Loading...
Plans rr A202O- 002-7 I tt133swrcx� RECEIVED -- v4.6 , __- SEP 15 2020 ' PROJECT AMASS: 2_°• 6-0'* t �e4p PROA•f cTY - i IGARD m33 SW r0RLA7U STREET t7' 1Nf f�% BUILDING DIVISION PORTLAND.OREGON PR(AFCT DESCRIPTION PUSH PIERS/1EUCAL ANCHORS ARE TO BE VOLUNTARILY INSTALLED TO PREVENT FURTHER SUBSIDENCE OF THE PASTING I � ROPEitn,LINE P T` 74 4OPE BLDG. 1E-BACKS ARE NOT REQUIRED.1 AND USE NOTE -it- / •' LANE PRE INSTALLATIONS ARE STl8GRADE&DO NOT AFFECT THE I I �.} V' EXTERIOR APPEARANCE OF THE STRUCTURE. T',y 44AFEL Wad '�CRITERIA; LEGEND EXPIRES: 06/30/22 LIABILITY 2O8 INTERNATIONAL BUILDING GORE gill ;LOAD The City of Tigard and its 201E 7- STRUCTURAL SPECIALTY CODE (RIPS).SEE DETAIL 3/Si employees shall not be AS(E 7-10 10 DESIGN LOADS: I IO responsible for discrepancies ROOF DEAD LOAD: 15 PSF FLOOR SNOW LOADOAD 25 PSF Um whi„h may appear herein. BOOR OEPD LOAR: IS PSF H' AREA OF REPAU "'�' ■ /'FLOOR LIVE LOAR AO PSF'WINO LOAD: NOT APPUCABLE IH3 / I OeSol s / ALLOWABLE SOIL BEARING 1500 PSF09W NE))TH AVENUE ALLOWABLE SOIL PASSIVE: 100 PSF/FT 16• ELUTE zTs VANCOUVER,WA 92662 11133 SW TORLO STREET -,,-t-°�� N "°_"»°' VALIDITY OF PERMIT MEM: PORTLAND,OREGON ALL DETAIL CUTS SHALL BE CONSIDERED TYPICAL Al LIKE to 7'ERRAFIRN1A CONDITIONS. MERE ANY DISCREPANCIES OCCUR BETWEEN PLANS, ,; THE ISSUANCE OF A PERMIT DETAILS,NOTES AND SPECIFICATIONS,THE GREATER REOLIREVIENT BASED ON CONSTRUCTION 444 FOUNDATION SYSTF.L7P 1]119 SA,WALL CTRECI SHALL GOVERN' PORTLAND DOCUMENTS AND OTHER o B6E 6eE 199 ESTABLISH AND VERIFY ALL GEOMETRY FOR ARCHITECTURAL, I o i —� DATA SHALL NOT PREVENT MECHANICAL.CRITICAL AND PLUMBING CONCERNS PRIOR ( THE CODE OFFICIAL FROM ID calsTRucTION.noN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE N. —'\ REQUIRING THE CORRECTION STRUCTURAL STABILITY OF ALL NEW ANo EASING STRUCTURES SW!ORLAND STREET C ; OF ERRORS.ORSC 105.4 DURING CONSTRUCTION. 71115 INCLUDES OAYATIOHS, AINS. W Z EQUIPMENT LOADS MATERIAL LOADS,ANDT)OTHERS OBSERVATIONS / 28'-6' EQUIPMENT / :r = BY THE ENGINEER- OF-RECORD DO NOT INCLUDE INSPECTIONS OF O SITESI PLAN I TEMPORARY LOADING AND STABILITY DURING CONSTRUCTION. ED L. 0. rr v W W r, W /B6 Z ` x HELIGN AND ES,HELICAL�� J Approved plans ALL PILES,HF11CAL BLADES FOUNDATION BRACKETS, HARDWARE.ETC.,SHALL BE MANUFACTURED BY SUPPORTNUMCS. INC.,AND DOCUMENTED IN LIES EVALEUATION REPORT 289. DRIVEN a (� Z, "hall be on job s!