Correspondence Bi - 001
11-IOa0 ch! 72nd �1/e
CROWN 1505WestlakeAveN, Phone (206) 336-3204
Seattle,WA 98109 Fax:
CASTLE 'Mw+.crowncaslle.cor
RECEIVED
August 18,2020
AUG 2 4 2020
City of Tigard CITY OF TIGARD
13125 SW Hall Blvd BUILDING DIVISION
Tigard,OR 97223
RE: Eligible Facilities Request to modify equipment on a communications tower located at:
1402o SW 72nd Ave.,Tigard,OR,97224
Crown Site Number: 824674/Crown Site Name:I-5&Highway 217
Customer Site Number:POo1316D/Application Number:525668
Crown Castle USA Inc.("Crown Castle")on behalf of T-Mobile West LLC("T-Mobile")is submitting the attached
Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at
1402o SW 72nd Ave.,Tigard,OR 97224 in CITY OF TIGARD,OR(the"I-5&Highway 217 Tower").
Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum Act"
(Pub.Law No.112-96,126 Stat 156),mandates that state and local governments"may not deny,and shall approve,any
eligible facilities request for a modification of an existing wireless tower or base station that does not substantially
change the physical dimensions of such tower or base station." Additionally,if"the reviewing State or local government
determines that the application is incomplete"[they]"must provide written notice to the applicant within 3o days of
receipt of the application,clearly and specifically delineating all missing documents or information." Under federal law,
an Eligible Facilities Request is deemed granted with written notification in sixty(6o)days after an application is filed
with a local jurisdiction,excluding tolling.
T-Mobile proposes to modify the"I-5&Highway 217 Tower"as follows:
Install(3)antennas,(i)junction box,and(i)hybrid cable on existing tower.T-Mobile also proposes to
replace(1)router;and install(i)junction box and(9)baseband modules within existing cabinet within
existing compound.
Itemized list of submittal documents:
• (i)Cover Letter
• (1)Commercial Building Permit Application
• (i)Collocation Supplemental Questionnaire
• (2)Structural Analysis stamped by Oregon State engineer
• (2)Construction Drawings stamped by Oregon State engineer— ii"xi7"print
T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval
of requests to modify existing personal wireless service facilities. If you should require more information regarding the
Spectrum Act,please do not hesitate to contact me with your questions.
The Foundation for a Wireless World.
CrownCastle.com
CROWN 1505 Westlake Ave N, Phone: (206) 336.3204
Seattle,WA 98109 Fax
CASTLE www.crowncasUe oom
Sincerely,
4
Sarah Baird
Sarah.Baird@crowncastle.com
(206)336-3204
The Foundation for a Wireless World.
CrownCastle.com