A WG6,, Jill Rt100 LAM BE Aktj e " City of Tigard -Utility Billing 1116111114 Senior Accounting Asst TIGARP (888)826.7211 Payment s (503)718-2460 LIB 1-lain jillb@tigard-or.gov (503)718-2494 .J C {[ r 13125 SW Hall Blvd. R i w= Tigard, OR 97223 From:Joe Ross<joe.ross@rossindustriespdx.com> Sent:Thursday,October 29, 2020 10:28 AM To: UB Online<UBOnlinepay@tigard-or.gov> Subject: Re: MST2020-00273 - Brooks- 14220 SW 128th PI Good morning,Jill! 3 Thank you for the follow-up- I wasn't 100% how to represent a few things. Current bathroom sinks and toilets are 4 and 3, respectively. Then the additions are 1 sink, 1 toilet, and 1 bathtub/shower. Cheers, Joe Sent from my iPhone On Oct 29, 2020, at 8:29 AM, UB Online<UBOnlinepay@tigard-or.gov>wrote: Joe, I am reviewing your fixture unit worksheet. Please tell me how many bathroom sinks and toilets there re currently. The current paperwork shows 3 bathroom sinks (lavatory), and one toilet (water closet).The addition shows one more bathroom sink and one bathtub/shower combo. Is this correct? Kind Regards, Jill (she/her/hers) <i mage004.j pg> <image003.jpg> 4 From:Joe Ross<joe.ross@rossindustriespdx.com> Sent:Wednesday, October 28, 2020 8:07 PM To: UB Online<UBOnlinepay@tigard-or.gov> Subject: Fwd: MST2020-00273 - Brooks- 14220 SW 128th PI To Whom It May Concern: Per Dianna's instructions, attached is the filled out spreadsheet for the Brooks residence that we are doing a remodel and adding a few fixtures. Hopefully, I filled it out correctly, but if you have any questions please let me know. Thank you in advance for your time. Cheers, Joe Ross Owner 503-528-4443 ro) 100. � j Forwarded message From:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Date: Wed, Oct 28, 2020 at 6:49 PM Subject: RE: MST2020-00273 - Brooks- 14220 SW 128th PI To:Joe Ross<joe.ross@rossindustriespdx.com> Cc: UB Online<UBOnlinepay@tigard-or.gov> Hello Joe, Thank you for the clarification. 5 When additional plumbing fixtures are added to an existing dwelling, the applicant must complete the attached water meter fixture worksheet and submit to our Utility Billing (UB) division to determine if the existing water meter is adequate to serve the new total plumbing fixtures. UB then emails back their approval of the worksheet. Typically for home remodel projects, we issue a single combination or'master' permit that encompasses all trades, building, mechanical, electrical and plumbing in one single permit. Unfortunately, only the building permit application was submitted to us for plan review, and the description of work reads "convert existing framed/roughed-in storage area to laundry room" and it does not mention that additional plumbing fixtures were being added to the old laundry room, and the plans do not show the old laundry room with new bathroom fixtures. Also,the plumbing permit obtained online by the contractor does not accurately describe that additional fixtures were being added, it just reads "laundry/bathroom/kitchen remodel". In summary, we were unaware that additional plumbing fixtures were being added to this dwelling until now. We need the attached worksheet completed and emailed to UBOnlinepay@tgard-or.gov as soon as possible for their approval. UB will email a copy of the worksheet and their approval to the permit technicians after their review so that we can complete post-review and make this permit ready to issue. Thank you and please let me know if you have any questions. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From:Joe Ross <Ioe.ross@rossindustriespdx.com> Sent:Tuesday, October 27, 2020 5:27 PM 6 To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Re: MST2020-00273 - Brooks- 14220 SW 128th PI Hi, Dianna! Yes, most certainly and I apologize for not including the additional details. A vanity, toilet, and bathtub were added in the old laundry room. Please let me know if I can provide any additional information, and thank you for working on the review; I know things are quite crazy as we all grind through the pandemic. Cheers, Joe Ross Owner 503-528-4443 0 f On Tue, Oct 27, 2020 at 5:15 PM #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> wrote: Hello Joe, I am post-reviewing your permit and plans for invoicing and I noticed the permit description reads `convert existing framed/roughed-in storage area to laundry room'. Did the washer and dryer already exist in this dwelling, but was located in another place? I need to know if there were any plumbing fixtures(washer, sinks, etc.)that were added to this dwelling that did not exist before the remodel. Please confirm. Thank you. Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 8