From: #Building Permit Technicians
Sent: Wednesday, August 5, 2020 6:59 PM
To: jakew@gsarchitects.net
Cc: Dianna Ornelas
Subject: RE: 9925 SW Greenburg Rd. - Temporary Building
Attachments: 200803 Temporary Bldg Narrative.pdf; EX-1 - SITE PLAN.pdf; BUP_COM_PermitApp.pdf;
CMS_PermitApp_022718.pdf; SIT_PermitApp_080216.pdf; ELC_PermitApp_ELR_ERE_
061715.pdf; MEC_PermitApp_042214.pdf; PLMF_PermitApp.pdf; PLMU_PermitApp.pdf
Hi Jake,
The temporary building will require a Building permit as well as a demolition permit(also the Commercial Building
Permit Application)considering the ructure will becupied for longer than six months. A separate Site Work permit
will not be required for the temporary building, as we can combine this work under the Site Work permit for the new
office building. I have attached all of the relevant applications above, and I have included information below to help
guide you through the submittal process.
New Building:
• Building permit: (3) sets of plans, (2) sets of Engineering calculations, and (1) wet stamp for the calculations. A
digital stamp may be substituted for a wet stamp. Mechanical, electrical, and plumbing pages that are included
with the tenant improvement plans will be stamped reference only, and therefore cannot be used for trade
permit plans. Please refer to the Commercial Building Permit Application for the submittal requirements. Also,
the plan review fee is required to be paid prior to commencing plan review. We will send you online payment
instructions once the permit has been created.
• Site Work permit: (3) sets of plans civil plans. Please refer to the Site Work Permit Application for the permit
requirements. The plan review fee is required to be paid prior to commencing plan review.
• Site Utilities Plumbing permit: (2) sets of plans. We do not require plan review to be paid at intake.
• Mechanical permit: (2) sets of mechanical plans with (2) sets of cut sheets. We do not require plan review to be
paid at intake.
• Electrical permit: Please review the electrical permit application attached above to determine if plan review is
required. If plan review is required, we will need to receive (2) sets of plans,and we do not require a plan
review deposit at submittal. If plan review is not required,the permit can be created online by the electrical
contractor through our website: https://aca.accela.com/TIGARD/Welcome.aspx. If the contractor has not
worked in Tigard previously, we will need to add their licenses to our database before a permit can be created
online. We do not require plan review to be paid at intake.
• Building Fixtures Plumbing permit: If the building will have a 2" water service or greater,then plan review is
required. In this case, we will need to receive (2) sets of plans to review. If plan review is not required, then
please make sure to complete the Commercial Fixture Work section on the second page of the Plumbing Permit
application. We do not require plan review to be paid at intake.
Temporary Building:
• Building permit: (3) sets of plans, (2) sets of Engineering calculations, and (1)wet stamp for the calculations. A
digital stamp may be substituted for a wet stamp. Mechanical, electrical, and plumbing pages that are included
with the tenant improvement plans will be stamped reference only, and therefore cannot be used for trade
permit plans. Please refer to the Commercial Building Permit Application for the submittal requirements. Also,
the plan review fee will be required to be paid prior to commencing plan review. We will send you online
payment instructions once the permit has been created.
1
• Demolition permit: (2) sets of a site plan showing the footprint of the building with the square footage listed,
erosion control fencing,tree protection, and pedestrian protection if applicable.
Temporary Job Trailer: (a typical job trailer on wheels will not require a permit. However, if the trailer will have a
foundation, or if there will be public access to the trailer, such as a sales trailer, then the following permits are
required)
• Commercial Manufactured Structure permit: For the placement of the sales trailer. See page 2 of the
application for the items required at submittal. We do not require plan review to be paid at intake.
• Building permit: For the accessibility ramps, covered porch, patio,windows and any other modifications made
to the sales trailer. See pages 3 and 4 of the application for the items required at submittal. The plan review fee
is required to be paid prior to commencing plan review.
• Mechanical permit: For installation of furnace,A/C, and any other mechanical items. Provide (2) copies of
equipment cut sheets at submittal.