+�. g IrELRGAL PIES ARE m INSTALLED BY fill BACXFLL O FOUNDATION REPAIR PLAN ._ SUPPORTWORKS-CERTIFIED INSTALLERS. Z �. Q (E)GRADE Z m unr� t U, L i ^ CONCRETE ANCHORS(F REVD)SHALL RE SIMPSON OR EQUAL a ^ J,. (SPECIAL WSPECTa REWIRED) 342 SPECIAL INSPFCIIW. ilia .,• 4. en C T - L, ., C SPEaAL INSPECTIONS OF PILE INSTALLATIONS SHALL BE ^' CONTINUOUS&PERFORMED ACCORDING TO LIES ER 285,SECTION 14. INSPECTION SCHEDULE SHALL CONSIST O VERIFYING AND '. DOCUMENTING PILE AND BRACKET NUMBERS ON SITE.FOLLOWED BY _ _ ORSERVAIION OF THE FIRSTINSTALLATION'S LOCATION,MOMENT llali-if °METH.AND FINAL INSTALLATION-ORpIE VALUE,CORRELATED TO ! :LII THE RE D N LOAD. ON-SITE LOG BOOK FOR REMAINING r11R II I FOOTING BEYOND INSTALLATIONS WILL BE NERVED. A ANAL INSPECTION Cf THE INSTALLED REMNNING PILES AM)LOG BOOK DATA VALL BE ST 4ARD BRACKET ill CHP CUT POCKET RI(E)FWTING DOCUMENTED IN A BRIEF LETTER SUBMITTED TO THE BUILDING (SUPPORTWORKS P F55108BL POCKET AU1HORItt. ATTACH TO EON w/()T/2'0 K 4 i DIM TO FUJSH MATCH WALL YIDIH FOUNDATION 1/Y SS HUT KB-12(ICC ESR-1917 fi 3,/2'0 x 48'WIDE SLEEVE ii ENCASE TOP OF PIER W/20•A 20• REPAIR PLAN (SUPPORTWURKS P/N F55288E548) II CONCRETE 2 7/8.0 EXTENSIONS SEE PLAN (SUPPORTWORKS P/N PP288) NOTE PUSH PIER DEMENT SHALL 2 7/8.0 STARTER(P/N PP288)W/ BE I-0•MIN INSTALLED TO ACHIEVE • 3 1/2'0 FRICIIEN REDUCTION " 22 DESIGN LOAD NOTED ON THE COLLAR FOUNDATION PUN. 0 2 7/8"0 TYP PUSH PIER DETAIL S OFFICE COPY O DECEIVED STAMP SEP 15 2020 fatil PRorej, vFt��,AG4NEf� cdrr of, r; aRD ��paop BUILDING DdU15tp,J alma WA EXPIRES: 06/30/22 (E)2%FRAMING 0 le O.C. �.. Am STARK 4400 NE MN AVENUE SUITE 275 VANCOUVER,WA 56662 P:360.566.7303 cueNTFERRAFIRMA FOUNDATION SYSTEMS 13110 SW WALL EIREET PORTLAND,OR 57223 P:666.066.7156 PROJECT a � Qz z a., rp A ZE FRAMING) C%2 Z g Q4 ROOFFRAMING PLAN xwMa, REVISIONS ORANINGTI1lE FRAMING PLANS VAi P. SEE PLAN DATE. 09/04/20 SNEETNO 0 SECOND FLOOR FRAMING PLANT S2 DECEIVED Trr�r. r_r 2020 EP 1 5 STAMP �U�1*PROP C TIr� �eE9s��. BUILDINCITYG; DIVISION 4 4940P -'4Ri I ri s�,,' 4,MEL 06A EXPIRES: 06/30/22 STARK ■ ► • _ •► 4400 NE 7T121 AVENUE SUITE 276 VANCOUVER,WA 99662 P:360.566.7343 (E)2X FLOOR FRAMING 0 16'D.C. CUE"IFERRAFIRMA FOUNDATION SYSTEME 13110 SW WALL STREET PORTLAND,OR 97223 P:266486.7196 PROJECT, H wa z ca ° aA REVISIONS OFIRST FLOOR FRAMING PLAN src waw w DRAWINGTITLE FRAMING PLANS SCALE SEE PLAN DATE 09/04/20 S3