Loading...
Permit 71 CITY OF TIGARD BUILDING PERMIT = COMMUNITY DEVELOPMENT Permit#: BUP2020-00215 Date Issued: 11/12/2020 T I G A It D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S102DB00301 Jurisdiction: Tigard Site address: 13070 SW ASH AVE 10 Project: Alderbrook Apartments Subdivision: BURNHAM TRACT Lot: 8 Project Description: Deck replacement for units:2, 3,6,7, 16, 18, 19,22,23,26,27,30,31,34,35. Contractor: T& H HOMEBUILDERS Owner: CARNEY, GEORGE V&GWENDOLYN J 21611 S CLEARVIEW CT 14185 SW 144TH AVE PORLAND, OR 97045 TIGARD, OR 97224 PHONE: 503-309-1819 PHONE: 503-223-3171 FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: ALT Type of Const: VB DC Provision Review,COM TI-Ping 11/12/2020 $102.00 Occupancy Grp: R-2 Occupancy Load: 0 Permit Fee-Additions,Alterations, 11/12/2020 $752.04 Demolition Dwelling Units: 12%State Surcharge-Building 11/12/2020 $90.24 Stories: Height: ft Plan Review 11/12/2020 $488.83 Bedrooms: Bathrooms: Info Process/Archiving-Sm$0.50(up to 11/12/2020 $6.00 Value: $52,500 11x17) Tigard CET-Non-Residential-Admin 11/12/2020 $21.00 Tigard CET-Non-Residential-AH 11/12/2020 $504.00 Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $1,964.11 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: 'v\\..3 1\J `an 1IN) w< Permittee Signature: (�rx app 1 ; `a ` , u v, Call 503.639. 175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial ,"} !f v e�' j FOR OFFICE USE ONL1 I - City of Tigard natesy la f.5/7.0 Q, PernroNo::aup��-OO'�C I q 13125 SW Hall Blvd.,Tigard,OR 97223 S EP 2 9 2020 Plan Reviow' 11 Phone: 503-718-2439 Fax: 503-598-1960 Dateit1 O-)7—]a J J Related Permit: TIGARD Inspection Line: 503-639-4175 ,---t 1 't "N DateReadv/By: 4ayy t��'�s Bl See Page 2 for Internet: www.tigard-or.gov �-fi E t ' "`d r r` Nonfied.Mlethod; �)� 7Q r l i I � y l -,, (� Supplemental Information • TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILYDWELLING ❑ New construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY' OF CONSTRUCTION work indicated on this application. El I-and 2-family dwelling ElCommercial/industrial Valuation: $ ❑Accessory building it Multi-family Number of bedrooms: ❑Master builder ElOther: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 13070 Sw Ash St New dwelling area: square feet City/State/ZIP: Tigard, Oregon 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name: Alderbrook Apt's Covered porch area: square feet Cross street/directions to job site: Sw Hill street Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Remove and replace 15 decks per existing permit BUP2019-00272 Valuation: $ 52,500 Units#2/3/6/7/18/19/22/23/26/27/30/31/34/35 Existing building area: 30 800 square feet New building area: square feet ® PROPERTY OWNERme, a.i - 0 TENANT Number of stories: Name: Patrick Carney CO Norris & Stevens Ty pe of construction: Address: 900 SW 5th Ave 17th Floor Occupancy groups: City/State/ZIP: Portland, Oregon 97204 Existing: Phone:( 50M23-3171 Fax:( ) New: 151 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: T&H Homebuilders.InC moue trkr wee sehedakl Structural plan review fee(or deposit): Contact name: Slmhoni Cohen AKA Jack FLS plan review fee(if applicable): Address: 21611 S, Clearview et Total fees due upon application: City/State/ZIP: Oregon City, Or 97045 Phone:( 5034309-1819 Fax::( ) Amount received: E-mail: jack@tandhhomebuilders.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: Same as above Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) Fax ( tState surcharge(12%of permit fee): $21.60 CCB Lic.: 204877 Total fee due upon application: $201.60 .. alt...,.., Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Simhonl ohen Date: 9/15/2020 * Fee methodology set by Tri-County Building Industry Service Board. 1:1Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(I 1/02/COM/WEB) City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT ta T 1 c,n x D Building Permit Review — Commercial - No Land Use Building Permit #: 'lei) —0063/5-- Site Address: 13070 SW Ash Ave Suite/Bldg#: Project Name: Alderbrook Apartments (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Remove/replace decks like-for-like; maintenance and repair Existing Business Activity: Apartments Proposed Business Activity: Apartments QVerify site address/suite# exists and active in permit s stem. ElRiver Terrace Neighborhood: 0 Yes LI No ❑. Zoning: R-12 ElPermitted Use: U Yes U No U Spec Space 0 Confirm no land use required. ❑a Business License: N/A Exists: ❑ Yes 0 No, applicant was provided a business license application Notes: • Approved by Planning: Date: 9/30/20 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: L( VIZ) Site Plans: # 7 Building Plans: 6 ���� Building Permit#: En uildin ermit ove. Workflow Routing: lanning errnit Coordinator D-13 ild,ng Workflow Sign-off: LE105`eipiofor Planning (include notes from planning review) Route Application Documents: uilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: � � Date: W.57 1:\Building\Forms\BldgPermitRvw_COM_NoLan dUse_111819.docx Engineering Review �/ ❑ Slope at building pad: 6 v //il ❑ PFI Permit#: /1/t,,1 ❑ Conditions "Met"prior to issuance of building permit de ❑ Easements (encroachments)per engineering conditionsnit of approval and plat(not typical on SDR/CUP) O Water Quality/Quantity Facility: /v Al— Assess Water Quality Fee in-lieu: ❑ Yes 0 No Assess Water Quantity Fee in-lieu: 0 Yes 0 No LIDA Facility on lot: 0 Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: fb��/2:3 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review lEonditions "Met"prior to issuance of building permit O Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: y Date: tot 8(io I:\Building\Forms\BldgPemiltRvw_COM_W ithLandUse_111819.docx