Loading...
Plans t 7 10'0" t I OFFICE COPY CITY OF TIGARD„ : E D FOR CODE COMPLIANCE roved: I 0 O O O O O 0 bTG [ I I i'crmit#: mPGae)a CI - or S Rr) 20'0" BUILDING A -Address: J 1)4- CI S w J-4 e11 f3/V c4 Tithe #: ji)d 8 I y:--i-}-- Date: � 9-ai ao PARKING I I I 1 _ 0 1 HALL BLVD I 0 I 0 BUILDING C 1 I — I — I 0 I I _ _ I COMM BLDG I 0 O I BUILDING B f I I I i10%0" I I— PL PLOT PLAN VALIDITY OF PER'!iiT RADON MITIGATION NORTH LEGEND: THE ISSUANCE OF A PERMIT 11157 SW HALL BLVD. O INTERIOR ROUTED SCALE: 20'0" ---►I BASED ON CONSTRUCTION DOCUMENTS AND OTHER TIGARD, OR 97223 RADON VENT SYSTEMS DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS. OSSC 105.4 NORTH RADON MITIGATION SYSTEMS VILLAGE AT WASHINGTON SQUARE 11157 SW HALL BLVD. TIGARD, OR 97223 BED BED BED BED BED BED BATH 01 0 I L 1i BED BATH BATH KITCH BATH T KITCH UNIT B3 KITCH UNIT B2 UNIT B1 LIV RM LIV RM LIV RM ENTRY ENTRY ENTRY BUILDING B LEGEND: 1st FLOOR PLAN 0 RADON THRU-FLOOR SUCTION POINT SCALE: I 10'0" -II AND VERTICAL SCHDL-40 PVC VENT PIPE. SEE SCHEMATIC NORTH RADON MITIGATION SYSTEMS VILLAGE AT WASHINGTON SQUARE 11157 SW HALL BLVD. TIGARD, OR 97223 BATH BED BATH BATH KITCH STAIRS KITCH UP KITCH 0 0 LAUNDRY LAUNDRY IBATH KITCH LIV RM LIV RM LIV RM STAIRS UNIT B4 STAIRS UP UNIT B5 LIV RM UNIT B7 UNIT B6 ENTRY ENTRY ENTRY ENTRY BUILDING B 2nd FLOOR LEGEND: 0 RADONVERTICAL SCHDL-40 PVC VENT PIPE. SCALE: I 10'0" -► SEE SCHEMATIC NORTH RADON MITIGATION SYSTEMS VILLAGE AT WASHINGTON SQUARE 11157 SW HALL BLVD. TIGARD, OR 97223 I BED BED BED BED BED I STAIRS DWN DI I G I I O I I STAIRS T I BATH DWN STAIRS -F BATH ROOF BATH I DWN I UNIT B7 UNIT B5 I UNIT B6 I I BED BED BED BED BED I I BUILDING B 3rd FLOOR LEGEND: 0 RADON VERTICAL SCHDL-40 PVC VENT PIPE. SCALE: I 10'0" -0-I SEE SCHEMATIC � v2a-ea 5 go /!/59 sty()ikolc A/ llO SCREENED EXHAUST RCOF FLASHING ;///7 ROOF AS PER PLAN 4 .�. ir"s" •�`4 \ \ g� [AUG 2 1) 2020 T`� �"�s NG F" i li t ,° ' I� p r , i rLr,.,..', ;;;III 1, ,I BRACE /_ _ INLINE DUCT FAN AS PER SPECS /.. 1 / ATTIC "�- FERNCO CONNECTOR T. 110-VOLT WIRING ' + 110V ELECTRICAL DISCONNECT / �� — LOCATION.N6FTO BE LOCATED T/// AIRFLOW--.— IMTHINBFEET OF FAN r �% --- STRAPPING(ORSUPPORT THER SUPPORT)TO SUPPORT PIPING WEIGHT -- SYSTEM FAILURE WARNING AS PER SPECS. —'-ABS OR PVC T-FITTING, STRAPPING(OR OTHER CEMENTED TIGHTLY TO SUPPORT)TO SUPPORT PIPING fa ADJOINING PIPE WEIGHT I JOIST. PER WALL TYPE 1 I MI.' �—AIRFLOW ' I 3 I I 1-HOUR FIRE BARRIER SO THAT CONDENSATE DRAINS TO I ®ALL RATED SUCTION POINT,PIPING SHALL I PENETRATIONS HAVE NO LOW POINT. 3"DIA.SCHEDULE-10 VENT PIPE.TYP. 1 SEAUCAULK PIPE PENETRATION,TYP. O FLOOR PER PLAN 0. EXCAVATED SUCTION POINT cc OACMFILL SUMP PIT VnITH CLEAN VW-1-1R GRAVEL OR THE LIME. ADEQUATELY SECURE VENT PIPE ME Mr. 11=111=1 1=111=11=111=111=111=111=11 111 11 I I I 1 I 1- I—I I I_I I IJ I I—III I I I_I I III I I-1 11 IE]11 I I 1=i 1 1-1 Y I�I I I I I��III I I_1 I I111'�I 111=111 1 I 1 111=1":1=1 11I 1=111-�I111=1 I I, a.-..1, II—III—III III—III IIi III—IIt—III—I11 III—III III III III- , •.. . . .. _ .. ACTIVE SOIL DEPRESSURIZATION (ASD) SCHEMATIC / NTS _ . Product Information Firestop Collar o\ (CP 643N) Product description • A ready-to-use firestop collar,made of a galvanized steel housing and intumescent inserts for firestopping combustible pipes - Product features 'at Ready-to-use collar / I r No construction required Fast installation time Adjustable mounting tabs Low profile for tight installations i Areas of application Firestopping combustible pipes up to 6"diameter in penetrations Technical Data CP 643N through fire walls and floors Pipe Collar Collar No.of Suitable for the following pipe materials: outside outside Height hooks and PVC,CPVC,ABS,PVDF,PP and FRPP Description dia(In.) dia.