Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
CITY OF TIGARD BUILDING PERMIT 111 _ COMMUNITY DEVELOPMENT Permit#: BUP2020-00211 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/4/2020 T t G A R D g Parcel: 2S101 DA02000 Jurisdiction: Tigard Site address: 6980 SW VARNS ST Project: Madrona Recovery Fence Subdivision: YARNS ACRES Lot: 3 Project Description: New site security fence-designed to match existing design/engineering at adjacent Madrona property Contractor: B&G BUILDERS Owner: MRC RE LLC 4213 NE ALBERTA ST 7000 SW VARNS ST PORTLAND, OR 97218 TIGARD, OR 97223 PHONE: 503-839-4030 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 10/19/2020 $464.97 Demolition Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 10/19/2020 $55.80 Dwelling Units: 0 Plan Review 10/05/2020 $302.23 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 10/19/2020 $102.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 10/19/2020 $2.00 Value: $25,600 11x17) Info Process/Archiving-Sm$0.50(up to 10/19/2020 $6.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total S933.00 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You/may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. { Issued By: c V`�V Per hittee e nexts ignature inspectionO ate,et ekki2v�Call 503.639.4175 by 7:00 a.m. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application "12t ho— a Commercial FOR OFFICE USE ONLY City of Tigard y}�� pg^�� qy, E De Received w�[/�2 - g 1 l R'..� F6' f,�.L! Date/By: /O'DI�L,(/�� Permit No.: l� 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review Phone: 503-718-2439 Fax: 503-598-1960 SEP 21 2020 Date/By: 10..6 49,0 Related Permit: TIGARD Inspection Line: 503-639-4175 Date Ready/By: J n 1l"rL]iris: ® See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: /0 j f 9/2.(.' !•(t0 Supplemental Information BUILDING DIVISION EM V afLew TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING El New construction El Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El1-and 2-family dwelling ElCommercial/industrial Valuation: $ ElAccessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 6980 SW Varns Street New dwelling area: square feet City/State/ZIP: Portland, OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name: Madrona Recovery Fence Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: 2S101 DA02000 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. New site security fence-designed to match existing design/engineering Valuation: $ 25,600 at adjacent Madrona property. Existing building area: square feet New building area: square feet Et PROPERTY OWNER ❑ TENANT Number of stories: Name: John Thornton Type of construction: Address: 7000 SW Varns Street Occupancy groups: City/State/ZIP: Portland, OR 97223 Existing: Phone:(503 )749-0200 Fax:( ) New: ® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Access Architecture �d2'23n2 Structural plan review fee(or deposit): Contact name: Brendan Sanchez, AIA FLS plan review fee(if applicable): Address: 400 Columbia Street, Ste 120 Total fees due upon application: City/State/ZIP: Vancouver, WA 98660 Amount received: Phone:(360)326 1221 Fax::( ) E-mail: brendan@access-arch.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: B&G Builders Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 4213 NE Alberta Street Solar Installation Specialty Code checklist. Permit fee(includes plan review City/State/ZIP: Portland, OR 97218 $180.00and administrative fees): Phone:( 503)839 4030 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Tic.: 197519 �f Total fee due upon application: $201.60 • Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Brend n Sa chez Date: 9/15/2020 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM PemdtApp.doc Rev.04/21/2014 440-4613T(II/02/COM/WEB) i City of Tigard i 4 COMMUNITY DEVELOPMENT DEPARTMENT Ilk s T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: 2d-eZ2// Site Address: 6980 SW Varns St Suite/Bldg#: Project Name: Madrona Recovery Center (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: New 8' tall site security fence ElVerify site address/suite# exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes ❑r No ❑. Land Use Case#: MMD2020-00032 ❑r Plans Match Approved Land Use: 1 12 S. - Plan .ndscape Plan q' •ther: ���� than Forestry Plan 'i�$I levation Plan 12 :u. ding Height: Maximum Height 8' Actual Height 8' t$, onditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance ElBusiness License: Exists: ❑r Yes ❑ No,applicant was provided a business license application liI. 'ublic Facilities Improvement (PFI) Permit: Required: ❑ Yes, applicant was notified El No Applied For: ❑ Yes ❑ No, stop intake Notes: L Approved by Planning: Date: 9/23/20 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: e"?-24242b Site Plans: # ?j Building Plans: # J Building Permit#: nter building ermit#above. Workflow Routing: Planning e 0—Permit 0-Permit Coordinator El—Building Workflow Sign-off: ©'Sign-off for Planning(include notes from planning review) Route Application Documents: Q-Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: /O&/-2c20 l:\Building\Farms\BldgPermitRvw_COM_WithLandU se_111819.docx Engineering Review Slope at building pad: I_1 PFI Permit#: {9/A- L'IConditions "Met"prior to issuance of building permit h lG- ErEasements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) n/G` l Water Quality/Quantity Facility: �y Assess Water Quality Fee in-lieu: ❑ Yes lnEr/No Assess Water Quantity Fee in-lieu: ❑ Yes Lny NNo LIDA Facility on lot: El Yes L�'1v`o ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: 1.Y,y," . Date: /o/s/ a 2d Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes §N/A Tigard Trans SDC: ❑ Yes N/A y Parks SDC: El YesN/A WOK to Issue Permit Approved by Permit Coordinator: Date: J 01b/10 1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_l 11819.docx Building Permit Application 9121 ho- g Commercial FOR OFFICE USE ONLY c �/� J - City of Tigard ' RE EIVC�, /0'O�-(..[/�— %-/// Permit No.:�y�' � `� / 111 • DateBReceived 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review Phone: 503-718-2439 Fax: 503-598-1960 SEP 21 2020 Date/B : Related Permit: Tl GARD Inspection Line: 503-639-4175 Date Ready/By: � See® Page 2 for • Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: Supplemental Information BUILDING DIVISION TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling 1A Commercial/industrial Valuation: $ ElAccessory building ❑Multi-family Number of bedrooms: ElMaster builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 6980 SW Varns Street New dwelling area: square feet City/State/ZIP: Portland, OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name: Madrona Recovery Fence Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: 2S101 DAO2000 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. New site security fence-designed to match existing design/engineering Valuation: $ 25,600 at adjacent Madrona property. Existing building area: square feet New building area: square feet ® PROPERTY OWNER ❑ TENANT Number of stories: Name: John Thornton Type of construction: Address: 7000 SW Varns Street Occupancy groups: City/State/ZIP: Portland, OR 97223 Existing: Phone:(503 )749-0200 Fax:( ) New: IEI APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer la fee schedule) Business name: Access Architecture Structural plan review fee(or deposit):r502,23 Contact name: Brendan Sanchez, AIA FLS plan review fee(if applicable): Address: 400 Columbia Street, Ste 120 Total fees due upon application: City/State/ZIP: Vancouver, WA 98660 Amount received: Phone:(360)326 1221 Fax: :( ) E-mail: brendan@access-arch.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: B&G Builders Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 4213 NE Alberta Street Solar Installation Specialty Code checklist. City/State/ZIP: Portland, OR 97218 Permit fee(includes plan review $180.00 and administrative fees): Phone:( 503)839-4030 / Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: 197519 f/ Total fee due upon application: $201.60 Authorized signature: /o� This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Brendan Sa ichez Date: 9/15/2020 * Fee methodology set by Tr Connty Building Industry Service Board. 1:1Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)