Loading...
Permit CITY OF TIGARD BUILDING PERMIT 1111 COMMUNITY DEVELOPMENT Permit#: BUP2020-00207 tGARo 13125SWHallBlvd.,TigardOR97223 503.718,2439 Date Issued: 10/19/2020 T Parcel: 2S112AA00900 Jurisdiction: Tigard Site address: 14140 SW 72ND AVE 130 Project: Hobby King Subdivision: 1992-007 PARTITION PLAT Lot: 1 Project Description: Add(25)bays of selective pallet racking to match existing previously permitted and installed pallet racking Contractor: TOTAL HANDLING SOLUTIONS INC Owner: ICON OWNER POOL 1 WEST LLC 16420 SE MCGILLIVRAY SUITE 103-363 BY RYAN VANCOUVER,WA 98683 PO BOX 460169 HOUSTON,TX 77056 PHONE: 503-327-8473 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IA Permit Fee-Additions,Alterations, 10/19/2020 $301.85 Demolition Occupancy Grp: S-2 Occupancy Load: 0 12%State Surcharge-Building 10/19/2020 $36.22 Dwelling Units: 0 Plan Review 10/12/2020 $196.20 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 10/19/2020 $120.74 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 10/19/2020 $8.00 Value: $14,190 11x17) Info Process/Archiving-Sm$0.50(up to 10/19/2020 $12.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $675.01 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: j� /1, ] � ^ct- n Permittee Signature: On .app6 at(X1 �ls V"' `y(,�Call 503.639.4175 by 7:00 a.m.for the next available inspection date. �+ This permit card shall be kept In a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application REOF-IVED Commercial FOR of li( l: t sF:ONLI City of Tigard S E P 0 ; o e/Bed ICJ- . -- i pp dClP2et20-0620�' '1�� Permit No.. . 13125 Er Phone S50 Hall Blvd9 Tigard,OR 97223 ^ITl `-+ - ^- D Plan Re ie v t- i i t.,iH fi U �y Related Permit Phone: 503-718-2439 Fax: 503-598- DaceiB : Idill Inspection Line: 503-639-4175 b ILDING DIVISION DateReadyBy: Ann- 0 See Page 2 for TIGAR . Internet: www,tigard-orgov Notified/Method'�O /'. !.19 d Supplemental Information LT7 ; /4-- Lc'/ [-- TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El1-and 2-family dwelling ElCommerciallindustrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑ Master builder ®Other:Pallet rack Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:14140 SW 72nd Ave New dwelling area: square feet City/State/ZIP:Portland, OR 97224 f-fo 6131 le—1"-$Fr-- Garage/carport area: square feet Suite/bldg./apt.4: I 3 0 Project name:Pallet rack expansion project Covered porch area: square feet Cross street/directions to job site: Deck area: square feet SW 72nd Ave & SW Landmark Ln. Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map%parcel#: Indicate the value(rounded to the nearest dollar)of all equipment-materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Add (25) bays of selective pallet racking to match existing Valuation: $14190 previously permitted and installed pallet racking. Existing building area: 14,700 square feet New building area: 831 square feet 0 PROPERTY OWNER 0 TENANT Number of stories: 1 Name:Hobby King Type of construction: Address:14140 SW 72nd Ave Occupancy groups:S-1 City/State/ZIP:Portland, OR 97224 Existing:S-1 Phone:( 5031329-3054 Fax:l I New:S-1 ® APPLICANT ® CONTACT PERSON BUILDING PERMIT REES* (Pfeaser4fer to fee srkedrdr} Business name:Toyota Lift Northwest Structural plan review fee(or deposit): it9 ,2_6") Contact name:Will Tooker FLS plan review fee(if applicable): Address:19305 72nd Ave S City/State/ZIP:Kent, WA 98032 Total fees due upon application: Amount received. Phone:(253 263-0196 1-.)x i ) F-mail:Wtooker@toyotallftnW.COm PHOTOVOLTAIC SOLAR.PANEL SYSTEM FEES" Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photovoltaic Solar Panel System. Business name:Total Handling Solutions, Inc Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:16420 SE McGillivray, Ste. 103-363 Solar Installation Specialty Code checklist. City/State/ZIP:Vancouver, WA 98683 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503-481-6468 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.:218961 _ Total fee due upon application: $201.60 Authorized signature: / This permit application expires if a permit is not obtained v�/ l within ISO days after it has been accepted as complete. Print name: ff, 11 T pv E e r Date: ql f I 2_, * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(I 1/02/COM/WEB) 1 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT i : ; • Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 14,190.00 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 3,547.50 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Budding\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard. Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ® map&tax lot# ® project name ® site address ® suite number ® zoning ® applicant name ® phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requitement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. L\Building\Permits\BUP_COM_PetnvtApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. 1:\Building\Permits\Bt1P_COM_PrrmitApp.doc Rev.03/05/2019 r Will Tooker From: #Building Permit Technicians <TigardBuildingPermits@tigard-or.gov> Sent: Friday, August 28, 2020 10:14 AM To: Will Tooker � � Subject: RE: Rack Building Permit questions - 14140 SW 72nd Ave, 130 1 ' --.' - `,"„0 SEP 0 9 202u Yes, please send to City of Tigard—Building Division, 13125 SW Hall Blvd,Tigard, OR 97223. CITY y r- ,, )A1 ; BUILDING DIVISION Thank you! Dianna L. Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From:Will Tooker<WTooker@toyotaliftnw.com> Sent: Friday, August 28, 2020 10:09 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE: Rack Building Permit questions- 14140 SW 72nd Ave, 130 Hi Diana, Good morning. Thank you for the quick response. Can I mail this package in to your office? I'm in Kent WA. Will Tooker Project Manager of Sales—.Storage and Automation A i ALI Forklifts& Material Handling'Pacific Northwest Cell: 253-263-0196 E: wtooker@toyotaliftnw.com W: toyotaliftnw.com f From:#Building Permit Technicians<TigardBuildingPermits@7tigard-or.gov> Sent: Friday,August 28, 2020 9:51 AM To: Will Tooker<WTooker@toyotaliftnw.com> Subject: RE: Rack Building Permit questions- 14140 SW 72nd Ave, 130 Hello Will, The original permit BUP2020-00127 received final inspection and the permit is closed so you will need to submit for a new permit. 1 We do not have electronic document review system at this time, and our office is closed to the public,so we require hard copies of application materials be submitted to a drop box in the lobby of the Permit Center, Monday-Thursday, 8 am to 5 pm. We are closed on Fridays. No appointment is necessary for submittals. I have attached the commercial building permit application that lists the submittal requirements. Please provide the completed/signed application including project valuation, (3) copies of plans and (2)copies of engineering/calculations, if applicable. Thank you. Dianna L.Ornelas Building Division Services Supervisor City of Tigard I Community Development 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From: Will Tooker<WTooker@toyotaliftnw.com> Sent: Friday, August 28, 2020 9:01 AM To:#Building Permit Technicians<TigardBuildingPermits(a tigard-or.gov> Subject: Rack Building Permit questions Good morning, It looks like I didn't include the new stamped drawings and calculations in my previous email. Please supplement my previous submittal with these attachments. Thank you. Will Tooker Project Manager of Sales—Storage and Automation f- ig..; TN w.R X.. Forklifts&Material Handling—Pacific Northwest Cell: 253-263-0196 E: wtooker@toyotaliftnw.com W:toyotaliftnw.com if i ' j li From:Will Tooker Sent:Thursday,August 27,2020 12:43 PM To: 'tigardbuildingpermits@tigard-or.gov'<tigardbuildingpermits@tigard-or.gov> Cc: Kevin Dean<KDean@toyotaliftnw.com> Subject: Rack Building Permit questions. Dear City of Tigard Rep, 2 Hello and good afternoon. My name is Will Tooker, I'm the Project Manager here at Toyota Lift Northwest. We have offices in Kent,WA and Clackamas OR. We are working with our customer Hobby King, on a pallet rack expansion project. They filed for a racking permit on 06/03/2020 of this year, through their Installation contractor, B&B Installation. Hobby_King_BU P2020-00127 Our project consists of adding a few rows of racking that would match the previous design. It is our understanding that since the previous project was permitted only 2 months ago and that this expansion is identical in nature,this expansion may be able to fall under the same permit? I've attached our stamped drawings and calculations for your review. Please let me know. Thank you. Will Tooker Project Manager of Sales-Storage and Automation L.+,A A./ r� wrotor . Forklifts&Material Handling ^'Pacific Northwest Cell: 253-263-0196 E:wtooker@toyotaliftnw.com W:toyotaliftnw.com Nir Altic _ Will Tooker Tayatatift Northwest Project Manager of Sales-St... Sales Kent 2-53,:E3 9E..Mobile ,i5a2 2E'-43:3 Horne 7025 South 193rd Street Kent,WA 98032 DISCLAIMER: E_maiis sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules'City General Records Retention Schedule." 3