(in.) (In.) fasteners For use with CP 643-50/1.5"N 1.4-2.0 2.8 0.9 2 Concrete,masonry,wood floor and gypsum wall assemblies CP 643-63/2"N 2.0-2.5 3.4 1.3 2 Wall and floor assemblies rated up to 4 hours CP 643-90/3"N 2.6-3.6 4.9 1.7 3 CP 643-110/4"N 3.6-4.5 6.0 1.9 3 Types of installation CP 643-160/6"N 6.6 9.8 1.9 4 Wall:two collars,one on each side Temperature resistance -40°F to 140°F(-40°C to 60°C) — Floor one collar on underside(bottom) Intumescent activation Approx.392°F(200°C) Example Expansion ratio(unrestricted) Up to 1:10 Waste water pipes Tested in accordance with Fresh water pipes •ULli, 1479 •ASTM E 814 •ASTM G21 INFI THROWN-PENETRATION OP N-PEN FOR USE IN THROIKH-PENETRATION EVICE FIRESTOP SYSTEMS FIESC +''s'••o�'•*�r CUSSEE UL.FIRE RESISTANCE DIRECTORY APPROVED Visit mmymanmmpaaa.mm. 5N76 fec°.Is aauuae,nrk Of tat wwzd Corporator. Installation instructions for CP 643N Notice Application of firestop system 5. Fastening the CP 643N Firestop Collar. Only when • Before handling,read Material Safety Data Sheet and 2. Seal the opening if required.Gaps may be closed fastened properly can CP 643N offer protection product label for safe usage and health information. with FS-ONE.The approved methods vary and are against fire. • Instructions below are general guidelines—always given in the specific UL system. a. Mark the fastening points. refer to the applicable drawing in the UL Fire 3. Close the CP 643N Firestop Collar.Place the b. Drill holes with a Hilti rotary hammer drill(i.e. Resistance Directory or Hiki Firestop Systems Guide CP 643N Firestop Collar around the plastic pipe TE 4-A18)or,depending on base material,fasten for complete installation information and lock the closure by applying firm pressure until using Hilti powder-actuated tool. OpeningIt latches. c. To secure the CP 643N Firestop Collar,use Hilti 4. Attach fastening hooks.The fasteninghooks can 1. Clean the plastic pipes.Expansion of the anchors/fasteners. be intumescent material during a fire acts to close the attached to various points on the metal housing. d. For maintenance reasons,a penetration can be pipe.VerydirtypipesThis allows the fastening points to be made to suit plastic fie:with remains of permanently marked with an identification plate and the space available in each case.The hooks must mortar)may lead to a delay in this closing action. fastened in a visible position next to the seal. Soiled plastic pipes should,therefore,be cleaned in be positioned as symmetrically as possible.The the area where the CP 643N Firestop Collar is to be required number of fastening hooks is indicated on Not for use installed. the packaging. • With metal pipes • in highly corrosive surroundings f( With unapproved anchors/fastenars • • . ^� ill �// •gr � Storage 1� j • Store only in the original packaging in a location '�I� �., C't protected from moisture • 1.Clean plastic pipe. 2.Close remaining gap to 3.Close collar. 4.Attach fastening hooks 5.Fasten collar and provide smoke end gas identMcatbn plate resistant seal. (If requlredl. L HMI Firesttop Saving lives thronotion and education innovation Hilti. Outperform. Outlast. Hilti,Inc.(U.S.)1-800-879-8000•www.us.hilti.com•en espanol 1-800-879-5000•Hilti Firestop Systems Guide Installation and Operation Manual Manuel d'installation et d'operation Rn2EC Rn4EC Inline EC Radon Fan • Ventdateur pour radon en ligne EC PARTS IN THE BUR Illn2ECI PARTS IN THE SOH EfIn4ECI -^-::- • z-11.1 ".1:sual PIECES OARS LA atliTE TRAPECI PIECES BANS LA SUITE IRnAECI J I COUSIlVI CVATIFIED Ra4EC ID i• CFE:E: .= I.t.; • r • .11 -en lanteur' . .4 • Technical I Customer Support: 4 : fa ntec h ' Umted Soto F Canada sys:E.'re