• Plumbing permit application: For building fixtures and sanitary sewer line work. The plumbing permit
application will also generate a sewer connection permit and SDC fee of$5,685.00. When the sales trailer is
removed, this sewer connection will be used for the new residential structure on the lot and the SDC fee will be
credited. No plans required.
If you have additional questions, please let me know.
Thank you,
Branden Taggart
City of Tigard
m Senior Permit Technician
Community Development
13125 SW Hall Blvd
Tigard, OR 97223
(503)718-2449
brandent@tigard-or.gov
From:Jake Weber<jakew@gsarchitects.net>
Sent:Tuesday,August 4, 2020 8:12 AM
To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Cc: Lina Smith <LinaCS@tigard-or.gov>
Subject: 9925 SW Greenburg Rd. -Temporary Building
Caution!This message was sent from outside your organization.
Hi,
We're currently under review for land use adjustment and minor modification for a new building at Crescent Grove
Cemetery at 9925 SW Greenburg Rd. We plan to have a temporary building in place during construction to serve the
cemetery staff. See attached site plan and narrative. Can you direct me to any separate applications this will require, or
will this be a part of the building permit application?
Thanks,
J.
2
JAKE M.WEBER,AIA
PRINCIPAL
GIULIETTI .SG -1Uf - ;'
AIA ARCHITECTS
2800 NW THURMAN ST,PORTLAND,OR 97210
CELL 503 975 3376
OFFICE 503 223 0325
FAX 503 241 9323
GSARCHITECTS.NET IFACEBOOKIHOUZZIINSTAGRAM
SEE OUR WORK IN A NEW PUBLICATION BY PANACHE
PACIFIC NORTHWEST HOMES
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
3
t
Branden Taggart
From: Jake Weber <jakew@gsarchitects.net>
Sent: Tuesday, August 25, 2020 12:42 PM
To: #Building Permit Technicians
Cc: Dianna Ornelas
Subject: RE: 9925 SW Greenburg Rd.
Caution!This message was sent from outside your organization.
Understood—The wheels will be removed in order to set the building 30" above grade which makes our ADA ramp a
standard module from the provider.Thanks!
J.
JAKE M.WEBER,AIA
PRINCIPAL
x ---
----------
2800 NW THURMAN ST.PORTLAND,OR 97210
CELL 503 975 3376
OFFICE 503 223 0325
FAX 503 241 9323
GSARCHITECTS.NETIFACEBOOKIHOUZZIINSTAGRAM
SEE OUR WORK IN A NEW PUBLICATION BY PANACHE
PACIFIC NORTHWEST HOMES
From: #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Sent:Tuesday,August 25, 2020 12:36 PM
To:Jake Weber<jakew@gsarchitects.net>
Cc: Dianna Ornelas<Dianna@tigard-or.gov>
Subject: RE: 9925 SW Greenburg Rd.
Jake,
Thank you for clarifying. The plans we received depicts the manufactured structure with wheels,which is why I called to
clarify. If the wheels remained, then permits would not be required. Thank you for confirming that the structure will be
anchored to a foundation.
Thanks,
1
t
Branden Taggart
;. n City of Tigard
B L . Senior Permit Technician
Community Development
13125 SW Hall Blvd
Tigard, OR 97223
(503)718-2444
brandent@tigard-or.gov
From:Jake Weber<jakew@gsarchitects.net>
Sent: Monday,August 24, 2020 4:49 PM
To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Cc: Branden Taggart<brandent@tigard-or.gov>
Subject: 9925 SW Greenburg Rd.
Hi Branden,
Just confirming after our phone call this afternoon,that the manufactured structure placement application I just
submitted for 9925 SW Greenburg Rd. will require a piers and pad foundation per the drawings submitted with the
permit.
Thank you!
J.
JAKE M.WEBER,AlA
PRINCIPAL
x
2800 NW THURMAN ST.PORTLAND,OR 97210
CELL 503 975 3376
OFFICE 503 223 0325
FAX 503 241 9323
CSARCHITECTS.NET IFACEBOOKIHOUZZIINSTAGRAM
SEE OUR WORK IN A NEW PUBLICATION BY PANACHE
PACIFIC NORTHWEST HOMES
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
2