Loading...
Correspondence (4) Pence Construction, LLC 5400 Meadows Road Suite 400 Lake Oswego, Oregon 97035 Transmittal., „,F C ¢y..., CONSTRUCTION 503/399-7223, FAX / No 0576 I ..s AUG 1 0 2020 CITY` SUILDiNV PROJECT: Tigard High School Modernization Project DATE: Aug 07,2020 To: Bassetti Architects P.S.,P.C. RE: THS-Tig Stair 04,06,07,08,09,12,13 Shop Drawings-R&R 721 NW 9th Avenue,Suite 350 Portland OR 97209 ATTN: Greg Vohs JOB: 317-045 WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ✓ Shop Drawings ✓ Approval Approved as Submitted Letter Your Use Approved as Noted Prints As Requested Returned After Loan Change Order Review and Comment Resubmit Plans Submit Samples SENT VIA: Returned Specifications Attached I Separate Cover Returned for Corrections Other: Due ✓ Submittal: Other: Line Item Package Code Rev. QTY Date Description Status 1 Attachment 99511333 0 Aug 07,2020 TIG-814-Submittal#12.4 S1 Stairs STAMPED REMARKS THS-Tig Stair 04,06,07,08,09,12,13 Shop Drawings-R&R REVIEWED THIS REVIEW IS NOT AN APPROVAL OF ANY DEVIATION FROM THE REQUIREMENTS OF THE cc: CONTRACT DOCUMENTS. Pence Construction,LLC,Carl Schrank DATE:&108/07120) APPROVED BY:(Jenniler Fowles) Pence Construction,LLC, Daniel Jeffery Pence Construction,LLC,Eric Wren 11.12"Lam' Pence Construction, LLC,Jason Stanek 503 252.3802 Pence Construction,LLC,Kurt Schwabauer Pence Construction,LLC,Franto Sternot Bassetti Architects P.S.,P.C.,Bassetti Distribution List Bassetti Architects P.S.,P.C.,Rebecca Walker Otak,Inc.,Wesley Winship Signed: �/ lei"""Orin/HI Jennifer Fowles ADVANCE5i. --A Welding & Steel Inc. e4s, - - VIs Ti''-E6 25,t•wvy 95 N c> GrattgevIll€i.ID 835. !' P'.208.983.7608^F 208.983.762 f pp ` w 6 1 t .>A..- E/E r Date: 8/6/2020 Page 1 of 3 AUG 1 0 2020 Transmittal#: 12.4 CITY OFTIG Job#: TIG-814 BUQD NG DiVIS O Tigard High School Modernization Customer PO#:Neil Bruegeman Submittal#12.4 Si Stair To: DSL Builders Attention: Jeff Goodrich 1380 Hines St SE Salem,OR 97302 Sent Via: Email We are sending you enclosed, the following: Erection Drawings Shop Drawings Included are I set and 67 prints. TO BE RETURNED BY: D A CE.D Welding & Steel Inc. QTIrIED 25t Hwy 95 N Gsangsvelie,ID 835 v: P. 208,983.76080 F:208.983.7 "' Date: 8/6/2020 AUG 1 0 2020 Page 2 of 3 Transmittal#: 12.4 CITY OFTI N;O BUILDING DIVISION Job#: TIG-814 Tigard High School Modernization Customer PO#:Neil Bruegeman Submittal #12.4 SI Stair Drawing Number Revision Description Date Detailed/Revised 9601,9602 1 12/23/2019 9701 -9703 1 1/7/2020 9704 0 12/20/2019 11001 0 12/20/2019 11002 1 1/7/2020 11003, 11004 0 12/20/2019 11101 0 12/20/2019 11102 1 1/7/2020 11103 0 12/20/2019 11601, 11602 1 1/7/2020 11701 - 11705 1 1/7/2020 11707 0 12/20/2019 11801 - 11806 1 1/7/2020 12601 1 1/7/2020 12701 - 12703 1 1/7/2020 13601 I 1/7/2020 13701, 13702 1 1/7/2020 13703 0 12/20/2019 14601 1 1/7/2020 14701, 14702 1 1/7/2020 16701 - 16703 1 1/7/2020 17601 1 1/7/2020 17701, 17702 0 12/20/2019 18601 1 1/7/2020 18701, 18702 1 1/7/2020 21701,21702 1 1/7/2020 21703 0 12/20/2019 22701,22702 0 12/20/2019 23701,23702 1 1/7/2020 E9001,E9002 0 12/20/2019 Welcing & Steel Inc. (1 f. iflA LI. 257 - 95 N ;, Gran erlle,ID8� EcEip`"° a€r� P:208 983 7608 F 206.983.7621� = " Date: 8/6/2020 AUG 1 0 2020 Page 3 of 3 CITY OF" IGF :D Transmittal#: 12.4 BUILDING DIVISION Job#: TIG-814 Tigard High School Modernization Customer PO#:Neil Bruegeman Submittal #12.4 S1 Stair E11001, E11002 0 12/20/2019 E12001 0 12/20/2019 E13001 0 12/20/2019 E14001 0 12/20/2019 E16001 0 12/20/2019 E17001 0 12/20/2019 E18001 0 12/20/2019 E21001 0 12/20/2019 E22001 0 12/20/2019 E23001 0 12/20/2019 This material is being transmitted for the purpose listed below: For Approval Delaying the return of approved submittals will delay the delivery of materials. Remarks: Spec Section: 05 12 00 If enclosures are not as noted,please notify at once. Advanced Welding and Steel,Inc Copy To: Brian Gennette By: Neil Bruegeman