Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT • ' COMMUNITY DEVELOPMENT Permit#: MEC2020-00672 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/10/2020 Parcel: 2S102AA00600 Jurisdiction: Tigard Site address: 12045 SW HALL BLVD Project: 7-Eleven Subdivision: TIGARD HIGHWAY TRACTS Lot: 12 Project Description: Install(2)condensers&(2)sandwich cases Contractor: COOLSYS COMMERCIAL& INDUSTRIAL SOLUTION; Owner: ALPROP LLC 5506 SE INTERNATIONAL WAY 4905 SW GRIFFITH DR STE 205 MILWAUKIE, OR 97222 BEAVERTON, OR 97005 PHONE: 503-231-7717 PHONE: FAX: 503-652-0449 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 11/10/2020 $305.56 Class of Work: ALT Type of Const: VB Plan Review 11/10/2020 $76.39 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 11/10/2020 $36.67 Stories: Info Process/Archiving-Lg$2.00(over 11/10/2020 $2.00 11x17) Project Valuation: $8,500.00 Info Process/Archiving-Sm$0.50(up to 11/10/2020 $1.50 11x17) Fuel Air Handlers Fuel Types: Electricity Units<10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $422.12 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: condensers Duct Work: and Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: k�A 1 P. ° (Z� �Q� ermittee Signature: O f v jAr/ Glc� lllitt IIIILL000JJJ Call 503.639.4175 by 7:00 a.m.for the next available inspection date. v l l� This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 6- Its( Mechanical Permit Application City' of Tigard RECEIVED Received tit Date/By: Permit No.. 13125 SW Hall Blvd.,Tigard,OR 97223 �� �� © ����� Plan Review Phone: 503.718.2439 Fax: 503.598-1960 OCT q�q� DateBy: ���. �� Other Permit.. Inspection Line: 503.639.4175 6 L L , y, Ed See Page 2 for if TIGARD Date Ready/ t�Es. Internet: www.tigard-or.gov CITY OF TIGARD Notilied/Method-/1 l/-/23 � G�0 �C Supplemental Information BUILDING DIVISION 6411 41(-- ( Vi 1'1-PE OF WORK (OBUii/R( 1i1 FET- SC'IIFDt IF — I SL:CHECKLIST ❑New construction ®Addition/alteration%replacement Mechanical permit fees*are based on the value of the work performed.Indicate the value(rounded to the nearest dollar)of all ❑ Demolition ❑ Other mechanical materials.equipment,labor,overhead,and profit. Value:$8500 CATEGORY OF ('OIS'tifRCC1IOA RESIDENTIAL EQUIPMENT/SYSTEMS FEES' ❑ I-and 2-family dwelling 1i1 Commercial/industrial El❑Ace' 'o r huh dire For special information use checklist. ❑ Multi-family ❑Master builder ❑ Oct- Description Qty. Fa, Total JOB SITE INEORI11.11ION :LAD LOC.1"PION Heating/cooling: Air conditioning 46.75 Job site address: 12045 SW Hall Blvd. Furnace 100.000 BTU(ducts/vents) 46.75 City/State/ZIP:TigardOR 97223 Furnace 100,000+BTU(ductsivents) 54.91 1 feat pump 61.06 Suite/bldg./apt.no.: I Project name:7-itDuct work 23.32 Cross street/directions to job site: I Iydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: 1 I.,ot no.: Other: 23.32 Other fuel appliances: Ins mop/parcel no.: Water heater 23.32 DESCRIPTION OF %PORK Gasfireplaceiinsert 33.39 Flue vent for water heater or gas INSTALL 2x CONDENSERS, 2x SANDWICH CASES fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 Ocher 23.32 ❑ PROPER IN OWNER I 0 1EN:1N"r Environmental exhaust and ventilation: Name:*SAME AS ABOVE* Range hood/other kitchen — equipment 33.39 Address: Clothes dryer exhaust 33-39 City/State/ZIP: Single-duct exhaust(bathrooms_ 1 toilet compartments,utility rooms) 23.32 Phone: ( ) I•as:( I Attic/crawlspace fans 23.32 2. .APPLI('ANT ❑ C ONTAC'T PERSON Other: 23.32 Business name:Coolsys Fuel piping: $14.15 for first four;$4.03 for each additional Contact name:Kevin Royal! Furnace.etc. Address:5506 SE International Way Gas heat pump heater City/State/ZIP:Milwaukie, OR 97222 Water heater Phone:( )5032317717 j Fax: :( ) Fireplace Range [-mail:KRoyall@coolsys.com Barbecue -('ON'1'RWI OR Clothes dryer(gas) Business name:**same as above** Other: NIECEPERMIT FEES* Address:**same as above** Subtotal City/State/ZIP:**same as above** Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:( )**same as above** Fax:( ) State surcharge(12%of permit fee) CCB lie.:149200 TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature Z7a ,'l� c5"� " Fee methodology set by Tri-County Building Industry Service Board Print name: David Scheuermann Date:10-05-20 4/).2. /L 1413uilding\Permits1MEC_PernAlpp_040 113.doe 440-4617T(I I/01/COMA4EB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: • Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee $69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including S I 0,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof., to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first S50,000.00 and $2.49 for each additional $100.00 or fraction thereof. to and including $100,000.00. $100,000.01 and up $2,608.71 for the first S100,000.00 and $2.92 for each additional $100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. 1.\Buildure\Permits\MEC_PermitApp_040I I3_doc 2 /0/Zo City of Tigard 11 COMMUNITY DEVELOPMENT DEPARTMENT TIGnRD Building Permit Review — Commercial - No Land Use Building Permit #: McCZ9Z0- OO '72 Site Address: 12045 SW Hall Blvd Suite/Bldg#: Project Name: 7-Eleven (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Install 2 rooftop condensers and 2 sandwich cases Existing Business Activity: Sales-oriented retail Proposed Business Activity: Sales-oriented retail ❑o Verify site address/suite# exists and active in permit s stem. ❑s River Terrace Neighborhood: ❑ Yes No ❑° Zoning: MU-CBD ❑. Permitted Use: U Yes U No U Spec Space HConfirm no land use required. O Business License: Exists: ❑o Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: sovWL- Date: 10/7/20 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 2 Site Plans: # 2 Building Plans: # 2- Building Permit#: Enter building ermit# above. � Workflow Routing: ❑'Planning U Permit Coordinator @ Buiding Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans, building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: / By Permit Technician: AO/ Date: /d/ ,/ 12o 1:1B uilding\Forms\BI dgPermitRvw_COM_NoLandtJse_l 11819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building pe t ❑ Approved,NOT Released: Date: Notes: ' Revisions (after Building Submittal only) Revision Notice 1: Date Sent to A..;can : Revision Notice 2: Date Sen 'pplicant: Revision Notice 3: Da - 'era to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: 0 Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\B ui I ding\Forms\B IdgPermitRvw_COM_NoLan dUse_1 11819.docx